ML100600329

From kanterella
Jump to navigation Jump to search

"Draft Withdrawal" is not in the list (Request, Draft Request, Supplement, Acceptance Review, Meeting, Withholding Request, Withholding Request Acceptance, RAI, Draft RAI, Draft Response to RAI, ...) of allowed values for the "Project stage" property.

Withdrawal of Draft RAI Conveyed by an E-mail of 11/5/09, Regarding High Energy Line Break
ML100600329
Person / Time
Site: Monticello Xcel Energy icon.png
Issue date: 02/26/2010
From: Tam P
Plant Licensing Branch III
To: Gabor S, Gunderson L, Schaefer K
Northern States Power Co
Tam P
References
TAC MD9990
Download: ML100600329 (2)


Text

Accession No. ML100600329 From:

Tam, Peter Sent:

Friday, February 26, 2010 8:58 AM To:

Gunderson, Lynne; Schaefer, Kurt T.; Salamon, Gabor Cc:

Khanna, Meena; Pascarelli, Robert; Tsirigotis, Alexander

Subject:

Monticello - Withdrawal of draft RAI re. high energy line break (TAC MD9990)

Lynne, Kurt:

In a conference call on 2/25/10, NSPM personnel stated that: NSPM is not seeking NRC approval with the EPU LAR for changes in the HELB analysis methods which resulted from corrective actions at MNGP. NSPM personnel confirmed that changes in HELB analysis methods (which the licensee has included in its response to EMCB RAI 3(a)) discussed in the EPU LAR and any required modifications (if any are found) are, or will be, processed via the 10 CFR 50.59 process. If at that time the 50.59 process is not viable, NSPM will submit an LAR.

NSPM personnel also committed to send NRC a letter to state the same.

On the basis of this commitment, the NRC staff determined that the draft RAI conveyed by an 11/5/09 email (Accession No. ML093100130) is no longer needed. That draft RAI is hereby withdrawn.

Peter S. Tam, Senior Project Manager Plant Licensing Branch III-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Tel. 301-415-1451 E-mail Properties Mail Envelope Properties (3D6B1F4F51D25E4E9B6C93FF92DAE5171443BF65AC)

Subject:

Monticello - Withdrawal of draft RAI re. high energy line break (TAC MD9990)

Sent Date: 2/26/2010 8:58:25 AM Received Date: 2/26/2010 8:58:00 AM From: Tam, Peter Created By: Peter.Tam@nrc.gov Recipients:

Lynne.Gunderson@xenuclear.com (Gunderson, Lynne)

Tracking Status: None Kurt.Schaefer@xenuclear.com (Schaefer, Kurt T.)

Tracking Status: None Gabor.Salamon@xenuclear.com (Salamon, Gabor)

Tracking Status: None Meena.Khanna@nrc.gov (Khanna, Meena)

Tracking Status: None Robert.Pascarelli@nrc.gov (Pascarelli, Robert)

Tracking Status: None Alexander.Tsirigotis@nrc.gov (Tsirigotis, Alexander)

Tracking Status: None Post Office:

HQCLSTR02.nrc.gov Files Size Date & Time MESSAGE 10050 2/26/2010 Options Expiration Date:

Priority: olImportanceNormal ReplyRequested: False Return Notification: False Sensitivity: olNormal Recipients received: