LR-N05-0556, October 2005 Monthly Operating Report for Salem, Unit 1
| ML053260446 | |
| Person / Time | |
|---|---|
| Site: | Salem |
| Issue date: | 11/15/2005 |
| From: | Joyce T Public Service Enterprise Group |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| LR-N05-0556 | |
| Download: ML053260446 (4) | |
Text
SI PSEG Nuclear LLC P.O. Box 236, Hancocks Bridge, New Jersey 08038-0236 NOV 1 5 2005 LR-N05-0556 0 PSEG A~ruclearlC United States Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 MONTHLY OPERATING REPORT SALEM GENERATING STATION - UNIT 1 DOCKET NOS. 50-272 In compliance with Section 6.9, Reporting Requirements for the Salem Unit 1 Technical Specifications, the operating statistics for October 2005 are being' forwarded.
Sincerely, Th2ma
.oyce Site Vice President Salem Generating Station Attachments
--- 5E2.44.
95-2168 REV. 7/99 Document Control Desk LR-N05-0556 C:
Mr. S. Collins, Administrator - Region I U. S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406 Mr. S. Bailey, Licensing Project Manager - Salem U. S. Nuclear Regulatory Commission Mail Stop 08B1 Washington, DC 20555 USNRC Senior Resident Inspector - Salem (X24)
Mr. K. Tosch, Manager IV Bureau of Nuclear Engineering PO Box 415 Trenton, New Jersey 08625 NOV 1 5 2005
DOCKET NO.:
UNIT:
DATE:
COMPLETED BY:
TELEPHONE:
50-272 Salem 1 11/05/05 J.Hiles (856) 339-3068 Reporting Period: October OPERATING DATA REPORT Design Electrical Rating (MWe-Net)
Maximum Dependable Capacity (MWe-Net)
No. of hours reactor was critical No. of hours generator was on line (service hours)
Unit reserve shutdown hours Net Electrical Energy (MWH)
Unplanned Transients >20%
Month Year-to-date Cumulative 1193 1159 260 6772 164414 260 6762 159480 o
O 0
299415 7882737 164336093 0
1 UNIT SHUTDOWNS METHOD OF TYPE SHUTTING F=FORCED DURATION REASON DOWN CORRECTIVE THE NO.
DATE S=SCHEDULED (HOURS)
(1)
REACTOR ACTION/COMMENT 2
10/11/05 S
485 C
I Refueling Outage 17 (1R17) 10/31105 (1) Reason (2) Method A - Equipment Failure (Explain)
B - Maintenance or Test C - Refueling D - Regulatory Restriction E - Operator Training/License Examination F - Administrative G - Operational Error (Explain)
H - Other 1 - Manual 2 - Manual Trip 3 - Automatic Trip/Scram 4 - Continuation 5 - Other (Explain)
DOCKET NO.:
UNIT:
DATE:
COMPLETED BY:
TELEPHONE:
50-272 Salem 1 11/05/05 J.Weame (856) 339-5081 Summary of Monthly Operating Experience
- Salem 1 began the month at 100% power and commenced 1 RI7 on 10/10/05 at 2000 hours0.0231 days <br />0.556 hours <br />0.00331 weeks <br />7.61e-4 months <br />, at the end of the month the unit was still in a refueling outage.