IR 05000255/2002008

From kanterella
Jump to navigation Jump to search
IR 05000255-02-008, on 07/22-07/25/2002; Nuclear Management Co.Llc, Palisades Nuclear Plant; Supplemental Inspection - Mitigating Systems Cornerstone
ML022260905
Person / Time
Site: Palisades Entergy icon.png
Issue date: 08/14/2002
From: Falevits Z
NRC/RGN-III/DRS/EEB
To: Cooper D
Nuclear Management Co
References
IR-02-008
Download: ML022260905 (14)


Text

ust 14, 2002

SUBJECT:

PALISADES NUCLEAR GENERATING PLANT - NRC SUPPLEMENTAL INSPECTION REPORT 50-255/02-08(DRS)

Dear Mr. Cooper:

On July 25, 2002, the NRC completed a supplemental inspection at your Palisades Nuclear Generating Plant regarding a White inspection finding. This White finding involved smoke detectors in the northwest portion of the cable spreading room which were not located and installed in accordance with the applicable National Fire Protection Association code. The enclosed report presents the results of that inspection which were discussed on July 25, 2002, with members of your staff.

This supplemental inspection was an examination of activities conducted under your license as they relate to safety and compliance with the Commissions rules and regulations and with the conditions of your license. Within these areas, the inspection consisted of a selected examination of procedures and representative records, and interviews with personnel.

Specifically, this inspection focused on your assessment of the root causes and corrective actions associated with the White inspection finding.

Based upon the results of this inspection, no findings of significance were identified.

In accordance with 10 CFR 2.790 of the NRCs Rules of Practice, a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRCs document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). We will gladly discuss any questions you have concerning this inspection.

Sincerely,

/RA/

Zelig Falevits, Acting Chief Electrical Engineering Branch Division of Reactor Safety Docket No. 50-255 License No. DPR-20 Enclosure: Palisades Supplemental Inspection Report 50-255/02-08(DRS)

cc w/encl: R. Fenech, Senior Vice President, Nuclear Fossil and Hydro Operations L. Lahti, Manager, Licensing R. Anderson, Chief Nuclear Officer, NMC A. Udrys, Esquire, Consumers Energy Company S. Wawro, Nuclear Asset Director, Consumers Energy Company W. Rendell, Supervisor, Covert Township Office of the Governor Michigan Department of Environmental Quality Department of Attorney General (MI)

SUMMARY OF FINDINGS

IR 05000255-02-08(DRS); Nuclear Management Company, LLC, on 07/22 through 07/25/2002;

Palisades Nuclear Plant; Supplemental Inspection - Mitigating Systems Cornerstone.

This supplemental inspection was performed by a regional inspector. No findings of significance were identified. The NRCs program for overseeing the safe operation of commercial nuclear power reactors is described in NUREG-1649, Reactor Oversight Process,

Revision 3, dated July 2000.

Inspector Identified Findings

Cornerstone: Mitigating Systems

The U. S. Nuclear Regulatory Commission (NRC) performed this supplemental inspection to assess the licensees root cause evaluation, extent of condition determination, and corrective actions for the smoke detectors in the northwest portion of the cable spreading room that were not located and installed in accordance with the applicable National Fire Protection Association (NFPA) code. This performance issue was previously characterized as having low to moderate safety significance (i.e., White) in an NRC letter dated October 26, 2001, which comunicated the preliminary assessment of the finding documented in NRC Inspection Report 50-255/01-08(DRS). During this supplemental inspection, performed in accordance with Inspection Procedure 95001, the inspector concluded that the licensee had developed a comprehensive corrective action plan that addressed this issue as well as any other historical NFPA code conformance issues. Additionally, measures were in place that should adequately prevent similar problems from occurring in the future. However, the inspector also concluded that the licensees apparent cause evaluation for this issue was less rigorous than would be expected for an issue of this significance. Because of the extensive corrective actions for this issue; however, the inspector determined that the issue was being appropriately addressed and resolved by the licensee.

Given the licensees acceptable performance in addressing the smoke detectors, the white finding associated with this issue will only be considered in assessing plant performance for a total of four quarters in accordance with the guidance in NRC Inspection Manual Chapter (IMC)0305, Operating Reactor Assessment Program.

Report Details 01

INSPECTION SCOPE

The U. S. Nuclear Regulatory Commission (NRC) performed this supplemental inspection to assess the licensees evaluation associated with the smoke detectors in the northwest portion of the cable spreading room which were not located and installed in accordance with the applicable National Fire Protection Association code. This performance issue was previously characterized as White in NRC Inspection Report 50-255/01-08(DRS) and is related to the mitigating system cornerstone in the reactor safety strategic performance.

EVALUATION OF INSPECTION REQUIREMENTS 02.01 Problem Identification a.

Determination of who (i.e., licensee, self-revealing, or NRC), identified the issue and under what conditions the issue was identified The issue was identified by the NRC during the triennial Fire Protection Inspection.

Based upon the conditions at the time that the condition was discovered, the inadequacy of the smoke detectors in the northwest portion of the cable spreading room could have caused a delay in the detection of a fire in that area.

The inspector determined that the licensee appropriately identified who and under what conditions the issue was identified.

b.

Determination of how long the issue existed, and prior opportunities for identification The licensee determined during the apparent cause evaluation that insufficient application of engineering judgement had been incorporated into the placement of the smoke detector in the northwest area of the cable spreading. Because of this, the condition had existed since installation of the smoke detector. The modifications that installed the detection systems were performed in response to the NRC Fire Protection Safety Evaluation Report, dated September 1, 1978, for the Palisades Nuclear Plant.

The licensee stated that at the time that the fire protection modifications were made in response to the NRC Fire Protection Safety Evaluation Report, the NFPA Codes were very basic and subject to a wide range of interpretations. These interpretations, as was the case for the fire detection in the cable spreading room, were sometimes made non-conservatively and incorrectly by the fire protection engineer(s) designing the system.

Until more recently, many of these code interpretations were never really questioned.

However, presently, the industry as a whole has a more complete understanding of the codes and the intent behind the codes.

The licensee did not document in its apparent cause analysis if any prior opportunities for identification of this issue existed; however, during the inspection, the licensee provided a copy of a self-assessment that was performed just prior to the triennial Fire Protection Inspection. The self-assessment identified that because of code conformance issues at other plants, Palisades had initiated a code documentation effort.

However, it is unknown whether the smoke detector issue would have been identified by this effort.

c.

Determination of the plant-specific risk consequences (as applicable) and compliance concerns associated with the issue The licensee documented in the evaluation of this issue that this condition was classified as a White finding (i.e., a finding of low to moderate safety significance). The issue was classified as a White finding because detection of a fire in the northwest portion of the cable spreading room may have been delayed. As a result, sufficient damage to cabling could have occurred before the fire would be extinguished. The affiliated damage could have required a shutdown of the plant from outside the control room, significantly increasing the complexity of manual actions required to achieve safe shutdown. The licensee acknowledged the finding and its safety and risk significance.

Because of the risk associated with this issue, the licensee initiated hourly fire tours in the cable spreading room. Additionally, because of the overall concern regarding smoke detectors, immediately after this issue was discovered, hourly fire watches were initiated for all other alternate shutdown areas except for the control room, since it is continuously manned. These areas were chosen for fire watches, because they represented the fire areas with the highest potential risk. Based upon the licensees actions, the inspector concluded that the licensee appropriately addressed the risk consequences and compliance concerns associated with the issue.

02.02 Root Cause and Extent of Condition Evaluation a.

Evaluation of method(s) to identify root cause(s) and contributing cause(s)

As per the licensees procedure, 3.03, Corrective Action Process, Revision 27, this issue was classified as a Significance Level 3 condition. A Level 3 condition is defined as A Condition Adverse to Quality (CAQ) for which an apparent cause evaluation is determined to be warranted. The apparent cause evaluation is not as detailed and structured as the root cause evaluation. As defined in Procedure 3.03, an Apparent Cause is the most likely cause of the failure, given the way the failure manifests itself.

As a result, this evaluation did not require the identification of a root cause and contributing causes. However, procedural guidelines were adhered to in the formulation of the apparent cause.

b.

Level of detail of the root cause evaluation This issue was originally classified by the licensee as a Significance Level 2 issue.

Under this original classification, the licensee would have been required to perform a full root cause evaluation. Licensee personnel involved in the response for this Condition Report (CR) obtained permission from the Corrective Action Review Board (CARB) to downgrade the significance of the CR to Significance Level 3 which involved only an apparent cause evaluation. From interviews with the licensee, the rationale for downgrading the issue was that the issue was a historical design problem. The licensee concluded that since the issue was historical and had been a problem for many years, detailed information involving the decision making process for the design would be unobtainable. As a result, the issue was downgraded so that only an apparent cause was required. This rationale appeared to be inadequate, since the downgrading from one Significance Level to a lower one should be based upon the significance of the issue rather than the age of the issue.

Since only an apparent cause evaluation was performed, the amount of documentation in the licensees evaluation was minimal; however, it appeared that many of the Why questions that should have been asked and documented for a full root cause evaluation were discussed verbally by the licensees staff. The licensee asserted that even though the CR had been downgraded to a lower significance level, it was still treated with a heightened significance by assigning a CARB review. From interviews with the licensee, it was apparent that the staff had discussed the causes and corrective actions for the issue in much more depth than that which was documented in the written evaluation. However, this verbal evaluation was much less disciplined than what would have normally been expected for an issue of this nature. Consequently, since a full root cause evaluation was not performed, the evaluation of this issue was not conducted to a level of detail commensurate with the significance of the problem. However, the corrective actions in place were exhaustive and should correct any existing code conformance problems as well as prevent this type of condition from occurring in the future.

c.

Consideration of prior occurrences of the problem and knowledge of prior operating experience The licensees evaluation did not include a search of Condition Reports; however, during this inspection, the licensee performed a CR search using the words fire and code, since the issue involved a code compliance issue in the fire protection area. No prior CRs were found; however, the licensees computer database only contains CRs issued after 1994.

The evaluation did consider operating experience in regard to the corrective actions performed by other plants for similar issues. In the Operating Experience portion of the evaluation, the licensee stated, Plants that did not perform code compliance reviews, like Palisades, perform code compliance reviews when inadequate code compliance issues are identified. The licensee, in their evaluation, asserted their corrective actions were consistent with other plants. since a plant-wide fire protection code conformance review was conducted as a result of this issue.

d.

Consideration of potential common cause(s) and extent of condition of the problem The licensee determined that the apparent cause for this condition stemmed primarily from an insufficient application of engineering judgment during installation of the fire protection modifications for Appendix R in the early 1980s. Appropriately, the licensee concluded that the extent of condition could exist for all fire protection equipment, since a similar use of engineering judgment was used throughout the plant for installation of fire protection modifications during this time frame.

Consequently, a code conformance evaluation/walkdown of all detection equipment was performed as a corrective action for this CR. Eleven areas were found to need upgrades to their detection as a result of this evaluation. Additionally, the licensee concluded that a code compliance review addressing other NFPA codes should be performed since similar design deficiencies were likely to be found in other fire protection equipment. This evaluation was performed just prior to this inspection.

Compensatory measures were put in place as applicable as a result of this comprehensive evaluation.

Future recurrence of this issue should be prevented through the existing Palisades modification process. Checklists are presently in place to flag any Fire Protection/Safe Shutdown related changes so that a qualified review would be performed. This review was required to be performed by two qualified Appendix R engineers.

02.03 Corrective Actions a.

Appropriateness of corrective action(s)

Since only an apparent cause evaluation was performed, the licensees corrective actions only addressed this one cause. The inspector concluded that the corrective actions for this issue were comprehensive.

As an immediate corrective action, the licensee established one hour roving fire watches as compensatory actions for the cable spreading room. This compensatory action is consistent with the licensees Fire Protection Program. As a conservative measure, the licensee also established roving fire watches for all other alternate shutdown areas.

These areas were chosen, because they represented the fire areas with the highest potential risk.

For long term actions, the licensee performed a code compliance review/walkdown for all fire detection system required for Appendix R. This review was completed and documented. As a result, additional areas to the ones already identified by the NRC during the triennial Fire Protection Inspection were found to require upgrades to their detection systems. The licensee established hourly fire watches for the applicable areas as an immediate compensatory measure. Additionally, because of extent of condition concerns, the licensee has performed a code compliance review/walkdown of all fire protection systems used to comply with the plants original fire protection SER and supplements. The licensee has initiated several Condition Reports and has established compensatory measures as appropriate based upon this review.

The final corrective action for the detection of non-compliances were incorporated into the Palisades Fire Detection System Upgrade Plan. This plan included actions to upgrade the high voltage fire detection systems to resolve the identified discrepancies.

Final corrective actions for the other fire protection related non-compliances will be handled under the Palisades Corrective Action process by the associated CRs.

b.

Prioritization of corrective actions The licensee immediately assigned appropriate compensatory measures for both the NRC findings and the self-identified non-compliances. Additionally, the licensee scheduled and performed the corrective actions in a logical manner based upon the risk vulnerability of the plant. For instance, the code conformance review of fire detection features was performed before the code conformance review of all fire protection features, because it was clear from the NRC findings in the triennial FPI that detection was a clear vulnerability at Palisades Nuclear Plant. Additionally, upgrades to the detection in the cable spreading room was scheduled in the Palisades Fire Detection System Upgrade Plan prior to other upgrades based upon the heightened significance of the non-conformance in this area.

c.

Establishment of schedule for implementing and completing the corrective actions.

The corrective actions for the Condition Report associated with this White finding have all been complete with the exception of the corrective action for upgrading the fire detection system in the cable spreading room. This last corrective action was scheduled to be complete by the end of 2002. Additionally, any corrective actions resulting from the code conformance reviews were scheduled for implementation and completion by the Palisades Fire Detection System Upgrade Plan and the Condition Reports associated with any non-conformances. The inspector noted that the schedule associated with the corrective actions was appropriate for the significance of the issues.

d.

Establishment of quantitative or qualitative measures of success for determining the effectiveness of the corrective actions to prevent recurrence No specific effectiveness review was developed for the Condition Report associated with this issue. However, the Corrective Action Process (Procedure No. 3.03, Corrective Action Process) required that a Closeout Review be performed on this Condition Report prior to closeout. One of the questions on the Corrective Action Closeout Review Checklist was Are Corrective Actions adequate? This portion of the Palisades Corrective Action program would serve as a very basic type of effectiveness review.

03 MANAGEMENT MEETINGS

Exit Meeting Summary

On July 25, 2002, the inspector presented the inspection results to Mr. D. J. Malone and other members of licensee management. The licensee acknowledged the issues presented.

The inspector asked the licensee whether any materials examined during the inspection should be considered proprietary. No proprietary information was identified.

KEY POINTS OF CONTACT Licensee M. Carlson, Manager Engineering Programs B. Dotson, Licensing Analyst P. Russell, Manager Performance Improvement R. White, Supervisor Programs and Analysis Engineering NRC R. Krsek, Resident Inspector LIST OF ACRONYMS USED CAQ Condition Adverse to Quality CARB Corrective Action Review Board CFR Code of Federal Regulations CR Condition Report FPI Fire Protection Inspection IMC Inspection Manual Chapter IR Inspection Report NFPA National Fire Protection Association NMC Nuclear Management Company, LLC SER Safety Evaluation Report LIST OF

DOCUMENTS REVIEWED

The following is a list of licensee document reviewed during the inspection. Inclusion on this list

does not imply that NRC inspectors reviewed the documents their entirety, but rather that

selected sections or portions of the documents were evaluated as part of the overall inspection

effort.

Condition Reports Initiated as a Result of Inspection

CPAL0202775 Palisades Corrective Action Process Significance July 24, 2002

Guideline Needs Update

CPAL0202776 Review of AP 3.03 to Determine if Process July 24, 2002

Enhancements are Required for Downgrading a

Condition Report Assignment

CPAL0202808 Containment Fire Detection Does not Meet Code of July 26, 2002

Record

Documents Reviewed During Inspection

CPAL 0102369 Code Compliance of Detectors in Cable Spreading July 14, 2001

Room

CPAL0103289 NRC Triennial Fire Protection Inspection October 15,

Preliminary White Finding 2001

FHA Palisades Plant Fire Hazards Analysis Report Revision 4

FPIP-4 Fire Protection Systems and Fire Protection Revision 16

Equipment

NFPA No. 72E Automatic Fire Detectors 1974

SER NRC SER for Amendment 42 September 1,

1978

Palisades Letter to Response to Staff Request for Additional May 15, 1978

NRC Information on FHA

NRC Letter Letter from NRC to Consumers Power Company June 19, 1978

Requesting Additional Information

Palisades Letter to Response to NRC Fire Protection Positions June 30, 1978

NRC

Palisades Letter to Fire Protection - Exemption Requests and Modified July 20, 1984

NRC Commitments - Revision 2

NRC Letter Exemptions to Section II

I.G of Appendix R July 23, 1985

Proc No 3.03 Corrective Action Process Revision 27

Proc No 3.03 Corrective Action Process Revision 28

Proc No 3.07 10 CFR 50.59 and 72.48 Reviews Revision 13

11