SEn t erg y Entergy Nuclear Operations, Inc.
Pilgnm Station 600 Rocky Hill Road Plymouth, MA 02360 William J. Riggs Director, Nuclear Assessment November 14, 2002 U.S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, D.C. 20555
SUBJECT:
Entergy Nuclear Operations, Inc.
Pilgrim Nuclear Power Station Docket No.: 50-293 License No.: DPR-35 October 2002 Monthly Operating Report LETTER NUMBER:
2.02.101
Dear Sir or Madam:
In accordance with Pilgrim Nuclear Power Station Technical Specification 5.6.4, the operational status summary for Pilgrim Nuclear Power Station is provided in the attachment for your information and planning. Should you have questions or comments concerning this report, please contact Jim Haley at (508) 830-8143.
Sincerely, JRH/dd
Attachment:
October 2002 Monthly Operating Report (2 pages) cc: Mr. Hubert Miller Regional Administrator, Region I U.S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406 Senior Resident Inspector 202101
Attachment OPERATING DATA REPORT DOCKET NO.
UNIT NAME:
DATE:
COMPLETED BY:
TELEPHONE:
50-293 Pilgrim November 14, 2002 J. R. Haley (508) 830-8143 Design Electrical Rating (MWe-Net):
655 Maximum Dependable Capacity (MWe-Net):
653 REPORTING PERIOD:
October 2002 (Month/Year)
Hours in Reporting Period Number of Hours the Reactor was Critical Number of Hours the Generator was On Line Unit Reserve Shutdown Hours Net Electrical Energy (MWH)
MONTH 745.0 745.0 745.0 0.0 496,480.3 YEAR TO DATE 7,296.0 7,296.0 7,296.0 0.0 4,797,630.3 CUMULATIVE 262,056.0 181,771.8 176,551.8 0.0 105,704,057.3 202101
[1]
[2]
[3]
[4]
[5]
DOCKET NO.
NAME:
COMPLETED BY:
TELEPHONE:
REPORT MONTH:
50-293 Pilgrim J.R. Haley (508) 830-8143 October 2002 OPERATIONAL
SUMMARY
The plant entered the reporting period at approximately 100 percent Core Thermal Power (CTP) where it was essentially maintained throughout the reporting period.
UNIT SHUTDOWNS METHOD OF CAUSE/CORRECTIVE ACTION/COMMENTS NO.
DATE TYPE DURATION REASON SHUTTING 1
(HOURS) 2 DOWN REACTOR 3
1 2
3 F-Forced S - Scheduled A - Equip Failure B - Main or Test C - Refueling D - Regulatory Restriction E - Operator Training &
License Examination F-Admin G - Operation Error H - Other 1 - Manual 2 - Manual Scram 3 - Auto Scram 4 - Continuation 5 - Other 202101