SEntergy Entergy Nuclear Operations, Inc.
Pilgnm Station 600 Rocky Hill Road Plymouth, MA 02360 William J. Riggs Director, Nuclear Assessment January 14, 2003 U.S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, D.C. 20555
SUBJECT:
Entergy Nuclear Operations, Inc.
Pilgrim Nuclear Power Station Docket No.: 50-293 License No.: DPR-35 December 2002 Monthly Operating Report LETTER NUMBER:
2.03.003
Dear Sir or Madam:
In accordance with Pilgrim Nuclear Power Station Technical Specification 5.6.4, the operational status summary for Pilgrim Nuclear Power Station is provided in the attachment for your information and planning. Should you have questions or comments concerning this report, please contact Jim Haley at (508) 830-8143.
Sincerely, JRH/dd
Attachment:
December 2002 Monthly Operating Report (2 pages) cc: Mr. Hubert Miller Regional Administrator, Region I U.S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406 Senior Resident Inspector 203003
I-.
Attachment OPERATING DATA REPORT DOCKET NO.
UNIT NAME:
DATE:
COMPLETED BY:
TELEPHONE:
50-293 Pilgrim January 14, 2003 J. R. Haley (508) 830-8143 Design Electrical Rating (MWe-Net):
655 Maximum Dependable Capacity (MWe-Net): 653 REPORTING PERIOD:
December 2002 (Month/Year)
Hours in Reporting Period Number of Hours the Reactor was Critical Number of Hours the Generator was On Line Unit Reserve Shutdown Hours Net Electrical Energy (MWH)
MONTH 744.0 744.0 744.0 0.0 491,128.2 YEAR TO DATE 8,760.0 8,760.0 8,760.0 0.0 5,769,069.3 CUMULATIVE 263,520.0 183,235.8 178,015.8 0.0 106,675,496.3 203003
[1]
[2]
[3]
[4]
[5]
DOCKET NO.
NAME:
COMPLETED BY:
TELEPHONE:
REPORT MONTH:
'a 50-293 Pilgrim J.R. Haley (508) 830-8143 December 2002 OPERATIONAL
SUMMARY
The plant entered the reporting period at approximately 100 percent Core Thermal Power (CTP). At 00:08 hours on December 3, PNPS initiated a planned down-power to 44% CTP to perform a condenser thermal backwash. The reactor was returned to 100% CTP at 00:00 hours on December 4. At 08:40 on December 5 reduced CTP to 85% to perform control rod tests and to adjust the rod pattern. Power was returned to 100% CTP at 20:42 where it was essentially maintained for the rest of the reporting period.
UNIT SHUTDOWNS METHOD OF CAUSE/CORRECTIVE ACTION/COMMENTS NO.
DATE TYPE DURATION REASON SHUTTING 1
(HOURS) 2 DOWN REACTOR 3
1 L ______
I
.1.
L 2
3 F - Forced S - Scheduled A - Equip Failure B - Main or Test C - Refueling D - Regulatory Restriction E - Operator Training &
License Examination F-Admin G - Operation Error H - Other 1 - Manual 2 - Manual Scram 3 - Auto Scram 4 - Continuation 5 - Other 203003