LR-N04-0060, January 2004 Monthly Operating Report for Salem, Unit 1

From kanterella
Jump to navigation Jump to search
January 2004 Monthly Operating Report for Salem, Unit 1
ML040550430
Person / Time
Site: Salem PSEG icon.png
Issue date: 02/17/2004
From: Fricker C
Public Service Enterprise Group
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
LR-N04-0060
Download: ML040550430 (3)


Text

PSEG Nuclear LLC P.O. Box 236, Hancocks Bridge, New Jersey 08038-0236

- f -

FEB 1 7 2004 0mPSEG NuclearLLC LR-N04-0060 U. S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 MONTHLYPOPERATING REPORT SALEM GENERATING STATION UNIT I DOCKET NO. 50-272 In compliance with Section 6.9, Reporting Requirements for the Salem Unit I Technical Specifications, the operating statistics for Januari 2004 ar~e being forwarded.

Sincfely,

-i'l/ Fa. r

$ Ass

,,;/.,1.t,,,,,

,!is Saem~lla~nt,121~agr.; r e t; li` ;

Attachments.

. W .

r . -

C Distribution . L ,i.

.. . .\;k

- i, . 1, , -, "

I . .. .

I, i .,. .

I

, ,; " I.~ .~J .-

-,' . I

,'-'\j,, -2, 95-2168 REV. 7/99

S..

DOCKET NO.: 50-272 UNIT: Salem I DATE: 2/10/04 COMPLETED BY: F. Todd TELEPHONE: (856) 339-1316 Reporting Period January 2004 OPERATING DATA REPORT Design Electrical Rating (MWe-Net) 1130 Maximum Dependable Capacity (MWe-Net) 1096 Month No. of hours reactor was critical 744 744 151410 No. of hours generator was on line (service 744 744 146697 hours)

Unit reserve shutdown hours 0 0 0 Net Electrical Energy (MWH) 804691 804691 149805339 UNIT SHUTDOWNS NO. DATE TYPE DURATION REASON METHOD OF CORRECTIVE ACTION/

F=FORCED (HOURS) (1) SHUlTING COMMENT S=SCHEDULED DOWN THE REACTOR (2)

(1) Reason (2) Method A Equipment Failure (Explain)

- 1-Manual B Maintenance or Test

- 2- Manual Trip/Scram C Refueling

- 3- Automatic Trip/Scram D Regulatory Restriction

- 4 Continuation E Operator Training/License Examination

- 5 Other (Explain)

F Administrative G Operational Error (Explain)

H-Other

DOCKET NO.: 50-272 UNIT: Salem I DATE: 2110/04 COMPLETED BY: R. Ritzman TELEPHONE: (856) 339-1445 Summary Of Monthly Operating Experience

  • Salem I entered the month at approximately 82% power due to circulators being out of service for maintenance and waterbox cleaning.
  • Salem I conducted several down powers to support circulator maintenance and condenser waterbox cleaning during the month. The unit remained above 80% reactor power throughout the month.
  • At the end of the month, Salem I completed 104 days of continuous on-line operation.