IR 05000416/1982048
| ML20054F946 | |
| Person / Time | |
|---|---|
| Site: | Grand Gulf |
| Issue date: | 06/09/1982 |
| From: | Mcguire D, Moore D NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | |
| Shared Package | |
| ML20054F939 | List: |
| References | |
| 50-416-82-48, NUDOCS 8206180247 | |
| Download: ML20054F946 (1) | |
Text
4
'
lo...
SAFEGUA@SggMATION
-
'g NUCLEAR REGilLATORY COMMISSION
g ()g g
REGION 11
- .*
,S 101 MARIETTA ST, N.W..SulTE 3100 S
ATL ANTA. G EORGI A 30303 0,
%,
f'
- "*
JUN 101m Report No. 50-416/82-48 Docket No. 50-416 License No. CPPR-118 Licensee: Mississippi Power and Light Company P. O. Box 1640 Jackson, MS 39205 Facility Name:
Grand Gulf 1 Inspection at:
Port Gibson, MS Inspection conducted: May 26-28, 1982 Type of Inspection: Announced Physical Security Inspector:
_
_y wh Sf D. E. Moore, Physical Security Inspector Date 31gned Accompanied
//
6 [/N and Approved by: _
_J
_
D/te/ Signed
/
D. R. McGuire, Chief, Physical Protection Section, Technical Inspection Branch Division of Engineering and Technical Programs Inspection Summary _
Areas Inspected:
Included a preoperational review of the adequacy of implementing procedures; security force training and qualification; and security equipment installation to meet the requirements of 10 CFR 73.55 and the approved physical security plan.
The inspect.on involved 36 inspector hours on site by two NRC inspectors.
Eight inspection hours were accomplished during offshift periods.
Results:
The licensee's physical protection program was found to be adequate and capable of meeting applicable NRC regulations.
The licensee is required to implement Section 6.P.1 of the approved physical security plan prior to fuel load.
bb-
-
S-72 COPY 4 r
Copies 4 _Pages ihis Docu:::ent is not to be reproduced without specific approval of IE:II 8206180247 820610 PDR ADOCK 05000416 O
PDR ENCLOSLEE 00NTAIN5N -
...-.
- _ _ _
SAFEGUARDS INFO.WJLTION.' " " * " " " " '.
PAGE IS DECONTROLLED