ML20134B507
| ML20134B507 | |
| Person / Time | |
|---|---|
| Site: | Sequoyah |
| Issue date: | 07/30/1985 |
| From: | Walker R NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Parris H TENNESSEE VALLEY AUTHORITY |
| Shared Package | |
| ML20134B511 | List: |
| References | |
| NUDOCS 8508150651 | |
| Download: ML20134B507 (2) | |
See also: IR 05000327/1985017
Text
- _ . _
8
00b i
.
g
.#2
$ ?i? 5
.
j Tennessee Valley Authority
ATTN: Mr. H. G. Parris
Manager of Power and Engineering
500A Chestnut Street Tower II
Chattanooga, TN 37401
Gentlemen:
SUBJECT:
P,EPORT NOS. 50-327/85-17 AND 50-328/85-17
On May 6 - June 5,1985, NRC inspected activities authorized by NRC Operating
License Nos. OPR-77 and DPR-79 for your Sequoyah facility.
At the conclusion of
the inspection, the findings were discussed with those members of your staff
identified in the enclosed inspection report.
Areas examined during the inspection are identified in the report. Within these
areas, the inspection consisted of selective examinations of procedures and
representative records, interviews with personnel, and observation of activities
in progress.
The inspection findings indicate that certain activities violated NRC require-
ments.
The violations, references to pertinent requirements, and elements to be
included in your response are presented in the enclosed Notice of Violation.
Your attention is invited to unresolved items identified in the inspection
report. These matters will be pursued during future inspections.
The responses directed by this letter and the enclosures are not subject to the
clearance procedures of the Office of Management and Budget issued under the
Paperwork Reduction Act of 1980, PL 96-511.
Should you have any questions concerning this letter, please contact us.
Sincerely,
Roger D. Walker, Director
Division of Reactor Projects
Enclosures:
1.
2.
Inspection Report Nos. 50-327/85-17
and 50-328/85-17
cc w/encls:
(See page 2)
8508150651 850730
ADOCK 05000327
G
'
ZE<D / \\\\
J
l
.
s
, . ,
e,-
.
,
Tennessee Valley Authority
2
JUL 3 01)d5
pc w/encls:
V H. L. Abercrombie, Sequoyah Nuclear Plant
d.SiteDirector;
-
R.' Wallace, Plant Manager
Vd.- W. Anderson,- Manager
,
vk.OfficeofQualityAssurance
W. Whitt, Chief Nuclear Safety Staff
v0. L. Williams, Jr. , Supervisor
Licensing Section
d E. Wills, Project Engineer
bec w/encls:
J RC Resident Inspector
Document Control Desk
State of Tennessee
,
.RII
RII
RII
6Qcf.
&
g KJenison:jw
SWF se
.DVerrelli
7/Af/85
7g85
7p85
.
.
.
. .
..
.
m
.
.
. .
. .
.
.
. .
.
.
.
. . .
. .
. .
.
. . . . .
.
.
-