IE Insp Repts 50-416/82-16 & 50-417/82-06 on 820223-26.No Noncompliance Noted.Major Areas Inspected:Fire Protection of Cable Trays,Review of QA Procedures & Quality Records for Electrical Components
ML20050L916
Person / Time
Site: Grand Gulf  Entergy icon.png
Issue date: 03/16/1982
From: Conlon T, Gibbons T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To:
Shared Package
ML20050L641 List:
References
50-416-82-16, 50-417-82-06, 50-417-82-6, NUDOCS 8204140296
Download: ML20050L916 (3)


Text

F

.

new UNITED STATES P

o,t NUCLEAR REGULATORY COMMISSION

$

E REGION 11 e!

' a ' "^ a "^ $' " " $""' aa

.

ATLANTA, GEORGIA 30303 l

I Report Nos. 50-416/82-16 and 50-417/82-06

,

Licensee: Mississippi Power and Light Company P. O. Box 1640 Jackson, MS 39205 Facility Name: Grand Gulf Units 1 and 2 Docket Nos. 50-416 and 50-417 i

License Nos. CPPR-118 and CPPR-119 f

Inspection at Grand Gulf site near Port Gibson, MS 3//C/S2.

{

ia Inspector:-_T. D. Gibbons c

~ Date Signed

[d#Nb h L MG[h Approved by:

y T. E. Conlon, Se'etion Chief

'Date Signed Engineering Inspection ranch

-

Division of Engineering and Technical Programs

'

SUMMARY

'

i Inspection on February 23-26, 1982 Areas Inspected This routine, unannounced inspection involved 24 inspector-hours on site in the

,

~

areas of fire protection of cable trays, followup on licensee identified items, review of QA procedures and quality records for electrical components.

Results Of the areas inspected, no violations or deviations were identified.

8204140296 820318 PDR ADOCK 05000 G

'

___

, _ _ _ _

_ - -. -

.

.

-

. - -

.

-.._ _ _, _.___

__

-

-

c

.

.

.

REPORT DETAILS 1.

Persons Contacted Licensee Employees

  • C. K. McCoy, Plant Manager
  • M. A. Lacey, QA Consultant
  • J. W. Yelverton QA, Field Supervisor NRC Resident Inspector
  • A. G. Wagner
  • Attended exit interview 2.

Exit Interview The inspection scope and findings were summarized on February 26, 1982, with those persons indicated in paragraph 1 above.

3.

Licensee Action on Previous Inspection Findings Not inspected.

4.

Unresolved Items Unresolved items were not identified during this inspection.

5.

Independent Inspection Ef forts The inspector examined the fire protective wrapping of Class lE cable trays in the auxiliary building. The inspector examined the sealing of penetra-tions for fire seals in the auxiliary building.

Within the areas examined there were no violations identified.

6.

Licensee Identified Items a.

(Closed) Item 416/CDR 81-36 and 417/CDR 81-24, " Incorrectly Sized Beam for Cable Tray Supports" (10 CFR 50.55(e)).

The final report was submitted on October 1,1981 and revised report on February 19, 1982.

The report has been reviewed and determined to be acceptable.

The inspector held discussions with responsible licensee representatives, and viewed supporting documentation to verify that the corrective actions identified in the report have been completed. The February 19, 1982 report clarified the chronology relating to this item and closes Unresolved Item 81-60-0,

.<

.

b.

(Closed) Item 416/CDR 81-39 " Remote Shutdown Panels" (10 CFR 50.55(e)).

The final report was submitted on February 19, 1982.

The report has been reviewed and determined to be acceptable.

The inspector held discussions with responsible licensee representatives, reviewed supporting documentation, and observed representative samples of work to verify that the corrective actions identified in the report have been completed. The licensee has repaired the unacceptable wiring.

c.

(Closed) Item 416/CDR 80-68 " Potter and Brumfield Relay Terminations" (10 CFR 50.55(e)).

The final report was submitted on February 15, 1982.

The report has been reviewed and determined to be acceptable.

The inspector held discussions with responsible licensee representa-tives, reviewed supporting documentation, and observed representative samples of work to verify that the corrective actions identified in the report have been completed. The licensee has repaired the unacceptable termination.

7.

Electrical (Components and Systems) Review of Quality Assurance Procedures and Review of Quality Records (Unit 1)

The inspector reviewed four relay coordination calculations to assure that they complied with the QAM in the areas of procedures, qualified review and corrective action. The calculations examined were:

PR 73 Revision 1, dated February 1,1982 PR 28 Revision 0, dated March 2,1978 PR 36 Revision 1, dated February 1,1982 PR 46 Revision 0, dated February 21, 1978 Within the areas examined there were no violations identified.

8.

Review of As-Builts The inspector selected four raceway runs as follows:

AATMI4Z, 1BATW26, 1BATW27, and 1BATW28 and three conduit runs as follows 1BARNQ08, 1ABRMH40, and 1ABRM263 to verify that the SAR and QAM were complied with in the areas of location, routing, supports, separation, isolation, loading and identi-fication.

Three cable as-built routings were examined to verify routing, identifica-tion, protection and separation. Three cable terminations were examined to assure that the design document and the installed wiring agreed.

Within the areas examined there were no violations identified.