Category:Letter
MONTHYEARML24240A1692024-09-18018 September 2024 Cy 2023 Summary of Decommissioning Trust Fund Status IR 05000293/20240022024-08-21021 August 2024 NRC Inspection Report No. 05000293/2024002 PNP 2024-030, Update Report for Holtec Decommissioning International Fleet Decommissioning Quality Assurance Program Rev. 3 and Palisades Transitioning Quality Assurance Plan, Rev 02024-08-0202 August 2024 Update Report for Holtec Decommissioning International Fleet Decommissioning Quality Assurance Program Rev. 3 and Palisades Transitioning Quality Assurance Plan, Rev 0 ML24151A6482024-06-0303 June 2024 Changes in Reactor Decommissioning Branch Project Management Assignments for Some Decommissioning Facilities ML24129A1042024-05-26026 May 2024 Preapplication Readiness Assessment Plan for the Holtec Decommissioning International License Termination Plan ML24136A2382024-05-14014 May 2024 Annual Radiological Environmental Operating Report for 2023 ML24135A3212024-05-14014 May 2024 Annual Radioactive Effluent Release Report, January 1 Through December 31, 2023 IR 05000293/20240012024-05-0707 May 2024 NRC Inspection Report No. 05000293/2024001 L-24-009, HDI Annual Occupational Radiation Exposure Data Reports - 20232024-04-29029 April 2024 HDI Annual Occupational Radiation Exposure Data Reports - 2023 L-24-010, Request for Preapplication Readiness Assessment of the Draft License Termination Plan2024-04-22022 April 2024 Request for Preapplication Readiness Assessment of the Draft License Termination Plan L-24-007, Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations – Holtec Decommissioning International, LLC (HDI)2024-03-29029 March 2024 Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations – Holtec Decommissioning International, LLC (HDI) IR 05000293/20230032024-02-29029 February 2024 NRC Inspection Report Nos. 05000293/2023003 and 05000293/2023004 L-24-002, Late LLRW Shipment Investigation Report Pursuant to 10 CFR 20, Appendix G2024-02-0202 February 2024 Late LLRW Shipment Investigation Report Pursuant to 10 CFR 20, Appendix G ML23342A1182024-01-0909 January 2024 Independent Spent Fuel Storage Installation Security Inspection Plan L-23-019, Proof of Financial Protection 10 CFR 140.152023-12-18018 December 2023 Proof of Financial Protection 10 CFR 140.15 ML23334A1822023-11-30030 November 2023 Biennial Report for the Defueled Safety Analysis Report Update, Technical Specification Bases Changes, 10 CFR 50.59 Evaluation Summary, and Regulatory Commitment Change Summary – November 2021 Through October 2023 L-23-012, Master Decommissioning Trust Agreement Changes for Indian Point Nuclear Generating Units 1, 2 and 3, Pilgrim Nuclear Power Station, Palisades Nuclear Plant and the Non-Qualified Trust for Big Rock Point2023-11-13013 November 2023 Master Decommissioning Trust Agreement Changes for Indian Point Nuclear Generating Units 1, 2 and 3, Pilgrim Nuclear Power Station, Palisades Nuclear Plant and the Non-Qualified Trust for Big Rock Point ML23306A0992023-11-0202 November 2023 And Indian Point Energy Center, Notification of Changes in Schedule in Accordance with 10 CFR 50.82(a)(7) ML23300A0022023-10-27027 October 2023 10 CFR 72.48 Biennial Change Summary Report IR 05000293/20234012023-08-31031 August 2023 NRC Inspection Report No. 05000293/2023401 & 2023001 (Cover Letter Only) IR 05000293/20230022023-08-0404 August 2023 NRC Inspection Report No. 05000293/2023002 ML23143A0872023-05-23023 May 2023 Correction to Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations – Holtec Decommissioning International, LLC (HDI) ML23135A2152023-05-15015 May 2023 Annual Radioactive Effluent Release Report, January 1 Through December 31, 2022 ML23136A7792023-05-15015 May 2023 Annual Radiological Environmental Operating Report, January 1 Through December 31, 2022 L-23-004, HDI Annual Occupational Radiation Exposure Data Reports - 20222023-04-24024 April 2023 HDI Annual Occupational Radiation Exposure Data Reports - 2022 L-23-003, Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations2023-03-31031 March 2023 Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations ML23088A0382023-03-29029 March 2023 Stations 1, 2, & 3, Palisades Nuclear Plant, and Big Rock Point - Nuclear Onsite Property Damage Insurance ML23069A2782023-03-13013 March 2023 Request for Scoping Comments Concerning the Environmental Review of Monticello Nuclear Generating Plant, Unit 1 Subsequent License Renewal Application ML22361A1022023-02-24024 February 2023 Reactor Decommissioning Branch Project Management Changes for Some Decommissioning Facilities and Establishment of Backup Project Manager for All Decommissioning Facilities IR 05000293/20220042023-02-15015 February 2023 NRC Inspection Report No. 05000293/2022004 ML22356A0712023-01-31031 January 2023 Issuance of Exemption for Pilgrim Nuclear Power Station ISFSI Regarding Annual Radioactive Effluent Release Report - Cover Letter ML22347A2782022-12-21021 December 2022 Independent Spent Fuel Storage Installation Security Inspection Plan Dated December 21, 2022 L-22-042, Oyster, Pilgrim, Indian Point, Palisades and Big Rock Point - Proof of Financial Protection 10 CFR 140.152022-12-14014 December 2022 Oyster, Pilgrim, Indian Point, Palisades and Big Rock Point - Proof of Financial Protection 10 CFR 140.15 L-22-041, Supplemental Information to Enhance Exemption Request Detail for Pilgrim ISFSI Annual Radioactive Effluent Release Report Due Date Extension2022-12-0909 December 2022 Supplemental Information to Enhance Exemption Request Detail for Pilgrim ISFSI Annual Radioactive Effluent Release Report Due Date Extension IR 05000293/20220032022-11-18018 November 2022 NRC Inspection Report No. 05000293/2022003 L-22-036, Decommissioning Trust Fund Agreement2022-11-0808 November 2022 Decommissioning Trust Fund Agreement ML22276A1762022-10-24024 October 2022 Decommissioning International Proposed Revisions to the Quality Assurance Program Approval Forms for Radioactive Material Packages ML22266A1922022-09-23023 September 2022 And Pilgrim Nuclear Power Station - Request to Withdraw Prior Submissions from NRC Consideration ML22272A0352022-09-22022 September 2022 S. Lynch-Benttinen Letter Regarding U.S. Citizen Intent to Sue U.S. Fish and Wildlife and NOAA Fisheries Representing the Endangered Species (Na Right Whale) Which Will Be Adversely Affected by Holtec International Potential Actions ML22269A4202022-09-22022 September 2022 Citizen Lawsuit ML22241A1122022-08-29029 August 2022 Request for Exemption from 10 CFR 72.212(a)(2), (b)(2), (b)(3), (b)(4), (B)(5)(i), (b)(11), and 72.214 for Pilgrim ISFSI Annual Radioactive Effluent Release Report IR 05000293/20220022022-08-12012 August 2022 NRC Inspection Report No. 05000293/2022002 ML22215A1772022-08-0303 August 2022 Decommissioning International (HDI) Proposed Revisions to the Quality Assurance Program Approval Forms for Radioactive Material Packages ML22221A2592022-08-0101 August 2022 LTR-22-0217-1-NMSS - Town of Duxbury Letter Opposing the Irradiated Water Release from Pilgrim (Docket No. 05000293) ML22206A1512022-08-0101 August 2022 NRC Office of Investigations Case Nos. 1-2022-002 & 1-2022-006 ML22193A1662022-07-28028 July 2022 LTR-22-0154-1 - Heather Govern, VP, Clean Air and Water Program, Et Al., Letter Regarding Radioactive Wastewater Disposal from the Pilgrim Nuclear Power Station (Docket No. 05000293) ML22175A1732022-07-28028 July 2022 LTR-22-0153-1 - Response Letter to D. Turco, Cape Downwinders, from A. Roberts, NRC, Regarding Holtec-Pilgrim Plans to Dump One Million Gallons of Radioactive Waste Into Cape Cod Bay ML22154A4882022-06-0101 June 2022 Letter from Conservation Law Foundation Regarding Irradiated Water Release from Pilgrim ML22154A1622022-05-26026 May 2022 Letter and Email from Save Our Bay/Diane Turco Regarding Irradiated Water Release from Pilgrim ML22136A2602022-05-16016 May 2022 Submittal of Annual Radiological Environmental Operating Report for January 1 Through December 31, 2021 2024-09-18
[Table view] Category:License-Monthly Operating Report
MONTHYEARML0507404082005-03-0808 March 2005 February 2005 Monthly Operating Report for Pilgrim Nuclear Power Station ML0504602892005-02-0707 February 2005 January 2005 Monthly Operating Report for Pilgrim Nuclear Power Station ML0502802532005-01-10010 January 2005 December 2004 Monthly Operating Report for Pilgrim Nuclear Power Station ML0435003252004-12-0606 December 2004 November 2004 Monthly Operating Report for Pilgrim Nuclear Power Station ML0432203342004-11-0808 November 2004 October 2004 Monthly Operating Report for Pilgrim Nuclear Power Station ML0429504932004-10-12012 October 2004 September 2004 Monthly Operating Report for Pilgrim ML0426601352004-09-0909 September 2004 August 2004 Monthly Operating Report for Pilgrim Nuclear Power Station ML0423003612004-08-0909 August 2004 July 2004 Monthly Operating Report for Pilgrim Nuclear Power Station ML0420202672004-07-12012 July 2004 June 2004 Monthly Operating Report for Pilgrim Nuclear Power Station ML0416706182004-06-0808 June 2004 May 2004 Monthly Operating Report for Pilgrim ML0413402712004-05-0505 May 2004 April 2004 Monthly Operating Report for Pilgrim ML0410507442004-04-0707 April 2004 March 2004 Monthly Operating Report for Pilgrim ML0407607082004-03-0808 March 2004 February 2004 Monthly Operating Report for Pilgrim Nuclear Power Station ML0405104922004-02-13013 February 2004 January 2004 Monthly Operating Report for Pilgrim Nuclear Power Station ML0402107382004-01-14014 January 2004 December 2003 Monthly Operating Report for Pilgrim Nuclear Power Station ML0335703652003-12-15015 December 2003 November 2003 Monthly Operating Report for Pilgrim Nuclear Power Station ML0335702052003-12-15015 December 2003 November 2003 Monthly Operating Report for Pilgrim Nuclear Power Station ML0331801302003-11-0606 November 2003 October 2003 Monthly Operating Report for Pilgrim Nuclear Power Station ML0329602432003-10-15015 October 2003 September 2003 Monthly Operating Report for Pilgrim ML0327313962003-09-15015 September 2003 August 2003 Monthly Operating Report for Pilgrim Nuclear Power Station ML0323900272003-08-15015 August 2003 July 2003 Monthly Operating Report for Pilgrim Nuclear Power Station ML0320400682003-07-14014 July 2003 June 2003 Monthly Operating Report for Pilgrim ML0317506172003-06-12012 June 2003 May 2003 Monthly Operating Report for Pilgrim ML0314005602003-05-12012 May 2003 April 2003 Monthly Operating Report for Pilgrim ML0310704472003-04-10010 April 2003 March 2003 Monthly Operating Report for Pilgrim Nuclear Power Station ML0307903602003-03-14014 March 2003 February 2003 Monthly Operating Report for Pilgrim ML0305202922003-02-11011 February 2003 January 2003 Monthly Operating Report for Pilgrim Nuclear Power Station ML0302304622003-01-14014 January 2003 December 2002 Monthly Operating Report for Pilgrim Nuclear Power Station ML0235204842002-12-12012 December 2002 November 2002 Monthly Operating Report for Pilgrim ML0232501872002-11-14014 November 2002 October 2002 Monthly Operating Report for Pilgrim Nuclear Power Station ML0229100682002-10-11011 October 2002 September 2002 Monthly Operating Report for Pilgrim ML0223802862002-08-14014 August 2002 July 2002 Monthly Operating Report for Pilgrim Station ML0220404722002-07-11011 July 2002 June 2002 Monthly Operating Report for Pilgrim Nuclear Station ML0217204252002-06-13013 June 2002 May 2002 Monthly Operating Report for Pilgrim ML0214803912002-05-10010 May 2002 April 2002 Monthly Operating Report for Pilgrim Nuclear Power Station ML0211307112002-04-10010 April 2002 March 2002 Monthly Operating Report for Pilgrim Nuclear Power Station ML0210601072002-04-0202 April 2002 January 2002 Monthly Operating Report for Pilgrim Nuclear Power Station ML0208505922002-03-14014 March 2002 February 2002 Monthly Operating Report for Pilgrim Nuclear Power Station ML0206500062002-02-15015 February 2002 January 2002 Monthly Operating Report for Pilgrim Nuclear Power Station ML0204203812002-01-15015 January 2002 December 2001 Monthly Operating Report for Pilgrim Nuclear Power Station 2005-03-08
[Table view] |
Text
Entergy Nuclear Operations, Inc.
lEn te gyPilgrim OFg Station 600 Rocky Hill Road Plymouth, MA 02360 July 12, 2004 U.S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, D.C. 20555
SUBJECT:
Entergy Nuclear Operations, Inc.
Pilgrim Nuclear Power Station Docket No.: 50-293 License No.: DPR-35 June 2004 Monthly Operating Report LETTER NUMBER: 2.04.062
Dear Sir or Madam:
In accordance with Technical Specification 5.6.4, the operational status summary for Pilgrim Nuclear Power Station is provided in the attachment for your information and planning.
There are no commitments contained in this letter. -
Should you have questions or comments concerning this report, please contact me at (508) 830-8403.
Sincerely, Bryan Ford Manager, Licensing MJG/dm
Attachment:
June 2004 Monthly Operating Report (1 page) cc: Mr. Samuel J. Collins Regional Administrator, Region I U.S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406 Senior Resident Inspector 204062 < ,(
- .it 4 f i, IId*!
- "I
.. . 4 AfA."'kPO OPERATING DATA REPORT DOCKET NO. 50-293 UNIT NAME Pilgrim 1 DATE July 12, 2004 COMPLETED BY MaryJ. Gatslick TELEPHONE (508) 830-8373! .i 4 ; I.
REPORTING PERIOD: June 2004
- 1. Design Electrical Rating 690.00
- 2. Maximum Dependable Capacity (MWe-Net) 684.70 This Month Yr-to-Date Cumulative
- 3. Number of Hours the Reactor was Critical 720.00 4,321.58 194,476.48
- 4. Number of Hours Generator On-line 720.00 4,304.92 192,249.87
- 5. Reserve Shutdown Hours 0.00 0.00 0.00
- 6. Net Electrical Energy Generated (MWHrs) 489,061.61 2,942,281.13 114,594,959.5 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause & Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments
SUMMARY
- The unit began the reporting period with the reactor operating at 100% (2028 MWt) power. A planned power reduction commenced on 6/3/04 at 1650 hours0.0191 days <br />0.458 hours <br />0.00273 weeks <br />6.27825e-4 months <br /> for a main condenser thermal backwash. The lowest reactor power during the power reduction was about 47%. 100% reactor power operation was achieved on 6/4/04 at 0848 hours0.00981 days <br />0.236 hours <br />0.0014 weeks <br />3.22664e-4 months <br />. The reactor operated at 100% power (2028 MWt) for the remainder of the reporting period.
1 2 Reason: Method:
A Equipment Failure (Explain) 1 Manual B Maintenance or Test 2 Manual Trip/Scram C Refueling 3 Automatic Trip/Scram D Regulatory Restriction 4 Continuation E Operator Training & License Examination 5 Other (Explain)
F Administration G Operational Error (Explain)
H Other (Explain)