January 2005 Monthly Operating Report for Salem Generating Station Unit 2
ML050550074
Person / Time
Site: Salem PSEG icon.png
Issue date: 02/14/2005
From: Fricker C
Public Service Enterprise Group
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
LR-N04-0092
Download: ML050550074 (3)


Text

PSEG Nuclear LLC P.O. Box 236, Hancocks Bridge, New Jersey 08038-0236 FEB 14 2005 O PSEG NuclearLLC LR-N04-0092 U. S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 MONTHLY OPERATING REPORT SALEM GENERATING STATION UNIT 2 DOCKET NO. 50-311 In compliance with Section 6.9, Reporting Requirements for the Salem Unit 2 Technical Specifications, the operating statistics for January 2005 are being forwarded.

Sincerel 4~cker S~lem Plant Manager Attachments C Distribution ok 95-2168 REV. 7/99

DOCKET NO.: 50-311 UNIT: Salem 2 I..DATE: 2/4/05 COMPLETED BY: F. Todd TELEPHONE: (856) 339-1316 Reporting Period January 2005 OPERATING DATA REPORT Design Electrical Rating (MWe-Net)

Maximum Dependable Capacity (MWe-Net) 1131 1116 I__

Ai_!

!! I I!! _ __

Month Year-to-date Cumulative No. of hours reactor was critical 744 744 136679 No. of hours generator was on line (service 744 744 133002 hours)

Unit reserve shutdown hours - . 0 0 0 Net Electrical Energy (MWH) 855089 855089 136939439 UNIT SHUTDOWNS NO. DATE TYPE DURATION REASON METHODOF CORRECTIVE ACTION/

F=FORCED (HOURS) (1) SHUTTING COMMENT S=SCHEDULED . DOWN THE

._ REACTOR (2)

(1) Reason (2) Method A - Equipment Failure (Explain) 1 - Manual B - Maintenance or Test 2 - Manual Trip/Scram C - Refueling 3 - Automatic Trip/Scram D - Regulatory Restriction 4 - Continuation E - Operator Training/License Examination 5 - Other (Explain)

F - Administrative G - Operational Error (Explain)

H - Other

DOCKET NO.: 50-311 UNIT: Salem 2 DATE: 2/4/05 COMPLETED BY: R. Ritzman TELEPHONE: (856) 339-1445 Summary Of Monthly Operating Experience

  • Salem 2 began the month at approximately 100% power and operated at 100% throughout the month.
  • At the end of the month, Salem 2 completed 48 days of continuous on-line operation.