ML032731396

From kanterella
Jump to navigation Jump to search
August 2003 Monthly Operating Report for Pilgrim Nuclear Power Station
ML032731396
Person / Time
Site: Pilgrim
Issue date: 09/15/2003
From: Riggs W
Entergy Nuclear Operations
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
2.03.105
Download: ML032731396 (3)


Text

-- Entergy Entergy Nuclear Operations, Inc.

Pilgrim Station 600 Rocky Hill Road Plymouth, MA 02360 William J. Riggs Director, Nuclear Assessment September 15, 2003 U.S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, D.C. 20555

SUBJECT:

Entergy Nuclear Operations, Inc.

Pilgrim Nuclear Power Station Docket No.: 50-293 License No.: DPR-35 August 2003 Monthly Operating Report LETTER NUMBER:

2.03.105

Dear Sir or Madam:

In accordance with Pilgrim Nuclear Power Station Technical Specification 5.6.4, the operational status summary for Pilgrim Nuclear Power Station is provided in the attachment for your information and planning. Should you have questions or comments concerning this report, please contact Jim Haley at (508) 830-8143.

Sincerely, R.is JRH/dd

Attachment:

August 2003 Monthly Operating Report (2 pages) cc: Mr. Hubert Miller Regional Administrator, Region I U.S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406 Senior Resident Inspector 1;-11' 203105

'T.

Attachment OPERATING DATA REPORT DOCKET NO.

UNIT NAME:

DATE:

50-293 Pilgrim September 15. 2003 COMPLETED BY:

TELEPHONE:

J. R. Haley (508) 830-8143 Design Electrical Rating (MWe-Net):

708.5 Maximum Dependable Capacity (MWe-Net): 684.7 REPORTING PERIOD:

August 2003 (Month/Year)

[1]

[2]

[31

[41

[5]

Hours in Reporting Period Number of Hours the Reactor was Critical Number of Hours the Generator was On Line Unit Reserve Shutdown Hours Net Electrical Energy (MWH)

MONTH 744.0 744.0 744.0 0.0 498,276.3 YEAR TO DATE 5831.0 4977.8 4885.0*

0.0 3,184,037.6 CUMULATIVE 268,607.0 187,470.6 185,281.8 0.0 109,859,533.9

  • Includes hours omitted in June report.

203105

\\4 DOCKET NO.

NAME:

COMPLETED BY:

TELEPHONE:

REPORT MONTH:

50-293 Pilgrim J.R. Haley (508) 830-8143 Auaust 2003 OPERATIONAL

SUMMARY

Pilgrim entered the reporting period operating at full licensed thermal power (2028 MWt). On August 71 Pilgrim reduced power to -45% to perform a planned thermal backwash. Full power was restored at 6:19 a.m. on August 8 where it was maintained until a planned maintenance and testing downpower to -38% was initiated on August 27. Power was restored to 100% on August 28 where it was maintained for the remainder of the reporting period.

UNIT SHUTDOWNS METHOD OF CAUSE/CORRECTIVE ACTION/COMMENTS NO.

DATE TYPE DURATION REASON SHUTTING 1

(HOURS) 2 DOWN REACTOR 3

4

4.
4.

I 4

4 I

A -

A I

I A

1 2

3 F - Forced S - Scheduled A - Equip Failure B - Main or Test C - Refueling D - Regulatory Restriction E - Operator Training &

License Examination F-Admin G - Operation Error H - Other 1 - Manual 2-Manual Scram 3 - Auto Scram 4 - Continuation 5 - Other 203105