LR-N03-0259, May 2003 Monthly Operating Report for Salem Generating Station Unit 2

From kanterella
Jump to navigation Jump to search
May 2003 Monthly Operating Report for Salem Generating Station Unit 2
ML031690378
Person / Time
Site: Salem PSEG icon.png
Issue date: 06/11/2003
From: Waldinger L
Public Service Enterprise Group
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
LR-N03-0259
Download: ML031690378 (3)


Text

N o s \ PSEG Nuclear llC P.O. Box 236, Hancocks Bridge, New Jersey 08038-0236 JUN 1 1 2003 o PSEG NuclearLLC LR-N03-0259 U. S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 Gentlemen:

MONTHLY OPERATING REPORT SALEM GENERATING STATION UNIT 2 DOCKET NO. 50-311 In compliance with Section 6.9, Reporting Requirements for the Salem Unit 2 Technical Specifications, the operating statistics for May 2003 are being forwarded.

Sincerely, Operations Director Attachments C Distribution

/S&

9-2168 REV. 7/99

i a ,

DOCKET NO.: 50-311 UNIT: Salem 2 DATE: 616103 COMPLETED BY: F. Todd TELEPHONE: (856) 339-1316 Reporting Period May 2003 OPERATING DATA REPORT Design Electrical Rating (MWe-Net) 1131 Maximum Dependable Capacity (MWe-Net) 1092 Month No. of hours reactor was critical 744 No. of hours generator was on line (service 744 hours0.00861 days <br />0.207 hours <br />0.00123 weeks <br />2.83092e-4 months <br />)

Unit reserve shutdown hours Net Electrical Energy (MWH) 818853 3956692 123145667 UNIT SHUTDOWNS NO. DATE TYPE DURATION REASON METHOD OF CORRECTIVE ACTIONI F=FORCED (HOURS) (1) SHUTTING COMMENT S=SCHEDULED DOWN THE

_______ ________ _ _ _ __ _ REACTO R (2)

= ~~~ I

(1) Reason (2) Method A - Equipment Failure (Explain) I - Manual B - Maintenance or Test 2 - Manual Trip/Scram C - Refueling 3 - Automatic Trip/Scram D - Regulatory Restriction 4 - Continuation E - Operator Training/License Examination 5 - Other (Explain)

F - Administrafive G - Operatonal Error (Explain)

H - Other

DOCKET NO.: 50-311 UNIT: Salem 2 DATE: 6/6/03 COMPLETED BY: R. Ritzman TELEPHONE: (856) 339-1445 Summary Of Monthly Operating Experience

  • Salem 2 entered the month at approximately 100% power.
  • On May 10, power was reduced to approximately 47% for planned Turbine Control Valve Testing.
  • On May 11, after power had been restored, power was reduced to approximately 51% to reseat the 2C MSR Drain Tank Relief Valve. Power was returned to approximately 100% later that day.
  • At the end of the month, Salem 2 completed 60 days of continuous on-line operation.