LR-N04-0447, September 2004 Monthly Operating Report for Salem Unit 1

From kanterella
Jump to navigation Jump to search
September 2004 Monthly Operating Report for Salem Unit 1
ML043010072
Person / Time
Site: Salem PSEG icon.png
Issue date: 10/15/2004
From: Fricker C
Public Service Enterprise Group
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
LR-N04-0447
Download: ML043010072 (3)


Text

v PSEG Nuclear LLC P.O. Box 236, Hancocks Bridge, New Jersey 08038-0236 OCT 1 5 2004 LR-N04-0447 o PSEG Nuclear LLC U. S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 MONTHLY OPERATING REPORT SALEM GENERATING STATION UNIT I DOCKET NO. 50-272 In compliance with Section 6.9, Reporting Requirements for the Salem Unit 1 Technical Specifications, the operating statistics for September 2004 are being forwarded.

f=,ea C. 6zrz1CA4SE L. 1,WdC-2-.

Carl J. Fricker Salem Plant Manager Attachments C Distribution

',- , -z' U(

5' 95-2168 REV. 7/99

I DOCKET NO.:

UNIT:

DATE:

COMPLETED BY:

TELEPHONE:

Reporting Period September 2004 OPERATING DATA REPORT 50-272 Salem 1 10/6/04 F. Todd (856) 339-1316 Design Electrical Rating (MWe-Net)

Maximum Dependable Capacity (MWe-Net)

No. of hours reactor was critical No. of hours generator was on line (service hours)

Unit reserve shutdown hours Net Electrical Energy (MWH) 1193 1159 I

Month Year-to-date Cumulative 661 5058 155723 645 4908 150860 0

0 0

726318 5452989 154453637 UNIT SHUTDOWNS NO.

DATE TYPE DURATION REASON METHOD OF CORRECTIVE ACTION/

F=FORCED (HOURS)

(1)

SHUTTING COMMENT S=SCHEDULED DOWN THE REACTOR (2) 4 9/25/04 S

75 Hrs.

B 1

Maintenance on Feedwater Regulating 9/28/04 Valves and Digital Electro Hydraulic Control System

-4 4-

+

4 I

I (1) Reason (2) Method A - Equipment Failure (Explain)

B - Maintenance or Test C - Refueling D - Regulatory Restriction E - Operator Training/License Examination F - Administrative G - Operational Error (Explain)

H - Other 1 - Manual 2 - Manual Trip/Scram 3 - Automatic Trip/Scram 4 - Continuation 5 - Other (Explain)

DOCKET NO.: 50-272 UNIT: Salem 1 DATE: 10/6/04 COMPLETED BY: R. Ritzman TELEPHONE: (856) 339-1445 Summary Of Monthly Operating Experience

  • Salem 1 began the month at approximately 100% power.
  • On September 16, power was reduced to approximately 47% due to a 500kv line outage. Powerwas returned to 100% on September 17.
  • On September 25, the unit was manually shutdown for maintenance on the feedwater regulating valves and the digital electro hydraulic control system. The unit was placed back on-line on September 28, and was returned to approximately 100% power later that day.
  • At the end of the month, Salem 1 completed 2 days of continuous on-line operation.