July 2004 Monthly Operating Report for Salem Generating Station Unit 1
ML042380399
Person / Time
Site: Salem PSEG icon.png
Issue date: 08/12/2004
From: Fricker C
Public Service Enterprise Group
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
LR-N04-0356
Download: ML042380399 (3)


Text

PSEG Nuclear LLC P.O. Box 236, Hancocks Bridge, New Jersey 08038-0236 AUG 1 2 2004 O Nuclear PSEG LLC LR-N04-0356 U. S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 MONTHLY OPERATING REPORT SALEM GENERATING STATION UNIT I DOCKET NO.60-272 In compliance with Section 6.9, Reporting Requirements for the Salem Unit 1 Technical Specifications, the operating statistics for July 2004 are being forwarded.

Sincerely, Aor Carl J. Fricker Salem Plant Manager Attachments C Distribution I I I 5A 95-2168 REV. 7/99

DOCKET NO.: 50-272 UNIT: Salem 1 DATE: 8/6/04 COMPLETED BY: F. Todd TELEPHONE: (856) 339-1316 Reporting Period July 2004 OPERATING DATA REPORT Design Electrical Rating (MWe-Net) 1193 Maximum Dependable Capacity (MWe-Net) 1159 Month Year-to-date Cumulative No. of hours reactor was critical 744 3653 154319 No. of hours generator was on line (service 744 3519 149471 hours)

Unit reserve shutdown hours 0 0 0 Net Electrical Energy (MWH) 868941 3855598 152856246 UNIT SHUTDOWNS NO. DATE TYPE DURATION REASON METHOD OF CORRECTIVE ACTIONI F=FORCED (HOURS) (1) SHUTTING COMMENT S=SCHEDULED DOWN THE REACTOR (2)

(1)Reason (2) Method A - Equipment Failure (Explain) I - Manual B - Maintenance or Test 2 - Manual Trip/Scram

' C - Refueling 3 - Automatic Trip/Scram D - Regulatory Restriction 4 - Continuation E - Operator Training/License Examination 5 - Other (Explain)

F - Administrative G - Operational Error (Explain)

H - Other

S b DOCKET NO.: 50-272 UNIT: Salem 1

."DATE: 7/8/04 COMPLETED BY: R. Ritzman TELEPHONE: (856) 339-1445 Summary Of Monthly Operating Experience

  • Salem 1 began the month at approximately 85% power reaching 100%

power later on July 1. The unit remained at 100% power for the month.

At the end of the month, Salem 1 completed 37 days of continuous on-line operation.