L-88-261, Forwards Rev 13 to Physical Security Plan,Per NUREG-0908 Upgrade.Upgraded Plan Will Be Implemented Effective 880831. Explanation of Changes Also Encl.Encls Withheld (Ref 10CFR2.790 & 73.21)

From kanterella
(Redirected from L-88-261)
Jump to navigation Jump to search
Forwards Rev 13 to Physical Security Plan,Per NUREG-0908 Upgrade.Upgraded Plan Will Be Implemented Effective 880831. Explanation of Changes Also Encl.Encls Withheld (Ref 10CFR2.790 & 73.21)
ML20155G213
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 06/14/1988
From: Conway W
FLORIDA POWER & LIGHT CO.
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
RTR-NUREG-0908, RTR-NUREG-908 L-88-261, NUDOCS 8806170203
Download: ML20155G213 (2)


Text

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ .

D. O. BOX 14000, JUNO BE ACH, F L 33403 0430 SAFEGUARDS INFORMATION n

i 4 h

JUNE 14 1988 L-88-261 10 CFR 50.54 U. S. Nuclear Regulatory Commission Attn Document Control Desk Washington, D. C. 20555 Gentlemen:

Re: Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-251 Physical Security Plan NUREG 0908 Upgrade BLbJ tittal Under 10 CFR 50.54 (D)

Florida Power and Light Company has recently completed a rewrite of the current plan to conform with the guidance provided in NUREG 0908, Acceptance Criteria For The Evaluation of Nuclear Power Reactor Security Plaas. This upgraded plan is current to revision 13 of the Turkey Point Physical Security Plan (PSP) and has been determined by FPL to not decrease the safeguard effectiveness of the plan.

Due to the significant format change and the number of changes in procedures and related documents that are required by the new format, this upgraded plan will be implemented effective August 31, 1988. Any changes that occur to the controlling PSP before the effective date of the upgraded plan will be incorporated in the upgraded plan prior to its implementation. An explanation of these changes and revised pages will be submitted under the next sequential revision number pursuant to the requirement of 10 CFR 50.54 (p). This method of submittal and the status and content of the upgraded plan have been discussed with the Region II staff at a March 15, 1988 meeting in Atlanta and a subsequent telephone conversation on May 18, 1988.

Pursuant to 10 CFR 50.54 (p), an explanation of the changes and three copies of the upgraded plan are enclosed, nd .

ENCLOSURE CONTAINS SAFEGUARDS INFORMATION. UPON SEPARATION, [ egd d g THIS PAGE IS DECONTROLLED. i g yt SAFEGUARDS INFORMATION 8806170203 880614 an FPL Group compan,

{DR ADOCK OM00250 DCD

SAFECUARDS INFORMATION s

U. S. Nuclear Regulatory Commission L-88-261 Page two The documents provided with this submittal are as follows:

Enclosure A: Matrix / List Of Changes Enclosure B: Original Plan With Margin Mark-Ups Enclosure C: 10 CFR 73.55 Matrix Er. closure D: Upgraded Plan With Paragraph Source Identification Margin Mark-Up Enclosure E: Clean Copy Of Upgraded Plan By copy of this letter, we are forwarding one copy of Enclosures A through D and two copies of enclosure E to the lluclear Regulatory Commission, Region II.

In accordance with 10 CFR 2.790 and 10 CFR 73.21, the enclosures to this letter are exempt from public disclosure.

If we can be of any assistance in the review of this upgraded plan or if any questions arise during the review, please contact us.

Very truly yours, M1 W. F. Coky Senior Vice President - liuclear WFC/SDF/gp Enclosures cc: Dr. J. Nelson Grace, Regional Administrator, Region II, USNRC (2 copies of Enclosures A through D)

Senior Resident Inspector, USNRC, Turkey Point Plant (with Enclosures A through D only) l l

' ENCLOSURE CONTAINS SAFEGU ARDS INFORMATION. UPON SEPARATION, THIS PAGE IS DECONTROLLED.

l 1

SAFEGUARDS INFORMATl0A