IE Insp Rept 50-416/82-43 on 820517-21.No Noncompliance Noted.Major Areas Inspected:Tmi Items,Preoperational Test Witnessing,Previous Test Results Review,Plant Tour & Followup Items
ML20054K145
Person / Time
Site: Grand Gulf Entergy icon.png
Issue date: 06/02/1982
From: Cantrell F, Scott D, Wagner A
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To:
Shared Package
ML20054K143 List:
References
RTR-NUREG-0660, RTR-NUREG-0737, RTR-NUREG-660, RTR-NUREG-737, TASK-1.C.7, TASK-2.E.4.4, TASK-2.F.3, TASK-3.D.1.4, TASK-TM 50-416-82-43, IEB-79-15, IEB-79-27, NUDOCS 8207010237
Download: ML20054K145 (4)


Text

{{#Wiki_filter:. j.p2 "%, UNITED STATES NUCLEAR REGULATORY COMMISSION ,A ,, q g g REGION 11

E 101 MARIETTA ST., N.W.. SUITE 3100 0,

ATLANTA, GEORGIA 30303 % d 4....s Report No. 50-416/82-43 Licensee: Mississippi Power and Light Company Jackson, MS Facility Name: Grand Gulf Docket No. 50-416 License No. CPPR-118 Inspectors: c LC4 EI L n 4 -[L sk/ru [ fate' Signed A. G. Wagner D.

Scott [ D6te signed Et gg . [[2 fL Approved by:_F. 'S.~ Cantrell, S(ctf Chief, Division of Dite Signed Project and Resid nt Programs SUMMARY Inspection on May 17 - May 21,1982 Areas Inspected This routine, announced inspection involved 54 inspector-hours on site in the ' areas of Inspector Follow-up Items, TMI Items, Preoperational Test Witnessing, Previous Test Results Review and Plant Tour.

Results Of the five areas inspected, no items of noncompliance or7 deviations were ~ identified.

i 8207010237 820602 DR ADOCK 05000

. DETAILS 1.

Persons Contacted Licensee Employi.es

  • C. K. McCoy, Nuclear Plant Manager
  • J. W. Yelverton, Quality Assurance Manager
  • M. A. Lacey, Quality Assurance Supervisor C. R. Hutchinson,. Startup Manager
  • J. C. Roberts, Startup Supervisor G. Zinke, Test Supervisor Other licensee employees contacted included technicians and operators.
  • Attended exit interview 2.

Exit Interview The inspection scope and findings were summarized on May 21, 1982, with those persons indicated in paragraph 1 above. The licensee had no comments regarding the inspection findings.

3.

Licensee Action on Previous Inspection Findings Not inspected.

4.

Unresolved Items Unresolved items were not identified during this inspection.

5.

Preoperational Test Witnessing

The inspector witnessed portions of the conduct of IE71PT01,. Loss of Power

l Preoperational Test. The test was observed for conformance with Grand Gulf Startup Manual Chapters 5000 and 7000.

No violations or deviations were identified within the area inspected.

6.

IE Bulletins Mississippi Power and Light Company has responded to NRR for review of the following IE Bulletins. There is no site action required at this time. The following items are closed.

79-27 79-15

. . ____ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _.. _ _ _ _ _ _ _ .. .

7.

TMI Task Action Plan Implementation A review was conducted of the procedures and actions implementing the . requirements of the TMI Task Action Plan. These requirements are delineated l in NUREG 0660 and 0737.

a.

I.C.7.

The inspector verified that a NSS startup representative has reviewed the low power startup test procedures.

This item is closed.

b.

II.E.4.4 There is no site verification required at this time. This item is closed. (NUREG 0660 Item) c.

I11.D.1.4 There is no site verification required at this time. This item is closed. (NUREG 0660 Item) d.

II.F.3 There is no site verification required at this time. This item is closed. (NUREG 0660 Item) 8.

Test Results Review The following completed preoperational and acceptance tests were reviewed for conformance with Grand Gulf Startup Manual Chapters 5000, 7000 and Regulatory Guide 1.68.

a.

IN21AT01 Feedwater Acceptance Test, approved April 29, 1982.

b.

1F15PT01 Refueling Equipment Preoperational Test, approved April 26, 1982.

c.

IP11AT01 Condensor and Refueling Water Storage Transfer System, approved April 27, 1982.

d.

IC885T02 Acceptance Test of Pipe Vibration and Temperature Sensors on NSSS Piping, approved May 3,1982.

e.

1Y36AT01 Grounding System, approved May 4,1982 f.

1N22AT02 Condensate Precoat Filter, approved April 22, 1982 g.

IL62AT02 120/240 VAC Uninterruptible Power Supply, approved May 7, 1982.

No violations or deviations were identified within the areas inspected.

9.

Inspector Follow-up Items (Closed) Open Item 416/81-31-02.

The inspector has reviewed the revised general employee lesson plan.

There are no further questions concerning this item. This item is close. _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _. _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ .. .

(Closed) Open Item 416/81-13-02. The inspector has discussed this item with licensee management. Portions of the item are not applicable due to system design. The licensee has incorporated by Test Change Notice the require-ments for verifying system cleanliness during operation.

There are no further questions concerning this item. This item is closed.

10.

Plant Tour The inspector toured portions of the control building.

The inspector observed the following activities: housekeeping; equipment preservation; clearances; communications and equipment controls.

i l No violations or deviations were identified within the areas inspected.