MONTHYEARML20202J5471999-02-0101 February 1999 Notice of Violation from Insp on 981122-990102.Violation Noted:Following Unit 1 RT on 981109,procedural Requirements of EOP ES0.1 Were Not Properly Implemented,In That RCS Temperatures Were Not Monitored & Steam Not Dumped ML20196D6081998-11-24024 November 1998 Notice of Violation from Insp on 980914-1016.Violation Noted:As of 980916,requirements of 0-MI-MXX-061-001 Not Implemented ML20195G5521998-11-0909 November 1998 Notice of Violation from Insp on 980830-1010.Violation Noted:Licensee Failed to Assure That All Testing Required to Demonstrate That Safety Related Circuit Breakers Would Perform Satisfactorily in Svc ML20237B1851998-08-0404 August 1998 Notice of Violation from Insp on 980606-0718.Violations Noted:On or Before 971103,conditions Adverse to Qualify Were Not Promptly Identified & Corrected,In That Licensee Failed to Correct &/Or Initiate Problem Evaluation Rept ML20236J6591998-06-26026 June 1998 Notice of Violation from Insp on 980426-0606.Violation Noted:Inservice Testing of Valves Not in Accordance with Section XI of ASME Boiler & Pressure Vessel Code & Applicable Addenda as Required by 10CFR50.55a ML20247L5781998-05-15015 May 1998 Notice of Violation from Insp on 980315-0425.Violation Noted:Licensee Failed to Perform Surveillance Requirement 4.8.1.1.1.a,within 1 H & at Least Once Per 8 H Thereafter ML20216H7701998-04-10010 April 1998 Notice of Violation from Insp on 980201-0314.Violation Noted:License Failed to Rept an Adverse Condition on Work Request/Work Order &/Or Problem Evaluation Rept ML20217K3751998-03-30030 March 1998 Notice of Violation from Insp on 980126-0213.Violation Noted:On Listed Dates,Licensee Made Changes to Facility as Described in FSAR W/O Adequate Written SE Which Provides Bases for Determination That Changes Did Not Involve USQ ML20203J5411998-02-19019 February 1998 Notice of Violation from Insp on 971231-980131.Violation Noted:On 980126 Individuals Failed to Monitor Themselves in Whole Body Contamination Monitor or W/Hand & Foot Frisk Monitor ML20197F5541997-12-0808 December 1997 Notice of Violation from Insp on 970725-0704 & Proposed Imposition of Civil Penalty in Amount of $55,000.Violation Noted:Sro Failed to Implement Step 8.4.8 of Soi 0-S0-250-1. Predecisional EC Agenda & Documentation Encl ML20211E2531997-09-22022 September 1997 Notice of Violation from Insp on 970706-0823.Violation Noted:On 970714,containment Isolation Valve 1-FCV-31C-229 Failed to Exhibit Required Change of Obturator Position & Was Not Repaired or Replaced & Data Not Analyzed ML20141H9531997-07-28028 July 1997 Notice of Violation from Insp on 970525-0705.Violation Noted:Licensee Failed to Implement Prompt Corrective Actions to Resolve Condition Adverse to Quality ML20149L5671997-07-24024 July 1997 Notice of Violation from Insp on 970623-27.Violation Noted: on 960627,licensee Had Loss of Security Electronic Equipment & Failed to Post Officers in Position to Provide Surveillance of Entire Protected Area Perimeter ML20149G8681997-07-10010 July 1997 Notice of Violation from Insp on 970324-0522.Violation Noted:Licensee Failed to Esatblish Measures to Assure That Significant Condition Adverse to Quality Was Promptly Identified & Corrected & C/A Taken to Preclude Repetition ML20141G0361997-06-20020 June 1997 Notice of Violation from Insp on 970413-0524.Violation Noted:Each Intermediate & Power Range Channel Was Not Subj to Channel Function Test within 12 H Prior to Initiating Physics Test ML20141C9811997-05-12012 May 1997 Notice of Violation from Insp on 970302-0412.Violation Noted:On 970324,licensee Failed to Open C-S Sfpcs Pump Discharge Valve When Placing C-S Pump in Service.Sys Operated for About 2.5 Hours with Discharge Valve Closed ML20137F6771997-03-18018 March 1997 Notice of Violation from Insp on 970119-0301.Violations Noted:Alarm Response Procedure for 2A-A Emergency Diesel Generator Inadequate in Items Listed ML20137S9921997-03-14014 March 1997 Notice of Violation from Insp on 970124.Violation Noted:Licensee Failed to Maintain Complete & Accurate Info Re Fire Watch Log Not Being Completed for Control Bldg ML20134G8921997-01-13013 January 1997 Notice of Violation & Proposed Imposition of Civil Penalty in Amount of $100,000.Noncompliance Noted:Tva,Through Actions of Former Vice President of Nuclear Operations, Discriminated Against Mgt Employee ML20134G1721997-01-13013 January 1997 Notice of Violation from Insp on 960923-1219.Violation Noted:Plant Mod M11730A,rev 0,was Approved on 951130 for Modifying Unit 1 Rod Control Sys W/O Incorporating Applicable Design Inputs Re New Failure Modes ML20133F6121996-12-24024 December 1996 Notice of Violation & Proposed Imposition of Civil Penalty in Amount of $100,000.00.Noncompliance Noted:Failure to Implement Adequate Corrective Actions,Failure to Implement MI-10.9.1 Properly & Failure to Notify Sos of Condition ML20134Q3271996-11-19019 November 1996 Notice of Violation from Insp on 960915-1026.Violation Noted:On 960916,section XI IST Procedures for EDG Starting Air Receiver Pressure Relieving Devices Were Inadequate in That Sps Were Set in Range of 340-360 Psig ML20134Q2001996-11-19019 November 1996 Notice of Violation & Proposed Imposition of Civil Penalty in Amount of $50,000 for Violations Noted During Insp on 960708-0822.Violations Noted:Adverse Conditions Re Fire Protection Program Not Promptly Identified &/Or Resolved ML20129A2101996-10-10010 October 1996 Notice of Violation from Insp on 960728-0914.Violation Noted:Prompt Corrective Action Not Implemented for Condition Adverse to Quality ML20029E0561994-05-0202 May 1994 Notice of Violation from Insp on 940306-0402.Violation Noted:Site Std Practice SSP 12.3 Not Followed on or Before 940402 ML20059B4491993-12-23023 December 1993 Notice of Violation from Insp on 931107-1204.Violations Noted:Licensee Failed to Identify Existence of Water Accumulation,Some Containment Liner Degradation & Design Inconsistencies ML20059C0131993-12-17017 December 1993 Notice of Violation from Insp on 931115-19.Violation Noted: Procedures Delineating Process for Administering Comprehensive Requalification Exams Did Not Contain Appropriate Guidance for Conducting Annual Operating Tests ML20058P6571993-12-0303 December 1993 Notice of Violation from Insp on 931011-1106.Violation Noted:Procedures Were Not Implemented in That on 931028, Asos Failed to Complete Time/Date Release Portion of Clearance 2-93-1334 Prior to Sys Being Returned to Svc ML20059K9471993-11-10010 November 1993 Notice of Violation from Insp on 931006-08.Violation Noted: Licensee Alcohol Testing Procedures Did Not Address Those QCs Used to Ensure Test Results Were Valid ML20059L0851993-11-0909 November 1993 Notice of Violation from Insp on 930904-1010.Violation Noted:Nrc Requirements Were Not Met for Listed Examples ML20058B7491993-10-15015 October 1993 Notice of Violation from Insp on 920802-29 & 1101-28. Violation Noted:Licensee Determined That Records Required by Statute or Commission Regulations,Orders or License Conditions Not Complete & Accurate ML20057E7731993-10-0101 October 1993 Notice of Violation from Insp on 930913-17.Violation Noted: Licensee Failed to Adequately Control Radioactive Material in That 930913,unattended Tranfer Bag Containing Unlabeled Radioactively Contaminated Material Found Outside Area ML20057A4141993-09-0303 September 1993 Notice of Violation from Insp on 930711-0807.Violation Noted:Licensee Implemented Design Change Outside Established Design Control Measures & Sys & Components Found Incorrectly Translated Into Listed Category 1 Drawing ML20057A4521993-08-20020 August 1993 Notice of Violation from Insp on 930628-0702 & 12-23. Violations Noted:Procedures Covering Test Activities of safety-related Equipment Not Implemented ML20056E2951993-08-12012 August 1993 Notice of Violation from Insp on 930712-16.Violation Noted: Licensee Granted 80 Individuals Unescorted Access W/O FBI Fingerprint Check Being Conducted & Failed to re-fingerprint 12 Individuals Deemed non-classifiable by FBI ML20056D1361993-07-23023 July 1993 Notice of Violation from Insp on 930621-25.Violations Noted:On 930428,worker Received Portal Contamination Monitor Alarm & Failed to Rept Event to Radcon Field Operations Shift Supervisor ML20056D1391993-07-21021 July 1993 Notice of Violation from Insp on 930606-0710.Violations Noted:Fuel Handling Supervisor Did Not Perform Evolutions of FHI-3A,recovery of Leaning Fuel Assembly H64 ML20045H9691993-07-0707 July 1993 Notice of Violation from Insp on 930614-18.Violation Noted:Replacement of Steam Generator Feedwater Cracked Piping Components Suitability Evaluation Was Inadequate in That It Did Not Provide Evaluation of Suitability ML20045C1321993-06-15015 June 1993 Notice of Violation from Insp on Stated Dates.Violation: Step Deviation Document (EPM-3) Was Not Accurate & Complete in That Section 3.2.3 Did Not Agree W/Step 10.b ML20036B7381993-05-20020 May 1993 Notice of Violation from Insp on 930419-23.Violation Noted: Listed Drawings Needed for Support of Plant Operations Were Erroneously Classified as Category 3 & Had Not Been Updated within 180 Days from Issuance ML20044E4551993-05-18018 May 1993 Notice of Violation from Insp on Stated Dates.Violations: Liquid Penetrant Testing Not Accomplished in Accordance W/ Code & Procedure Requirements ML20035G9321993-04-23023 April 1993 Notice of Violation from Insp on 930322-25.Violation Noted: Procedures & Mgt Directives Were Not Available to Direct Evaluators to Correct Conclusions for Event of 920516 ML20035D3781993-03-23023 March 1993 Notice of Violation & Proposed Imposition of Civil Penalties in Sum of $225,000.Violations Noted:Listed Procedures Inadequate Resulting in Mispositioning of Specified Valves for Time Periods Indicated ML20034F0601993-02-23023 February 1993 Notice of Violation from Insp on Stated Dates.Violations: Listed Specific Procedures Requirements Were Not Properly Implemented ML20034E8651993-02-18018 February 1993 Notice of Violation & Proposed Imposition of Civil Penalty in Amount of $50,000.Noncompliance Noted:On 920918,safe Containing Safeguards Info Removed from Site & Transferred to Persons Who Did Not Have Established Need to Know ML20128A4301993-01-15015 January 1993 Notice of Violation from Insp on 921129-930102.Violations Noted:Procedure S0I-82.2 Not Followed & Periodic Instruction 0-PI-OPS-000-006.0 Inadequate ML20024F8611990-12-14014 December 1990 Notice of Violation from Insp on 901106-1205.Violations Noted:Operators Performed Several Manipulations Such as Rod Movements,Rod Drops & Initial Criticality Operations While IRMs Not Considered Operable Due to Previous Miscalibr ML20062H5501990-11-20020 November 1990 Notice of Violation from Insp on 900723-0914.Violation Noted:Licensee Failed to Implement Instructions,Procedures & Performance That Would Prevent Storage &/Or Accumulation of Loose Conductive Matl in safety-related Electrical Boards ML20062F5541990-11-16016 November 1990 Notice of Violation from Insp on 901006-1105.Violation Noted:Large Amount of nonfire-rated Wood Left Unattended in Auxiliary Bldg on Elevation 669 ML20058F1271990-11-0101 November 1990 Notice of Violation from Insp on 900906-1005.Violation Noted:Root Cause of Reactor Trip Not Identified in post-trip Review Rept & Approved by Plant Operations Review Committee Prior to Plant Restart 1999-02-01
[Table view] Category:TEXT-INSPECTION & AUDIT & I&E CIRCULARS
MONTHYEARIR 05000327/19990051999-09-27027 September 1999 Insp Repts 50-327/99-05 & 50-328/99-05 on 990718-0828. Violations Noted.Major Areas Inspected:Mitigating Sys IR 05000327/19990041999-08-13013 August 1999 Insp Repts 50-327/99-04 & 50-328/99-04 on 990601-0717.One Potentially Safety Significant Issue Noted.Major Areas Inspected:Licensee Emergency Preparedness IR 05000327/19990031999-06-30030 June 1999 Insp Repts 50-327/99-03 & 50-328/99-03 on 990328-0531.Non- Cited Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Maint & Engineering IR 05000327/19990021999-04-23023 April 1999 Insp Repts 50-327/99-02 & 50-328/99-02 on 990214-0327.No Violations Noted.Major Areas Inspected:Licensee Operations, Maint & Engineering IR 05000327/19990011999-03-15015 March 1999 Insp Repts 50-327/99-01 & 50-328/99-01 on 990103-0213. Violations Noted & Being Treated as non-cited Violations. Major Areas Inspected:Aspects of Licensee Operations,Maint & Engineering IR 05000327/19983021999-03-12012 March 1999 NRC Operator Licensing Exam Repts 50-327/98-302 & 50-328/98-302 (Including Completed & Graded Tests) for Test Administered on 980928-1001 IR 05000327/19980111999-02-0101 February 1999 Insp Repts 50-327/98-11 & 50-328/98-11 on 981122-990102. Violations Noted.Major Areas Inspected:Licensee Operations, Maint & Engineering ML20202J5471999-02-0101 February 1999 Notice of Violation from Insp on 981122-990102.Violation Noted:Following Unit 1 RT on 981109,procedural Requirements of EOP ES0.1 Were Not Properly Implemented,In That RCS Temperatures Were Not Monitored & Steam Not Dumped IR 05000327/19980101998-12-0707 December 1998 Insp Repts 50-327/98-10 & 50-328/98-10 on 981011-1121.No Violations Noted.Major Areas Inspected:Operations,Maint & Engineering IR 05000327/19980141998-12-0404 December 1998 Insp Repts 50-327/98-14 & 50-328/98-14 on 981102-06.No Violations Noted.Major Areas Inspected:Observation & Evaluation of Biennial Emergency Preparedness Exercise for Sequoyah Nuclear Plan IR 05000327/19980131998-11-24024 November 1998 Insp Repts 50-327/98-13 & 50-328/98-13 on 980914-1016. Violations Noted.Major Areas Inspected:Aspects of Licensee maint,testing,engineering,self-assessment & Problem Evaluations of Licensee Ice Condenser Sys ML20196D6081998-11-24024 November 1998 Notice of Violation from Insp on 980914-1016.Violation Noted:As of 980916,requirements of 0-MI-MXX-061-001 Not Implemented IR 05000327/19980091998-11-0909 November 1998 Insp Repts 50-327/98-09 & 50-328/98-09 on 980830-1010. Violations Noted.Major Areas Inspected:Licensee Operations, Maint,Engineering Plant Support & Effectiveness of Licensee Controls in Identifying,Resolving & Preventing Problems ML20195G5521998-11-0909 November 1998 Notice of Violation from Insp on 980830-1010.Violation Noted:Licensee Failed to Assure That All Testing Required to Demonstrate That Safety Related Circuit Breakers Would Perform Satisfactorily in Svc IR 05000327/19980081998-09-18018 September 1998 Insp Repts 50-327/98-08 & 50-328/98-08 on 980719-0829.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support,Licensee Conducted Radiological Emergency Plan Drill IR 05000327/19980071998-08-0404 August 1998 Insp Repts 50-327/98-07 & 50-328/98-07 on 980607-0718. Violations Noted.Major Areas Inspected:Aspects of Licensee Operation,Maint,Engineering,Plant Support & Effectiveness of Licensee Controls in Identifying & Preventing Problems ML20237B1851998-08-0404 August 1998 Notice of Violation from Insp on 980606-0718.Violations Noted:On or Before 971103,conditions Adverse to Qualify Were Not Promptly Identified & Corrected,In That Licensee Failed to Correct &/Or Initiate Problem Evaluation Rept IR 05000327/19980061998-06-26026 June 1998 Insp Repts 50-327/98-06 & 50-328/98-06 on 980426-0606. Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support ML20236J6591998-06-26026 June 1998 Notice of Violation from Insp on 980426-0606.Violation Noted:Inservice Testing of Valves Not in Accordance with Section XI of ASME Boiler & Pressure Vessel Code & Applicable Addenda as Required by 10CFR50.55a IR 05000327/19983001998-06-25025 June 1998 NRC Operator Licensing Exam Repts 50-327/98-300 & 50-328/98-300 (Including Completed & Graded Tests) for Tests Administered on 980601-02 IR 05000327/19980051998-06-12012 June 1998 Insp Repts 50-327/98-05 & 50-328/98-05 on 980504-08.No Violations Noted.Major Areas Inspected:Maint Procedure.Insp Team Comprised Region II & Headquarters Personnel.Switchgear & Surrounding Areas Found in Good Matl Condition ML20247L5781998-05-15015 May 1998 Notice of Violation from Insp on 980315-0425.Violation Noted:Licensee Failed to Perform Surveillance Requirement 4.8.1.1.1.a,within 1 H & at Least Once Per 8 H Thereafter IR 05000327/19980031998-04-10010 April 1998 Insp Repts 50-327/98-03 & 50-328/98-03 on 980201-0314. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support ML20216H7701998-04-10010 April 1998 Notice of Violation from Insp on 980201-0314.Violation Noted:License Failed to Rept an Adverse Condition on Work Request/Work Order &/Or Problem Evaluation Rept IR 05000327/19980991998-04-0101 April 1998 SALP Repts 50-327/98-99 & 50-328/98-99 for Period 960728- 980221 IR 05000327/19980011998-03-30030 March 1998 Insp Repts 50-327/98-01 & 50-328/98-01 on 980126-0213.No Violations Noted.Major Areas Inspected:Operations,Maint & Engineering ML20217K3751998-03-30030 March 1998 Notice of Violation from Insp on 980126-0213.Violation Noted:On Listed Dates,Licensee Made Changes to Facility as Described in FSAR W/O Adequate Written SE Which Provides Bases for Determination That Changes Did Not Involve USQ IR 05000327/19980021998-03-0505 March 1998 Insp Repts 50-327/98-02 & 50-328/98-02 on 980202-06.No Violations Noted.Major Areas Inspected:Aspects of Licensee Operations & Maint.Review of Initial & Requalification Training Programs Were Also Conducted ML20203J5411998-02-19019 February 1998 Notice of Violation from Insp on 971231-980131.Violation Noted:On 980126 Individuals Failed to Monitor Themselves in Whole Body Contamination Monitor or W/Hand & Foot Frisk Monitor IR 05000327/19970181998-02-19019 February 1998 Insp Repts 50-327/97-18 & 50-328/97-18 on 971221-980131. Violations Noted.Major Areas Inspected:Licensee Operations, Maint,Engineering,Plant Support & Effectiveness of Licensee Controls in Identifying & Resolving Problems ML20216D8431998-02-0606 February 1998 EN-97-109A:on 980206,informs of Withdrawal of Proposed Civil Penalty of $55,000 Issued to Licensee.Credit for Identification Appropriate to Recognize Diligence of TVA Training Instructor Who Discovered Vital Battery Problem IR 05000327/19970171998-01-16016 January 1998 Insp Repts 50-327/97-17 & 50-328/97-17 on 971109-1220.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering,Plant Support & Effectiveness of Licensee Controls in Identifying,Resolving & Preventing Problems ML20197F5541997-12-0808 December 1997 Notice of Violation from Insp on 970725-0704 & Proposed Imposition of Civil Penalty in Amount of $55,000.Violation Noted:Sro Failed to Implement Step 8.4.8 of Soi 0-S0-250-1. Predecisional EC Agenda & Documentation Encl IR 05000327/19970141997-12-0808 December 1997 Insp Repts 50-327/97-14 & 50-328/97-14 on 970928-1108.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering,Plant Support,Effectiveness of License Controls in Identifying,Resolving & Preventing Problems IR 05000327/19970161997-12-0505 December 1997 Insp Repts 50-327/97-16 & 50-328/97-16 on 971103-06.No Violations Noted.Major Areas Inspected:Evaluation of 971017 Wire Damage Event at Electrical Penetration 22 ML20197F6971997-12-0303 December 1997 EN-97-109:on 971208,notice of Proposed Imposition of Civil Penalty in Amount of $55,000 Issued to Licensee.Action Based on Severity Level III Problem Re Failure to Maintain Direct Current Vital Battery Channel Energized & Operable IR 05000327/19973001997-11-0606 November 1997 Exam Repts 50-327/97-300 & 50-328/97-300 on 970919-1007. Exam Results:Four Out of Seven Candidates Passed Exam.One Candidate Was Marginal Performer IR 05000327/19970121997-10-24024 October 1997 Insp Repts 50-327/97-12 & 50-328/97-12 on 970824-0927.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support & Operator Requalification Program IR 05000327/19970151997-10-23023 October 1997 Insp Repts 50-327/97-15 & 50-328/97-15 on 970922-29.No Violations Noted.Major Areas Inspected:Emergency Preparedness PNO-II-97-055, on 971006,contaminated Person Transported from Sequoyah Nuclear Plant to Offsite Medical Facility,Following Apparent Heart Attack.Victim Pronounced Dead at Hosp,Due to Apparent Heart Attack.Licensee Responded to Media Inquirie1997-10-0606 October 1997 PNO-II-97-055:on 971006,contaminated Person Transported from Sequoyah Nuclear Plant to Offsite Medical Facility,Following Apparent Heart Attack.Victim Pronounced Dead at Hosp,Due to Apparent Heart Attack.Licensee Responded to Media Inquirie ML20211E2531997-09-22022 September 1997 Notice of Violation from Insp on 970706-0823.Violation Noted:On 970714,containment Isolation Valve 1-FCV-31C-229 Failed to Exhibit Required Change of Obturator Position & Was Not Repaired or Replaced & Data Not Analyzed ML20198H7911997-09-11011 September 1997 Insp Repts 50-327/97-13 & 50-328/97-13 on 970725-0904. Violations Noted.Major Areas Inspected:Insp Scope,Event Synopsis & Observations & Findings IR 05000327/19970061997-07-28028 July 1997 Insp Repts 50-327/97-06 & 50-328/97-06 on 970525-0705. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support ML20141H9531997-07-28028 July 1997 Notice of Violation from Insp on 970525-0705.Violation Noted:Licensee Failed to Implement Prompt Corrective Actions to Resolve Condition Adverse to Quality ML20149L5671997-07-24024 July 1997 Notice of Violation from Insp on 970623-27.Violation Noted: on 960627,licensee Had Loss of Security Electronic Equipment & Failed to Post Officers in Position to Provide Surveillance of Entire Protected Area Perimeter IR 05000327/19970071997-07-24024 July 1997 Insp Repts 50-327/97-07 & 50-328/97-07 on 970623-27. Violations Noted.Major Areas Inspected:Aspects of Licensee Plant Support ML20149G8681997-07-10010 July 1997 Notice of Violation from Insp on 970324-0522.Violation Noted:Licensee Failed to Esatblish Measures to Assure That Significant Condition Adverse to Quality Was Promptly Identified & Corrected & C/A Taken to Preclude Repetition ML20141G0361997-06-20020 June 1997 Notice of Violation from Insp on 970413-0524.Violation Noted:Each Intermediate & Power Range Channel Was Not Subj to Channel Function Test within 12 H Prior to Initiating Physics Test ML20141G0441997-06-20020 June 1997 Insp Repts 50-327/97-04 & 50-328/97-04 on 970413-0524. Violations Noted.Major Areas Inspected:Operations Re Physics Testing,Maint,Engineering & Plant Support ML20148F9631997-05-27027 May 1997 Special Insp Repts 50-327/97-05 & 50-328/97-05 on 970324-0522.Violations Noted.Major Areas Inspected:Events Associated W/Unit 1 Inadvertent RCS Drain Down on 970324 1999-09-27
[Table view] |
Inspection Report - - 2006005 |
---|
|
|
Text
_ _.
._
_
_
__ _
___
o...
.'o'
ENCLOSURE 1 NOTICE OF VIOLATION Tennessee Valley Authority Docket Nos. 50-327 and 50-328 Sequoyah Units 1 and 2 License Nos. DPR-77 and DPR-79 The following violations were identified during an inspection conducted on May 6 - June 5,1985.
The Severity Levels were assigned in accordance with the NRC Enforcement Policy (10 CFR Part 2, Appendix C).
-1.
Technical Specification 6.8.1 requires that written procedures be established, covering safety related activities referenced in Appendix A of Regulatory Guide 1.33, Revision 2, February 1978.
a.
DPS0-SMI-10G, " Relay Functional Tests for Diesel Generator Protective Relays," and MI-10.1, " Diesel Generator Inspection," were established to implement Technical Specification surveillance requirements.
Contrary to the above, adequate procedures were not established in that DPS0-SMI-1DG did not specify Emergency Diesel Generator (EDG)
local-remote switch position in the EDG cubical nor in the control room prior to the completion of paragraph 9.A(4)4.1 and did not require that controlled test equipment be used in the performance of step 9.A(3),
b.
SQM-24, " Torque and Limit Switch Settings for Motor-0perated Valves,"
was established to comply with the above requirement for maintenance procedures on safety related equipment.
Contrary to the above, SQM-24 did not incorporate the limit switch adjustment technique identified in MI-11.2, " Motor Operated Valve Adjustment Guidelines," which resulted in damage to two safety related
'
valves and a reactor trip.
c.
SI-484, " Periodic Calibration of Reactor Vessel Level Instrumentation System (RVLIS) and RCS Wide Range Pressure Channels (P-403, P-406)
(Refueling Outage)," was established to implement post modification testing requirements.
Contrary to the above, SI-484 was not adequately established for configuration control in that the procedure did not include measures to assure that a sensing line common to RVLIS and Reactor Coolant System pressure transmitter PT-68-66 was isolated so as to preclude actuation of a pressure interlock for the Residual Heat Removal (RHR) isolation valves. This deficiency resulted in the unanticipated isolation of the RHR system due to a high pressure signal sensed by the transmitter during RVLIS fill, vent, and pressurization, g815065585073o
'
g ADOCK 050C03p7, PDR
-
- -
-
-
-
-
-
.
.
-
.
-
l
.
,
...
,
.
.
Tennessee Valley Authority
Docket Nos. 50-327 e.1d 328 Sequoyah Units 1 and 2 License Nos. DPR-77 and 79 The above examples constitute a Severity Level IV Violation.
This violation applies to both units.
(Supplement I).
2.
Technical Specification 6.11 requires that procedures for personnel radia-tion protection shall be prepared consistent with the requirements of 10 CFR 20 and shall be approved, maintained and adhered to for all opera-tions involving personnel radiation exposure.
These requirements are implemented by procedure RCI-1, " Radiological Hygiene Program," which requires each employee to adhere to Health Physics procedures and protective measures.
One protective measure, Radiation Work Permit (RWP) 1-85-105, required a canvas hood be worn in addition to other protective clothing while conducting activities in the Unit 1 containment radiation area.
Contrary to the above, RWP 1-85-105 requirements were not implemented in that an individual was observed conducting activities in the Unit I contain-ment without the prescribed canvas hood.
This is a Severity Level V violation.
This violation applies to Unit 1 only.
(Supplement IV).
3.
Technical Specification 6.8.1 states that written procedures shall be established, implemented and maintained covering the procedures referenced in Appendix A of Regulatory Guide 1.33, Revision 2, February 1978.
Proce-dure MI-10.1 was established to implement requirements for Emergency Diesel Generator surveillance testing.
MI-10.1 paragraph 5.3.1.2.2.5 requires technicians to set up test equipment prior to diesel engine start and paragraph 5.3.1.2.4 requires the technician to verify receipt of the " Engine Running" annunciation at 850 rpm engine speed.
Contrary to the above, as of May 21, 1985, MI-10.1 was not implemented in that technicians did not set up their test equipment prior to engine start and the technician erroneously recorded 850 rpm as the annunciation speed when the annunciation actually energized at about 875 rpm.
.
This is a Severity Level V violation.
This violation applies to both units.
(Supplement I).
4.
Technical Specification 6.8.1 requires that written procedures be implemented covering activities referenced in Appendix A of Regulatory Guide 1.33, Revision 2, February 1978.
Contrary to the above, Workplan No.11188, which was established to install the battery racks and battery cells for vital bottery V, was not implemented in that installation of the intercell spacers for vital battery V was not completed in accordance with the vendor drawings for installation of the battery racks as required by the workplan.
This is a Severity Level V violation.
This violation applies to both units.
(Supplement I).
b
/
.
. :.
Tennessee Valley Authority
Docket Nos. 50-327 and 328 Sequoyah Units 1 and 2 License Nos. OPR-77 and 79 Pursuant to 10 CFR 2.201, you are required to submit to this office within.,
days of the date of this Notice, a written statement or explanation in reply, including:
(1) admission or denial of the alleged violations; (2) the reasons for the violations if admitted; (3) the corrective steps which have been taken and the results achieved; (4) corrective steps which will be taken to avoid further violations; and (5) the date when full compliance will be achieved.
Security or safeguards information should be submitted as an enclosure to facilitate withholding it from public disclosure as required by 10 CFR 2.790(d)
or 10 CFR 73.21.