November 2004 Monthly Operating Report for Salem Generating Station Unit 1
ML043570443
Person / Time
Site: Salem PSEG icon.png
Issue date: 12/15/2004
From: Fricker C
Public Service Enterprise Group
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
LR-N04-0572
Download: ML043570443 (3)


Text

s- 4 PSEG Nuclear LLC P.O. Box 236, Hancocks Bridge, New Jersey 08038-0236

  • DEC 1 5 2004 o NuclearLLC PSEG LR-N04-0572 U. S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 MONTHLY OPERATING REPORT SALEM GENERATING STATION UNIT I DOCKET NO. 50-272 In compliance with Section 6.9, Reporting Requirements for the Salem Unit I Technical Specifications, the operating statistics for November 2004 are being forwarded.

Sincerely, Ca J. Fricker Salem Plant Manager Attachments C Distribution

,,,< I,-; q 95-2168 REV. 7/99

.; -. .i .

DOCKET NO.: 50-272 UNIT: Salem 1 DATE: 12/8/04 COMPLETED BY: F. Todd TELEPHONE: (856) 339-1316 Reporting Period November 2004 OPERATING DATA REPORT Design Electrical Rating (MWe-Net) 1193 Maximum Dependable Capacity (MWe-Net) 1159 r I Month Year-to-date Cumulative No. of hours reactor was critical 720 6523 157188 No. of hours generator was on line (service 720 6373 152325 hours)

Unit reserve shutdown hours 0 0 0 Net Electrical Energy (MWH) 848451 7177450 156178098 UNIT SHUTDOWNS NO. DATE TYPE DURATION REASON METHOD OF CORRECTIVE ACTION/

F=FORCED (HOURS) (1) SHUTTING COMMENT S=SCHEDULED DOWN THE REACTOR (2) 1 . I . I.

__ I_

(1) Reason (2) Method A - Equipment Failure (Explain) 1 - Manual B - Maintenance or Test 2 - Manual Trip/Scram C - Refueling 3 - Automatic Trip/Scram D - Regulatory Restriction 4 - Continuation E - Operator Training/License Examination 5 - Other (Explain)

F - Administrative G - Operational Error (Explain)

H - Other

DOCKET NO.: 50-272 UNIT: Salem 1 DATE: 12/8/04 COMPLETED BY: R. Ritzman TELEPHONE: (856) 339-1445 SummarV Of Monthly Operating Experience

  • Salem 1 began the month at approximately 100% power.
  • On November 7, power was reduced to approximately 77% due to solar magnetic disturbances. Power was restored to 100% on November 8.
  • Salem 1 operated throughout the remainder of the month without experiencing another power change that exceeded 20% of reactor power.
  • At the end of the month, Salem I completed 63 days of continuous on-line operation.