LR-N04-0111, February 2004 Monthly Operating Report for Salem, Unit 2

From kanterella
Jump to navigation Jump to search
February 2004 Monthly Operating Report for Salem, Unit 2
ML040830643
Person / Time
Site: Salem PSEG icon.png
Issue date: 03/11/2004
From: Fricker C
Public Service Enterprise Group
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
LR-N04-0111
Download: ML040830643 (3)


Text

PSEG Nuclear LLC P.O. Box 236, Hancocks Bridge, New Jersey 08038-0236 11 MAR 1 1 2004 LR-N04-01 11 o3 PSEG Nuclear LLC U. S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 MONTHLY OPERATING REPORT SALEM GENERATING STATION UNIT 2 DOCKET NO. 50-311 In compliance with Section 6.9, Reporting Requirements for the Salem Unit 2 Technical Specifications, the operating statistics for February 2004 are being forwarded.

Sincerely, Ca.

Fricker Salem Plant Manager Attachments C Distribution

<2A 95-2168 REV. 7/99

DOCKET NO.:

UNIT:

DATE:

COMPLETED BY:

TELEPHONE:

50-311 Salem 2 3/5/04 F. Todd (856) 339-1316 Reporting Period February 2004 OPERATING DATA REPORT Design Electrical Rating (MWe-Net)

Maximum Dependable Capacity (MWe-Net)

No. of hours reactor was critical No. of hours generator was on line (service hours)

Unit reserve shutdown hours Net Electrical Energy (MWH) 1131 1116 Month 696 1440 129274 696 1440 125753 O

o t

799671 1641978 128926565 UNIT SHUTDOWNS NO.

DATE TYPE DURATION REASON METHOD OF CORRECTIVE ACTION/

F=FORCED (HOURS)

(1)

SHUTTING COMMENT S=SCHEDULED DOWN THE REACTOR (2)

(1) Reason (2) Method A - Equipment Failure (Explain)

B - Maintenance or Test C - Refueling D - Regulatory Restriction E - Operator Training/License Examination F - Administrative G - Operational Error (Explain)

H - Other 1 - Manual 2 - Manual Trip/Scram 3 -Automatic Trip/Scram 4 - Continuation 5 - Other (Explain)

DOCKET NO.:

UNIT:

DATE:

COMPLETED BY:

TELEPHONE:

50-311 Salem 2 3/5/04 R. Ritzman (856) 339-1445 Summary Of Monthly Operating Experience

  • Salem 2 entered the month at approximately 99.5% power and remained there throughout the month.
  • At the end of the month, Salem 2 completed 94 days of continuous on-line operation.