IR 05000416/1982046

From kanterella
Jump to navigation Jump to search
IE Insp Rept 50-416/82-46 on 820518-21.No Noncompliance Noted.Major Areas Inspected:Licensee Identified Items & Startup Testing
ML20054M942
Person / Time
Site: Grand Gulf Entergy icon.png
Issue date: 06/15/1982
From: Conlon T, Gibbons T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To:
Shared Package
ML20054M935 List:
References
50-416-82-46, NUDOCS 8207150175
Download: ML20054M942 (4)


Text

. ._ . - _ _ -. . _ = - - . _ _ - - _ - . _ - . . - . -

!

  • *

.p aro

  1. o UNITED STATES ,

.

8 o NUCLEAR REGULATORY COMMISSION

"

. ! 3. -

!

$ E REGION ll s ,

  • 101 MARIETTA ST., N.W., SUITE 3100 i o ATLANTA. GEORGIA 30303 \ v .

..... ..

' *

'

i

' ,.

-,

i ,

Report No. 50-416/82-46 ',"

i ~

,

f

x ,

' g#

Licensee: Mississippi Power and Light Company '

1 /

P.O. Box 1640 / /. '

{

Jackson, MS 39205 / ,

Facility Name: Grand Gulf Unit 1 3 Docket No. 50-416 -)

License No. CPPR-118 ')'

Inspection at Grand Gulf si near Port Gibson, Missis (ppi .

'

Inspector: % IMf 'n  % 's & /L [W' '

E D.TEons V s '0 ate Signed . -

Approved by: (p/ u _ 8 5 [ '

T. E. Conlon, Section Chief 'Date' Signed - } y'

'

Engineering Inspection Branch l

,,, j;

.

'

l

<

Division of Engineering and Technical Programs ,

<

SUMMARY '

i

Inspection on May 18-21, 1982 '

. N l ,

e

, t Areas Inspected ,

This routine, announced inspection involved 29 inspecto'r-/iours or. site in the areas of licensee 1dentified items, startup testin Results s ji ,

,1 -

Of the areas inspected, no violations or deviations were iden,tified.

i

i>

,

, -

i (

1 .

'

f,

. 'i

' *

1! ,

j.~,

'

'

i e /

+ >-

,

8207150175 820617 *

-

PDR ADOCK 05000416 *

, G PDR ,

/ , ji

] e REPORT DETAILS Persons Contacted

,

Licensee Employees

  • C. K. McCoy, Plant Manager
  • J. C. Roberts, Startup Sunervisor

'

  • J. W. Yelverten, Nuclear Site QA Manager
  • M. A. Lacey,-QA Consultant NRC Resident Inspector

/ * A. G. Wagner o *D. E. Scott s

  • Attended exit interview t

4 Exit Interview

~ '

. ' The inspection scope and findings were summarized on May 21, 1982, with

,

those persons indicated in paragraph 1 abov i Licensee Action on Previous Inspection Findings

< Not inspecte .- Une,esolved Items *

i Unsesolved items were not identified during this inspectio I Independent Inspection Effort lhe inspector assisted tne RII startup inspector during test No. 7 of L '

1E71PT01. " Loss of Offsite Power" The inspector observed the operation of Y

<

j [, ; the 4160 volt switchgear during the tes i p

Within the arearf examined, there were no violations identifie . Licensee identified Item a

! (Clesed) Item 416/CDR 82-18 " Recirculation Line Sample Probe" (10 CFR 50.b(de)). The final report was submitted on May 6, 1982. The report har been reviewed and determined to be acceptable. The inspector held

'

discussions with responsible licensee representatives and reviewed suppo9tind documentation to verify that the corrective action identi-fied in the report has been complete The probe has been replaced with a r,edesigned prob ,

>

d

<

v

$

5 $

s Um-

~_ _ . _ - . ._ _ _ _ - _ _ _ _ _ _ _ _ _ . . _ _ _ _ _ _ _ . _

,, - _ _ _ _--- -__.-

i . . .

.

!

I (Closed) Item 416/CDR82-11 "Siesmic Bracing on Henry Pratt Valves"

.

(10 CFR 50.55(e)). The interim report was submitted on April 29, 198 '

The report has been reviewed and determined to be acceptable. The inspector held discussions with responsible licensee representatives

,

and reviewed supporting documentation to . verify that the corrective i actions identified in the report have been completed. The valves have I been modified by the vendor to meet the siesmic requirements.

j (Closed) Item 416/CDR 82-16 "MSIV Leakage Control System" (10 CFR

'

50.55(e)). The final report was submitted on May 3, 1982. The report

has been reviewed and determined to be acceptable. The inspector held
discussions with responsible licensee representatives and reviewed

! supporting documentation to verify that the corrective action identi-

,

fied in the report have been completed. The one length of tubing was rerouted to provide the proper slop (Closed) Item 416/CDR 82-07 " Unqualified NAMC0 Limit Switches" (10 CFR 50.55(e)). The final report was submitted on April 19, 1982. The

,

report has been reviewed and determined to be acceptable. The inspector held discussions with responsible licensee representatives and reviewed supporting documentation to verify that the corrective

,

actions identified in the report have been completed. The licensee has

! established a program to replace the unqualified limit switches. The work is being followed by MCAR 132.

3 (Closed) Item 416/CDR 80-67 - " Installation of Fire Dampers" (10 CFR

'

50.55(e)). The final report was submitted on December 1,1981. The

.

'

report has been reviewed and determined to be acceptable. The inspec-tor held discussions with responsible licensee representatives and reviewed supporting documentation to verify that the corrective actions

'

identified in the report have been complete The drawings and instructions have been correcte The work was reinspected by the license L

' (Closed) Item 416/CDR 82-24 " Reactor Mounting Channels" (10 CFR SU.55(e)). The inspector held discussions with responsible licensee representatives, reviewed supporting documentatio The licensee has

'

determined that this item is not reportable. There was no rework require (Closed) Item 416/CDR82-22 "'0' Ring Seals on Rosemont Transmitters" (10 CFR SU.55(e)). The final report was submitted on May 21, 198 The report has been reviewed and determined to be acceptabl The

inspector held discussions with responsible licensee representatives
and reviewed supporting documentation to verify that the corrective

'

action identified in the report has been completed. The licensee i cleaned the incorrect lubricant off the threads, replaced the "0" ring j and relubricated the threads with the correct lubricant.

i

_ . - - - _ - - ,,-....,__ . _ __., - - -_ _ - _ _

- . . .

h. (Closed) Item 4161/CDR82-19 "RCIC Turbine Relay" (10 CFR 50.55(e)).

The final report was submitted on May 21, 1982. The report ha been reviewed and determined to be acceptable. The inspector held discus-sions with responsible licensee representatives and reviewed supporting documentation to verify that the corrective action identified in the report has been completed. The licensee replaced the incorrect relay with the specified rela The following items were reviewed by the inspector but were not completely ready for inspection. These items remain ope CDR82-15 Defective P,elay in EDG 416-CDR81-42 NUREG 0588 416-CDR82-14 Stator Damage EDG 416-CDR82-04 Siesmic Sensing Line EDG 416-CDR82-17 GE HMA Relay 416-CDR82-23 Corroded Terminal Boards-Rosemont 416-CDR82-28 Hiller Actuators

.