FVY-85-114, Forwards Rev 3 to Updated FSAR for Vermont Yankee,Reflecting Plant Conditions for Past 6 Months

From kanterella
Jump to navigation Jump to search
Forwards Rev 3 to Updated FSAR for Vermont Yankee,Reflecting Plant Conditions for Past 6 Months
ML20137S241
Person / Time
Site: Vermont Yankee Entergy icon.png
Issue date: 11/30/1985
From: Murphy W
VERMONT YANKEE NUCLEAR POWER CORP.
To: Harold Denton
Office of Nuclear Reactor Regulation
Shared Package
ML20137S245 List:
References
FVY-85-114, NUDOCS 8512060196
Download: ML20137S241 (2)


Text

-

VERMONT YANKEE NUCLEAR POWER CORPORATION RD 5. Box 169, Ferry Road, Brattleboro, VT 05301 yh,85-ll4 g

A y ENGINEERING OFFICE 1671 WORCESTER ROAD

  • TELEPHONE 617-812-8100 November 30, 1985 United States Nuclear Regulatory Commission Washington, DC 20555 Attention: Office of Nuclear Reactor Regulation Harold R. Denton, Director

References:

(a) License Nc. DPR-28 (Docket No. 50-271)

(b) Letter, VYNPC to USNRC, FVY 82-84, dated July 20, 1982 (c) Letter, VYNPC to USNRC, FVY 83-77, dated July 20, 1983 (d) Letter, VYNPC to USNRC, FVY 84-55, dated May 30, 1984 (e) Letter, USNRC to VYNPC, NVY 84-197, dated August 21, 1984 (f) Letter, VYNPC to USNRC, FVY 84-140, dated November 30, 1984

Subject:

Vermont Yankee Final Safety Analysis Report (FSAR) - Revision 3

Dear Sir:

Pursuant to 10CFR, Part 50.71(e), enclos3d herewith is one original and 12 copies of Revision 3 of the Vermont Yanke a (VY) FSAR. The updatea pages, identified as Revision 3, reflect plant contitions as of six months prior to the date of this filing (May 31, 1985).

Section 50.71(e) of 10CFR, Part 50, requires the licensees of nuclear power reactors to submit an updated FSAR within 24 months of July 22, 1980 (effective date of regulation) with subsequent revisions no less frequently than annually. The most recent update of the VY FSAR was submitted November 30, 1984, in accordance with NRC's approval [ Reference (e)] for deferral until no later than November 30, 1984, with subsequent updates no less frequently than annually thereafter.

'8512060196 B51130

/h g'J PDR ADOCK 05000271 K PDR

rik M>

United States Nuclear Regulatory Commission November 30, 1985 Attention: Harold R. Denton, Director Page 2 In accordance with the attached instruction sheet, please replace the existing pages of the VY FSAR with the enclosed replacement pages.

Very truly yours, VERMONT YANKEE NUCLEAR POWER CORPORATION

.M" fkw Warren P. Murphy Vice President and M ser of Operations WPM /glw Enclosures STATE OF VERMONT)

)ss WINDHAM COUNTY )

Then personally appeared before me, Warren P. Murphy, who, being duly sworn, did state that he is a Vice President and Manager of Operations of Vermont Yankee Nuclear Power Corporation, that he is duly authorized to execute and file the foregoing document in the name and on the behalf of Vermont Yankee Nuclear Power Corporation and that the statements therein are true to the best of his knowledge and belief.

> YN 0.

Diane McCue Notary Public MyCommissionExpire/ s a

m