IR 05000529/1986017
| ML17300A290 | |
| Person / Time | |
|---|---|
| Site: | Palo Verde |
| Issue date: | 07/29/1986 |
| From: | Chaffee A NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V) |
| To: | Van Brunt E ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR |
| Shared Package | |
| ML17300A291 | List: |
| References | |
| NUDOCS 8608040229 | |
| Download: ML17300A290 (2) | |
Text
J Ul 291986 R6ppp+pRR9 86lp729 RDR
- DOCR pppppDR9
pgR Docket No. 50-529 Arizona Nuclear Power Project P. 0. Box 52034 Phoenix, Arizona 85072-2034 Attention:
E. E. Van Brunt, Jr.
Executive Vice President Gentlemen:
Thank you for your letter dated July 7, 1986, informing us of the steps you have taken to correct the items which we brought, to your attention in our letter dated June 13, 1986.
Your corrective actions will be verified during a future inspection.
Your cooperation with us is appreciated.
Sincerely, A. E.
haffee, Chief Reactor Projects Branch bcc w/cy ltr dtd 7/7/86:
RSB/Document Control Desk (RIDS)
Project Inspector Resident Inspector G.
Cook B. Faulkenberry J. Martin Region V-Q7-RPZimmerman/norma 7/8//86 IMiller AEChaffee 7/P/86 7/P7/86
.'< SQ (7""
I