PSEG Nuclear LLC P.O. Box 236, Hancocks Bridge, New Jersey 08038-0236 LR-N05-0585 o PSEG NuclearLLC DEC 1 4 2005 United States Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 MONTHLY OPERATING REPORT SALEM GENERATING STATION - UNIT I DOCKET NO. 50-272 In compliance with Section 6.9, Reporting Requirements for the Salem Unit 1 Technical Specifications, the operating statistics for November 2005 are being forwarded.

Sincerely, Thomas P. Jo e Site Vice President Salem Generating Station Attachments C Distribution iJi&2l3 95-2168 REV. 7/99

Document Control Desk LR-N05-0585 C: Mr. S. Collins, Administrator - Region I U. S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406 Mr. S. Bailey, Licensing Project Manager - Salem U. S. Nuclear Regulatory Commission Mail Stop 08B1 Washington, DC 20555 USNRC Senior Resident Inspector - Salem (X24)

Mr. K. Tosch, Manager IV Bureau of Nuclear Engineering PO Box 415 Trenton, New Jersey 08625

DOCKET NO.: 50-272 UNIT: Salem 1 DATE: 12/05/05 COMPLETED BY: J.Hiles TELEPHONE: (856)339-3068 Reporting Period: November OPERATING DATA REPORT Month Year-to-date Cumulative Design Electrical Rating (MWe-Net) 1193 Maximum Dependable Capacity (MWe-Net) 1159 No. of hours reactor was critical 618 7390 165032 No. of hours generator was on line 599 7361 160079 (service hours)

Unit reserve shutdown hours 0 0 0 Net Electrical Energy (MWH) 672741 8555478 165008834 Unplanned Transients >20% o I UNIT SHUTDOWNS METHOD OF TYPE SHUTTING F=FORCED DURATION REASON DOWN THE CORRECTIVE NO. DATE S=SCHEDULED (HOURS) (1) REACTOR ACTION/COMMENT (2) 2 11/01/05 S 121 Hrs. C 4 Refuel Outage 17 11/06/05 (1) Reason (2) Method A - Equipment Failure (Explain) 1 - Manual B - Maintenance or Test 2 - Manual Trip C - Refueling 3 - Automatic Trip/Scram D - Regulatory Restriction 4 - Continuation E - Operator Training/License Examination 5 - Other (Explain)

F - Administrative G - Operational Error (Explain)

H - Other

-a DOCKET NO.: 50-272 UNIT: Salem 1 DATE: 12/05/05 COMPLETED BY: J.Wearne TELEPHONE: (856) 339-5081 Summary of Monthly Onerating Experience

  • Salem 1 began the month in refueling outage 1 R17, which commenced on 10/10/05. After reaching 100% power on 11/8/05 following the refueling outage, Salem 1 had no power changes greater than 20% for the remainder of the month.