IR 05000416/1982035
| ML20052C559 | |
| Person / Time | |
|---|---|
| Site: | Grand Gulf |
| Issue date: | 04/29/1982 |
| From: | Goode R, Mcguire D, Moore D NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | |
| Shared Package | |
| ML20052C556 | List: |
| References | |
| 50-416-82-35, NUDOCS 8205050154 | |
| Download: ML20052C559 (1) | |
Text
.
o UNITED STATES
.
g
NUCLEAR REGULATORY COMMISSION o
E REGION 11
b[
101 MARIETT A ST., N.W., SUITE 3100 ATLANTA, GEORGIA 3o3o3 o
A?R 2 91982 s
Report No. 82-35 Docket No. 50-416 License No. CPPR-118 Licensee: Mississippi Power and Light Company Jackson, MS 39205 Facility Name: Grand Gulf Inspection at:
Port Gibscn, MS Inspection conducted: April 12-16, 1982 Date of Last Physical Security Inspection Visit:
February 22-24, 1982 Type of In ectio:gUnannouncedPhysicalSecurity Inspectors:
(&dC
,, _
R h # d h N E 2--
R'. W.
dode,' Physical Security Inspector DateySigned fog E. Moore, Physical Security Inspector
--$
D.
__
u
=W ate Signed Approved by:Mi N
2f f1._
.2 D. R. McGuire, Chief, Physical Protection Section
_Date igned Technical Inspection Branch, Division of Engineering and Technical Programs Inspection Summary Areas Inspected:
Included preoperational review of security plan and implementing procedures, security organization, security program audit, records and reports, testing and maintenance, locks, keys and combinations, physical barriers, security system power supply, lighting, assessment aids, access controls, detection aids, alarm stations and communications.
The inspection involved 74 inspector hours on site by two NRC inspectors. The inspection was begun during an onshift period; 10 inspection hours were accomplished during offshift periods.
Results: The licensee was found to be in compliance with NRC requirements in ef fect at the time of the inspection.
[h I
S-F2
-
Copy y
or f Co W 2 Pages This Ocenzent ic not to be reproduced ritbnut specifio approval of IE:ll r205050154 820429
{DRADOCK05000g g
SAFEGUARDS INFORMATIOiT
.gg#S g.?7ls' "'
, mmmts