MONTHYEARML24295A3742024-10-23023 October 2024 Project Manager Assignment IR 05000354/20240032024-10-23023 October 2024 Integrated Inspection Report 05000354/2024003 ML24291A0572024-10-17017 October 2024 License Amendment Request (LAR) – Hope Creek Technical Specification Conversion to NUREG-1433, Revision 5, Supplement 1 LR-N24-0063, Emergency Plan Document Revision Implemented September 18, 2024. Includes NC.EP-EP.ZZ-0903, Rev. 7, Opening of Emergency Operations Facility (EOF)2024-10-0707 October 2024 Emergency Plan Document Revision Implemented September 18, 2024. Includes NC.EP-EP.ZZ-0903, Rev. 7, Opening of Emergency Operations Facility (EOF) LR-N24-0059, 2024 Annual 10 CFR 50.46 Report2024-09-30030 September 2024 2024 Annual 10 CFR 50.46 Report LR-N24-0056, Response to Request for Additional Information Associated with License Amendment Request - Revise Hope Creek Generating Station Technical Specification to Change Surveillance Intervals to Accommodate a 24-Month Fuel Cycle2024-09-26026 September 2024 Response to Request for Additional Information Associated with License Amendment Request - Revise Hope Creek Generating Station Technical Specification to Change Surveillance Intervals to Accommodate a 24-Month Fuel Cycle IR 05000272/20244022024-09-23023 September 2024 And Salem Nuclear Generating Station, Units 1 and 2 - Security Baseline Inspection Report 05000354/2024402, 05000272/2024402, and 05000311/2024402 (Cover Letter Only) ML24255A8042024-09-11011 September 2024 Notification of Conduct of a Fire Protection Team Inspection LR-N24-0057, In-Service Inspection Activities2024-09-10010 September 2024 In-Service Inspection Activities 05000354/LER-2024-001-01, Invalid Primary Containment Integrated Leak Rate As-Found Test (ILRT) Supplement2024-09-0505 September 2024 Invalid Primary Containment Integrated Leak Rate As-Found Test (ILRT) Supplement ML24249A1362024-09-0404 September 2024 EN 57304 - Westinghouse Electric Company, LLC, Final Report - No Embedded Files. Notification of the Potential Existence of Defects Pursuant to 10 CFR Part 21 IR 05000354/20240052024-08-29029 August 2024 Updated Inspection Plan for Hope Creek Generating Station (Report 05000354/2024005) LR-N24-0044, Relief Request VR-042024-08-0606 August 2024 Relief Request VR-04 IR 05000354/20240022024-07-30030 July 2024 Integrated Inspection Report 05000354/2024002 ML24200A0572024-07-18018 July 2024 Request for Withholding Information from Public Disclosure for License Amendment Request to Revise Technical Specification Lift Settings for Reactor Coolant System Safety/Relief Valves NUREG-1433, – Acceptance of License Amendment Request Concerning Technical Specification Conversion to NUREG-1433, Revision 52024-07-16016 July 2024 – Acceptance of License Amendment Request Concerning Technical Specification Conversion to NUREG-1433, Revision 5 ML24145A1772024-07-15015 July 2024 And Salem Nuclear Generating Station, Unit Nos. 1 and 2 - Issuance of Amendment Nos. 236, 349, and 331 Modify Exclusion Area Boundary ML24197A0552024-07-15015 July 2024 Requalification Program Inspection 05000354/LER-2024-001, Invalid Primary Containment Integrated Leak Rate As-Found Test (ILRT)2024-07-0202 July 2024 Invalid Primary Containment Integrated Leak Rate As-Found Test (ILRT) LR-N24-0030, License Amendment Request to Revise Technical Specification Lift Settings for Reactor Coolant System Safety/Relief Valves2024-06-28028 June 2024 License Amendment Request to Revise Technical Specification Lift Settings for Reactor Coolant System Safety/Relief Valves IR 05000272/20245012024-06-12012 June 2024 And Salem Nuclear Generating Station, Units 1 and 2 - Emergency Preparedness Biennial Exercise Inspection Report 05000354/2024501, 05000272/2024501 and 05000311/2024501 ML24150A1002024-05-28028 May 2024 Core Operating Limits Report, Reload 25, Cycle 26, Revision 23 ML24150A0032024-05-28028 May 2024 Request for Exemptions from 10 CFR 50.82(a)(8)(i)(A) and 10 CFR 50.75(h)(1)(iv) and Proposed Amendment to the Decommissioning Trust Agreement LR-N24-0041, Stations, Revisions to Emergency Plan Document Nc EP-EP-ZZ-01102, Rev. 28, Emergency Coordinator Response2024-05-22022 May 2024 Stations, Revisions to Emergency Plan Document Nc EP-EP-ZZ-01102, Rev. 28, Emergency Coordinator Response LR-N24-0004, License Amendment Request – Revise Technical Specification to Change Surveillance Intervals to Accommodate a 24-Month Fuel Cycle2024-05-20020 May 2024 License Amendment Request – Revise Technical Specification to Change Surveillance Intervals to Accommodate a 24-Month Fuel Cycle ML24142A4072024-05-20020 May 2024 License Amendment Request (LAR) - Hope Creek Technical Specification Conversion to NUREG-1433, Revision 5 IR 05000354/20240012024-05-0808 May 2024 Integrated Inspection Report 05000354/2024001 IR 05000354/20240102024-05-0707 May 2024 Information Request for Quadrennial Baseline Comprehensive Engineering Team Inspection; Notification to Perform Inspection 05000354/2024010 LR-N24-0035, 2023 Annual Radiological Environmental Operating Report (AREOR)2024-04-30030 April 2024 2023 Annual Radiological Environmental Operating Report (AREOR) LR-N24-0034, 2023 Annual Radioactive Effluent Release Report (ARERR)2024-04-30030 April 2024 2023 Annual Radioactive Effluent Release Report (ARERR) LR-N24-0024, Response to Request for Additional Information Associated with License Amendment Request (LAR) to Modify the Salem and Hope Creek Exclusion Area Boundary2024-04-26026 April 2024 Response to Request for Additional Information Associated with License Amendment Request (LAR) to Modify the Salem and Hope Creek Exclusion Area Boundary IR 05000354/20243012024-04-10010 April 2024 Initial Operator Licensing Examination Report 05000354/2024301 LR-N24-0011, Supplemental Information to License Amendment Request (LAR) to Modify the Salem and Hope Creek Exclusion Area Boundary2024-04-0505 April 2024 Supplemental Information to License Amendment Request (LAR) to Modify the Salem and Hope Creek Exclusion Area Boundary IR 05000272/20240112024-04-0101 April 2024 And Salem Nuclear Generating Station, Units 1 and 2 - Plant Modification and Annual Problem Identification and Resolution Inspection Report 05000354/2024011, 05000272/2024011, and 05000311/2024011 LR-N24-0028, And Salem Generating Station - Notice of Intent to Pursue Subsequent License Renewal2024-03-28028 March 2024 And Salem Generating Station - Notice of Intent to Pursue Subsequent License Renewal IR 05000272/20244032024-03-20020 March 2024 And Hope Creek Generating Station - Information Request for the Cybersecurity Baseline Inspection, Notification to Perform Inspection 05000272/2024403, 05000311/2024403, and 05000354/2024403 LR-N24-0021, And Salem Generating Station, Units 1 and 2 - Guarantees of Payment of Deferred Premiums2024-03-20020 March 2024 And Salem Generating Station, Units 1 and 2 - Guarantees of Payment of Deferred Premiums 05000354/LER-2023-003-01, Inadvertent Main Turbine Control Valve Closure Caused Reactor Scram2024-03-19019 March 2024 Inadvertent Main Turbine Control Valve Closure Caused Reactor Scram LR-N24-0027, Inadvertent Main Turbine Control Valve Closure Caused Reactor Scram2024-03-19019 March 2024 Inadvertent Main Turbine Control Valve Closure Caused Reactor Scram LR-N24-0020, Generation Station and Salem Generating Station, Units 1 & 2 - Annual Property Insurance Status Report2024-03-0707 March 2024 Generation Station and Salem Generating Station, Units 1 & 2 - Annual Property Insurance Status Report IR 05000354/20230062024-02-28028 February 2024 Annual Assessment Letter for Hope Creek Generating Station (Report 05000354/2023006) IR 05000272/20244012024-02-26026 February 2024 And Salem Nuclear Generating Station, Units 1 and 2 - Security Baseline Inspection Report 05000354/2024401, 05000272/2024401 and 05000311/2024401 (Cover Letter Only) LR-N24-0010, Technical Specification 6.9.1.5.b: 2023 Annual Report of SRV Challenges2024-02-22022 February 2024 Technical Specification 6.9.1.5.b: 2023 Annual Report of SRV Challenges 05000354/LER-2023-003, Inadvertent Main Turbine Control Valve Closure Caused Reactor Scram2024-02-12012 February 2024 Inadvertent Main Turbine Control Valve Closure Caused Reactor Scram IR 05000354/20230042024-02-0101 February 2024 Integrated Inspection Report 05000354/2023004 ML24030A8752024-02-0101 February 2024 Operator Licensing Examination Approval ML24009A1022024-01-26026 January 2024 – Exemption from Select Requirements of 10 CF Part 73 (EPID L-2023-LLE-0045 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) IR 05000354/20234012024-01-22022 January 2024 Material Control and Accounting Program Inspection Report 05000354/2023401 ML23341A1372024-01-16016 January 2024 Issuance of Amendment No. 235 Revise Trip and Standby Auto-Start Logic Associated with Safety Related Heating, Ventilation and Air Conditioning ML23335A1122023-12-15015 December 2023 Retest Schedule for Drywell to Suppression Chamber Vacuum Breakers 2024-09-05
[Table view] Category:License-Operator Examination Report
MONTHYEARIR 05000354/20243012024-04-10010 April 2024 Initial Operator Licensing Examination Report 05000354/2024301 ML22350A4692022-12-16016 December 2022 301 Exam Administrative Items (2 Year Delayed release)(ADAMS-2A-3) IR 05000354/20213012021-04-0101 April 2021 Initial Operator Licensing Examination Report 05000354/2021301 IR 05000354/20193012019-10-17017 October 2019 Initial Operator Licensing Examination Report 05000354/2019301 IR 05000354/20183022018-08-22022 August 2018 Retake Operator Licensing Examination Report 05000354/2018302 IR 05000354/20163012016-10-25025 October 2016 NRC Initial Operator Licensing Examination Report 05000354/2016301 IR 05000354/20153012015-04-28028 April 2015 Er 05000354/2015301; 02/23-27/15, 03/03, 06, 31/15, and 04/01/15; Hope Creek Generating Station; Initial Operator Licensing Examination Report IR 05000354/20123012012-04-18018 April 2012 Er 05000354-12-301; March 5-14, 2012; Hope Creek Generating Station, Unit 1; Initial Operator Licensing Examination Report IR 05000354/20113012011-02-14014 February 2011 Er 05000354-11-301, on January 27, 2011, Hope Creek Generating Station - Unit 1, Initial Operator Licensing Retake Examination Report IR 05000354/20103012010-10-0404 October 2010 Er 05000354/10-301 for Hope Creek Generating Station, Unit 1, Initial Operator Licensing Examination Report IR 05000354/20093012009-03-20020 March 2009 Er 05000354-09-301, on February 2-18, 2009, Hope Creek Generating Station, Initial Operator Licensing Examination Report IR 05000354/20073012007-11-26026 November 2007 Er 05000354-07-301; Exam Dates 9/24-28, 2007; Hope Creek Generating Station; Initial Senior Reactor Operator (SRO) Licensing Examination IR 05000354/20053012006-01-13013 January 2006 IR 05000354-05-301; November 28 to December 5, 2005; Hope Creek; Initial Operator Licensing Examination. Two of Two Applicants Passed the Examination (One Reactor Operator (Ro), One Senior Reactor Operator (SRO) Instant) NTD-05-046, Response to NRC Form 536 (RIS 2005-19) Operator Licensing Examination Data2005-10-31031 October 2005 Response to NRC Form 536 (RIS 2005-19) Operator Licensing Examination Data IR 05000354/20023022002-08-0808 August 2002 IR 05000354/2002-302, on July 19, 2002; Hope Creek Generating Station; Initial Reactor Operator (RO) Licensing Retake Examination ML0220000482002-07-10010 July 2002 Response to NRC Form 536 (RIS 2002-9) Operator Licensing Examination Data ML0213506732002-05-15015 May 2002 IR 05000387/2002-301 and IR 05000388/2002-301, Hope Creek Station, Inspection on March 11-18, 2002, Related to Initial Operator Licensing Examinations. Four of Five Reactor Operator Applicants Passed All Portions of the Examination 2024-04-10
[Table view] |
Text
ust 22, 2018
SUBJECT:
HOPE CREEK GENERATING STATION - RETAKE OPERATOR LICENSING EXAMINATION REPORT 05000354/2018302
Dear Mr. Sena:
On July 26, 2018, the U.S. Nuclear Regulatory Commission (NRC) completed an examination at the Hope Creek Generating Station. The enclosed examination report documents the results, which were discussed on August 2, 2018, with Mr. Mark Shaffer and other members of your staff.
The examination included the evaluation of one applicant for a reactor operator license. The operating retake examination was developed using NUREG-1021, "Operator Licensing Examination Standards for Power Reactors," Revision 11. The license examiner determined that the one applicant satisfied the requirements of Title 10 of the Code of Federal Regulations (10 CFR) Part 55, and the appropriate license was issued on August 2, 2018.
No findings were identified during this examination. This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and the NRC Public Document Room in accordance with 10 CFR, Part 2.390, Public Inspections, Exemptions, Requests for Withholding.
Sincerely,
/RA/
Donald E. Jackson, Chief Operations Branch Division of Reactor Safety Docket Number: 50-354 License Number: NPF-57 Enclosure:
Examination Report 05000354/2018302 w/Attachment: Supplementary Information cc w/encl: Distribution via ListServ
SUMMARY
ER 05000354/2018302; 7/26/2018; Hope Creek Generating Station Retake Operator Licensing
Examination Report.
One NRC examiner evaluated the competency of one retake applicant for a reactor operator license at Hope Creek Generating Station. The facility licensee developed the examination using NUREG-1021, "Operator Licensing Examination Standards for Power Reactors," Revision 11. The NRC administered the retake operating test on July 26, 2018. The NRC examiner determined that the one applicant satisfied the requirements of 10 CFR Part 55, and the appropriate license has been issued.
NRC-Identified and Self-Revealing Findings
No findings were identified.
Licensee-Identified Violations
None.
REPORT DETAILS
OTHER ACTIVITIES (OA)
4OA5 Other Activities - Retake Operator License Examination
.1 License Applications
a. Scope
The examiner reviewed the single license application submitted by the licensee to ensure the application reflected that the applicant satisfied relevant license eligibility requirements. The application was submitted on NRC Form 398, Personal Qualification Statement, and NRC Form 396, Certification of Medical Examination by Facility Licensee. The examiner also audited the license reapplication in detail to confirm that it accurately reflected the subject applicants qualifications. This audit focused on the applicants remedial training since the original examination.
b. Findings
No findings were identified.
.2 Operator Knowledge and Performance
a. Examination Scope
One NRC examiner administered the retake administrative operating examination to one reactor operator applicant on July 26, 2018. This test consisted of five administrative tasks.
b. Findings
The applicant passed the test.
No post exam comments were submitted by the licensee.
.3 Initial Licensing Examination Development
a. Examination Scope
The facility licensee developed the examination in accordance with NUREG-1021, Revision 11. All licensee facility training and operations staff involved in examination preparation and validation were listed on a security agreement. The facility licensee submitted the draft examination package on July 17, 2018. The NRC conducted an onsite validation of the operating examination on the morning of July 26, 2018.
Comment resolution was completed prior to administration of the examination that afternoon.
b. Findings
No findings were identified.
.4 Simulation Facility Performance
a. Examination Scope
The examiner observed simulator performance with regard to plant fidelity during the examination validation and administration.
b. Findings
No findings were identified.
.5 Examination Security
a. Examination Scope
The examiner reviewed examination security practices during onsite examination validation and administration for compliance with NUREG-1021, Revision 11 requirements.
b. Findings
No findings were identified.
4OA6 Meetings, Including Exit
The chief examiner presented the examination results to Mr. Mark Shaffer, Operations Training Manager, and other members of the licensee's management staff on August 2, 2018. The licensee acknowledged the findings presented.
The licensee did not identify any information or materials used during the examination as proprietary.
ATTACHMENT:
SUPPLEMENTARY INFORMATION
KEY POINTS OF CONTACT
Licensee Personnel
Mark Shaffer, Operations Training Manager
NRC Personnel
- J. DAntonio, Chief Examiner
ITEMS OPENED, CLOSED, AND DISCUSSED
None
ADAMS DOCUMENTS REFERENCED