Forwards IE Insp Repts 50-369/79-35 & 50-370/79-21 on 790926-28.No Noncompliance Noted
ML19270H720
Person / Time
Site: McGuire, Mcguire  Duke Energy icon.png
Issue date: 10/24/1979
From: Murphy C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Parker W
DUKE POWER CO.
Shared Package
ML19270H719 List:
References
NUDOCS 8001020688
Download: ML19270H720 (2)


See also: IR 05000369/1979035

Text

'

pn nicoq'o

UNITED STATES

+

!

NUCLEAR REGULATORY COMMISSION

'

boE

REGION 11

, y.,

0

%****[4,/

.

o

'

I

101 MARIETTA ST., N.W., EUITE 310o

ATLANTA. G EORG8A 3o3o3

OCT 2 41979

In Reply Refer To:

RII:MDH

50-369/79-35

50-370/79-21

Duke Power Company

Atta:

W. O. Parker, Jr.

Vice President, Steam Production

Post Office Box 2178

Charlotte, North Carolina 28242

Gentlemen:

This refers to the inspection conducted by M. D. Hunt of this office on

September 26-28, 1979 of activities authorized by NRC Construction Permit Nos.

CPPR-83 and CPPR-84 for the McGuire Nuclear Station facility, and to the

discussion of our findings held with G. W. Grier at the conclusion of the

inspection.

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report. Within these areas, the inspection ec:::;i::ted of

selective examinations of procedures and represcintative Ica.Ja ;ntarviews with

personnel', and observations by the inspectors.

Within the scope of this inspection, no items of noncompliance were disclosed.

We have examined actions you have taken with regard to previously identified

enforcement matters. These are discussed in the enclosed inspection report.

In accordance with Section 2.790 of the NRC's " Rules of Practice", Part 2,

Title 10, Code of Federal Regulations, a copy of this letter and the enclosed

inspection report will be placed in the NRC's Public Document Room.

If this

report contains any information that you (or your contractor) believe to be

proprietary, it is necessary that you make a written application within 20 days

to this office to withhold such information from public disclosure.

Any such

application must include a full statement of the reasons on the basis of which

it is claimed that the information is proprietary, and should be prepared so

that proprietary information identified in the application is contained in a

separate part of the document.

If we do not hear from you in this regard within

the specified period, the report will be placed in the Public Document Room.

1674

080

ggat o2o 6d

-,#GhcSHZ

.

0CT 2 4 t979

Duke Power Company

-2-

-

Should you have any questions concerning this letter, we will be glad to discuss

them with you.

Sincerely,

d

4

-

C. E. Murp y, C)i f

Reactor Construction and

Engineering Support Branch

Enclosures:

Inspection Report Nos. 50-369/79-35

and 50-370/79-21

cc w/ enclosures:

M. D. McIntosh, Plant Manager

Post Office Box 488

Cornelius, North Carolina 28031

J. C. Rogers, Project Manager

Post Office Box 33189

Charlotte, North arolina 28242