- E Entergy Entergy Nuclear Operations, Inc.
Pilgrim Station 600 Rocky Hill Road Plymouth, MA 02360 William J. Riggs Director, Nuclear Assessment May 12, 2003 U.S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, D.C. 20555
SUBJECT:
Entergy Nuclear Operations, Inc.
Pilgrim Nuclear Power Station Docket No.: 50-293 License No.: DPR-35 April 2003 Monthly Operating Report LETTER NUMBER:
2.03.068
Dear Sir or Madam:
In accordance with Pilgrim Nuclear Power Station Technical Specification 5.6.4, the operational status summary for Pilgrim Nuclear Power Station is provided in the attachment for your information and planning. Should you have questions or comments concerning this report, please contact Jim Haley at (508) 830-8143.
Sincerely, JRH/dd
Attachment:
April 2003 Monthly Operating Report (2 pages) cc: Mr. Hubert Miller Regional Administrator, Region I U.S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406 Senior Resident Inspector 203068 ICf
Attachment OPERATING DATA REPORT DOCKET NO.
UNIT NAME:
DATE:
COMPLETED BY:
TELEPHONE:
50-293 Pilcirim May 12, 2003 J. R. Haley (508) 830-8143 Design Electrical Rating (MWe-Net):
655 Maximum Dependable Capacity (MWe-Net): 653 REPORTING PERIOD:
APril 2003 (MonthNear)
[1]
Hours in Reporting Period
[2]
Number of Hours the Reactor was Critical
[3]
Number of Hours the Generator was On Line
[4]
Unit Reserve Shutdown Hours
[5]
Net Electrical Energy (MWH)
MONTH 719.0 439.0 434.0 0.0 283,436.5 YEAR TO DATE 2879.0 2410.0 2388.0 0.0 1,560,654.1 CUMULATIVE 265,655.0 184,902.8 179,677.8 0.0 108,236,150.4 203068
DOCKET NO.
NAME:
COMPLETED BY:
TELEPHONE:
REPORT MONTH:
50-293 Pilgrim J.R. Haley (508) 830-8143 April 2003 OPERATIONAL
SUMMARY
The plant entered the reporting period at - 100% power where it was essentially maintained until 15:00 hours on April 18 when the scheduled power reduction was commenced to shutdown for RFO-14. By 19:55 hours, the power had been lowered to 30%. At 3:02 hours on April 19 Pilgrim was removed from the grid. At 08:44 on April 19 the mode switch was moved to refuel. Refueling activities continued the remainder of the reporting period.
UNIT SHUTDOWNS METHOD OF CAUSE/CORRECTIVE ACTION/COMMENTS NO.
DATE TYPE DURATION REASON SHUTTING 1
(HOURS) 2 DOWN REACTOR 3
1 4/19/03.
S C
1 Shutdown for refueling outage 14 1
2 3
F - Forced S - Scheduled A - Equip Failure B - Main or Test C - Refueling D - Regulatory Restriction E - Operator Training &
License Examination F-Admin G - Operation Error H - Other 1 - Manual 2 - Manual Scram 3 - Auto Scram 4 - Continuation 5 - Other 203068