December 2002 Monthly Operating Report for Pilgrim Nuclear Power Station
ML030230462
Person / Time
Site: Pilgrim
Issue date: 01/14/2003
From: Riggs W
Entergy Nuclear Operations
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
Download: ML030230462 (3)


Text

Entergy Nuclear Operations, Inc.

Pilgnm Station SEntergy 600 Rocky Hill Road Plymouth, MA 02360 William J. Riggs Director, Nuclear Assessment January 14, 2003 U.S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, D.C. 20555

SUBJECT:

Entergy Nuclear Operations, Inc.

Pilgrim Nuclear Power Station Docket No.: 50-293 License No.: DPR-35 December 2002 Monthly Operating Report LETTER NUMBER: 2.03.003

Dear Sir or Madam:

In accordance with Pilgrim Nuclear Power Station Technical Specification 5.6.4, the operational status summary for Pilgrim Nuclear Power Station is provided in the attachment for your information and planning. Should you have questions or comments concerning this report, please contact Jim Haley at (508) 830-8143.

Sincerely, JRH/dd

Attachment:

December 2002 Monthly Operating Report (2 pages) cc: Mr. Hubert Miller Regional Administrator, Region I U.S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406 Senior Resident Inspector 203003

I-.

Attachment OPERATING DATA REPORT DOCKET NO. 50-293 UNIT NAME: Pilgrim DATE: January 14, 2003 COMPLETED BY: J. R. Haley TELEPHONE: (508) 830-8143 Design Electrical Rating (MWe-Net): 655 Maximum Dependable Capacity (MWe-Net): 653 REPORTING PERIOD: December 2002 (Month/Year)

YEAR TO MONTH DATE CUMULATIVE

[1] Hours in Reporting Period 744.0 8,760.0 263,520.0

[2] Number of Hours the Reactor was Critical 744.0 8,760.0 183,235.8

[3] Number of Hours the Generator was On Line 744.0 8,760.0 178,015.8

[4] Unit Reserve Shutdown Hours 0.0 0.0 0.0

[5] Net Electrical Energy (MWH) 491,128.2 5,769,069.3 106,675,496.3 203003

'a DOCKET NO. 50-293 NAME: Pilgrim COMPLETED BY: J.R. Haley TELEPHONE: (508) 830-8143 REPORT MONTH: December 2002 OPERATIONAL

SUMMARY

The plant entered the reporting period at approximately 100 percent Core Thermal Power (CTP). At 00:08 hours on December 3, PNPS initiated a planned down-power to 44% CTP to perform a condenser thermal backwash. The reactor was returned to 100% CTP at 00:00 hours on December 4. At 08:40 on December 5 reduced CTP to 85% to perform control rod tests and to adjust the rod pattern. Power was returned to 100% CTP at 20:42 where it was essentially maintained for the rest of the reporting period.

UNIT SHUTDOWNS METHOD OF CAUSE/CORRECTIVE ACTION/COMMENTS NO. DATE TYPE DURATION REASON SHUTTING 1 (HOURS) 2 DOWN REACTOR 3

L ______ I .1. L 1 2 3 F - Forced A - Equip Failure 1 - Manual S - Scheduled B - Main or Test 2 - Manual Scram C - Refueling 3 - Auto Scram D - Regulatory Restriction 4 - Continuation E - Operator Training & 5 - Other License Examination F- Admin G - Operation Error H - Other 203003