ML20191A017

From kanterella
Jump to navigation Jump to search

NRR E-mail Capture - NRC LIC-109 Acceptance Review Results for Waterford U3 EAL Scheme Change LAR
ML20191A017
Person / Time
Site: Waterford Entergy icon.png
Issue date: 06/26/2020
From: Audrey Klett
NRC/NRR/DORL/LPL4
To: Zamber M
Entergy Nuclear Operations
Klett A
References
L-2020-LLA-0122
Download: ML20191A017 (2)


Text

From:

Klett, Audrey Sent:

Friday, June 26, 2020 12:58 PM To:

Zamber, Maria

Subject:

NRC LIC-109 Acceptance Review Results for Waterford U3 EAL Scheme Change LAR (EPID L-2020-LLA-0122)

Hi Maria, By letter W3F1-2020-0036 dated June 1, 2020 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML20153A457), Entergy Operations, Inc. (the licensee) requested a license amendment to Renewed Facility Operating License No. NPF-38 for the Waterford Steam Electric Station, Unit 3 related to revising the emergency action level scheme described in its emergency plan. The U.S.

Nuclear Regulatory Commission (NRC) staff performs acceptance reviews of applications to determine if the scope and depth of technical information is sufficient for the staff to complete its technical reviews.

The NRC staff also performs an acceptance review to identify whether an application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.

The NRC staff concluded that the licensees submittal provides technical information in sufficient detail to enable the NRC staff to complete its detailed technical review and make an independent assessment regarding the acceptability of the proposed request in terms of regulatory requirements and the protection of public health and safety and the environment. Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, the NRC staff may identify issues that affect its ability to complete the detailed technical review despite completion of an adequate acceptance review. If the NRC staff needs additional information, it will notify the licensee by separate correspondence.

Based on its initial review of the application, the NRC staff estimates that it will take approximately 280 hours0.00324 days <br />0.0778 hours <br />4.62963e-4 weeks <br />1.0654e-4 months <br /> to complete its review of the application and that it will complete its review on or by June 30, 2021. These estimates could change because of several factors, such as requests for additional information, unanticipated addition of application scope, NRC advisory committee reviews, parallel reviews of industry program initiatives or pilot applications, or hearing-related activities. If complexities or challenges during the review cause significant changes to the estimated hours or completion date, the staffs licensing project manager will communicate the new estimates and reasons for the changes to the licensee during routine interactions.

If you have any questions, please contact me at (301) 415-0489 or Audrey.Klett@nrc.gov.

Audrey Klett Project Manager U.S. Nuclear Regulatory Commission Office of Nuclear Reactor Regulation Division of Operating Reactor Licensing Plant Licensing Branch 4 301-415-0489

Hearing Identifier:

NRR_DRMA Email Number:

658 Mail Envelope Properties (MN2PR09MB4700582FEDEF74AB3FB4EBE287930)

Subject:

NRC LIC-109 Acceptance Review Results for Waterford U3 EAL Scheme Change LAR (EPID L-2020-LLA-0122)

Sent Date:

6/26/2020 12:58:15 PM Received Date:

6/26/2020 12:58:15 PM From:

Klett, Audrey Created By:

Audrey.Klett@nrc.gov Recipients:

"Zamber, Maria" <mzamber@entergy.com>

Tracking Status: None Post Office:

MN2PR09MB4700.namprd09.prod.outlook.com Files Size Date & Time MESSAGE 2661 6/26/2020 12:58:15 PM Options Priority:

Normal Return Notification:

No Reply Requested:

No Sensitivity:

Normal Expiration Date: