IR 05000364/1979004
| ML19259C636 | |
| Person / Time | |
|---|---|
| Site: | Farley |
| Issue date: | 04/09/1979 |
| From: | Martin R, Wagner A NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | |
| Shared Package | |
| ML19259C632 | List: |
| References | |
| 50-364-79-04, 50-364-79-4, NUDOCS 7908070302 | |
| Download: ML19259C636 (3) | |
Text
a
-.
.
UNITED STAT 15 (g*#f00gjo,,
NUCLEAR REGULATORY COMMISSION
,
REGloN lt o
u
.$
101 M ARIETT A STRE ET. N.W.
!
ATLANTA, GEORGIA 30303
\\, * * * * * /
Report No. 50-364/79-04 Lice.nsee: Alabama Power Company 600 North 18th Street Birmingham, Alabama 35291 Facility Name: Farley Unit 2 Docket No. 50-364 License No. CPPR-86 Inspection at Farley Site near Ashford, Alabama M'-)
Inspector: /
c
,; - /
_,
_
AA.--G.' Wagrie r
,/
Date Signed
/
Approyed by:
//p d A
Y/f[ff R.
.
rtif,~S'ection Chfef, RONS Branch Dite"Sigfied SUMMARY Inspection on March 19-22, 1979 Areas Inspected This routine unannoanced inspection involved 35 inspector-hours onsite in the areas of preoperational test procedure review, preoperational test pro-cedure witnessing and independent inspection ef fort.
,
Results Of the three areas inspected, no apparent items of noncompliance or devia-tions were identified in two areas; one apparent item of noncompliance was found in one area (Failure to follow procedures - 364/79-04-01).
2l00 328 7908070 3 0 2
@
.
.
.
DETAILS 1.
Persons Contacted Licensee Employees
- G. Hairston, Plant Manager
- D. Mansfield, Startup Superintendent
- L. Ward, Startup Supervisor
- K. Burr, Test Supervisor J. Greenswood, Test Supervisor
- J. Kale, Jr., Operations QA
- L. Stinson, Startup Supervisor
- R. Hill, Operations QA
- F. Wurster, Operations QA
- Attended exit interview.
2.
Exit Interview The inspection scope and findings were summarized on March 22, 1979 with those persons indicated in Paragraph I above. There were no objections raised by the licensee regarding the findings.
3.
Licensee Action on Previous Inspection Findings Not inspected.
4.
Unresolved Items Unresolved items were not identified during this inspection.
5.
Preoperational Test Procedure Review Preoperational test procedures were reviewed for conformance with Regulatory Guide 1.68, 1.79, Operational Quality Assurance Manual Chapter 11 section 11.4.1, FSAR sections 6.3, 8.3 and 14.1.3.
No items of noncompliance or deviations were noted during the review of the following procedures:
a.
024-5-002 Diesel Generator 1-2A,1C, 2C to Unit 2 Pre-op, Approved 2-14-79 b.
052-5-008 High Head Safety Injection Preoperational Test, Approved 8-11-78 2100 329
..
.
.
..
.
.
-2-6.
Preoperational Test Witnessing Parts of two preoperational tests were witnessed.
a.
052-5-008 High Head Safety Injection Preoperational Test, Approved 8-11-78 No comments b.
024-5-002 Diesel Generator 1-2A, IC, 2C to Unit 2 Pre-op, Approved 2-14-79 (1) Two examples of an apparent item of noncompliance were identified by the inspector:
(a) During the testing of a diesel generator breaker for Unit 2a jumper bypass was erroneously installed in the Unit 1 breaker control circuit.
This breaker was out of service at the time of installation; and (b) At the completion of the test a bypass jumper installed by the procedure was not removed as required by the procedure.
(2) The inspector was concerned with the lack of formality withwhich test personnel were briefed prior to commencing the testing.
7.
Plant Tour The inspector toured portions of Unit 2 reactor building, control bays, auxiliary building, and diesel generator building.
No items of noncompliance or deviations were identified.