LR-N05-0557, October 2005 Monthly Operating Report for Salem, Unit 2

From kanterella
Jump to navigation Jump to search
October 2005 Monthly Operating Report for Salem, Unit 2
ML053260518
Person / Time
Site: Salem PSEG icon.png
Issue date: 11/15/2005
From: Joyce T
Public Service Enterprise Group
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
LR-N05-0557
Download: ML053260518 (4)


Text

.:1 I

PSEG Nuclear LLC P.O. Box 236, Hancocks Bridge, New Jersey 08038-0236 NOV 1 5 2005 LR-N05-0557 00PSEG

.Alucleai-LIC United States Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 MONTHLY OPERATING REPORT SALEM GENERATING STATION - UNIT 2 DOCKET NO. 50-311 In compliance with Section 6.9, Reporting Requirements for the Salem Unit 2 Technical Specifications, the operating statistics for October 2005 are being forwarded.

Sincerely, Sale GenerPresident Salem Generating Station Attachments 95-2168 REV. 7/99

4-l NOV 1 5 2005 Document Control Desk LR-N05-0557 C:

Mr. S. Collins, Administrator-Region I U. S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406 Mr. S. Bailey, Licensing Project Manager - Salem U. S. Nuclear Regulatory Commission Mail Stop 08B1 Washington, DC 20555 USNRC Senior Resident Inspector - Salem (X24)

Mr. K. Tosch, Manager IV Bureau of Nuclear Engineering PO Box 415 Trenton, New Jersey 08625

DOCKET NO.:

UNIT:

DATE:

COMPLETED BY:

TELEPHONE:

50-311 Salem 2 11/05/05 J.Hiles (856) 339-3068 Reporting Period: October OPERATING DATA REPORT Design Electrical Rating (MWe-Net)

Maximum Dependable Capacity (MWe-Net)

No. of hours reactor was critical No. of hours generator was on line (service hours)

Unit reserve shutdown hours Net Electrical Energy (MWH)

Unplanned Transients >20%

-Month Year-to-date Cumulative 1131 1116 745 6472 142407 744 6433 138690 O

o0 847189 7218885 143303235 0

0 UNIT SHUTDOWNS METHOD OF TYPE SHUTTING F=FORCED DURATION REASON DOWN CORRECTIVE THE NO.

DATE S=SCHEDULED (HOURS)

(1)

REACTOR ACTION/COMMENT

___________(2)

(1) Reason (2) Method A - Equipment Failure (Explain)

B - Maintenance or Test C-Refueling D - Regulatory Restriction E - Operator Training/License Examination F - Administrative G - Operational Error (Explain)

H - Other 1 - Manual 2 - Manual Trip 3 - Automatic Trip/Scram 4 - Continuation 5 - Other (Explain)

DOCKET NO.: 50-311 UNIT: Salem 2 DATE: 11/05/05 COMPLETED BY: J.Wearne TELEPHONE: (856) 339-5081 Summary of Monthly Operating Experience

  • Salem 2 began the month at approximately 100% power and operated throughout the month without experiencing a power change that exceeded 20%

of reactor power.

  • At the end of the month Salem Unit 2 completed 173 days of continuous on-line operation.