TSTF-22-07, Transmittal of TSTF-592, Revision 0, Revise Automatic Depressurization System (ADS) Instrumentation Requirements | 19 July 2022 | Transmittal of TSTF-592, Revision 0, Revise Automatic Depressurization System (ADS) Instrumentation Requirements | Reactor Vessel Water Level |
TSTF-22-06, Technical Specifications Task Force - Request for a Workshop to Discuss the Interaction of Natural Phenomena Protection Design Features and Operability | 8 July 2022 | Technical Specifications Task Force - Request for a Workshop to Discuss the Interaction of Natural Phenomena Protection Design Features and Operability | Safe Shutdown High winds Anticipated operational occurrence Tornado Missile Safe Shutdown Earthquake Probabilistic Risk Assessment Tornado-Generated Missile Tornado Generated Missile Fukushima Dai-Ichi Tornado Missile Protection Earthquake |
TSTF-22-04, Technical Specifications Task Force - Transmittal of TSTF-591, Revision 0, Revise Risk Informed Completion Time (RICT) Program | 22 March 2022 | Technical Specifications Task Force - Transmittal of TSTF-591, Revision 0, Revise Risk Informed Completion Time (RICT) Program | Post Accident Monitoring Probabilistic Risk Assessment Pressure and Temperature Limits Report Affidavit |
TSTF-21-03, TSTF Response to NRC Questions on TSTF-576, Revision 0, Revise Safety/Relief Valve Requirements and Submittal of Revision 1 | 23 June 2021 | TSTF Response to NRC Questions on TSTF-576, Revision 0, Revise Safety/Relief Valve Requirements and Submittal of Revision 1 | Unanalyzed Condition Reactor Vessel Water Level Stroke time Anticipated operational occurrence Water Inventory Control Hydrostatic Past operability Surveillance Frequency Control Program Foreign Material Exclusion Maintenance Rule Program Fuel cladding |
TSTF-21-01, Transmittal of TSTF-580, Revision 1, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling | 26 January 2021 | Transmittal of TSTF-580, Revision 1, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling | Ultimate heat sink Water Inventory Control Surveillance Frequency Control Program |
TSTF-20-04, Technical Specifications Task Force - Transmittal of TSTF-577, Revision 0, Revised Frequencies for Steam Generator Tube Inspections | 8 June 2020 | Technical Specifications Task Force - Transmittal of TSTF-577, Revision 0, Revised Frequencies for Steam Generator Tube Inspections | Non-Destructive Examination Post Accident Monitoring Nondestructive Examination Pressure and Temperature Limits Report |
TSTF-20-01, Transmittal of TSTF-IG-20-02, Guidance on Evaluating One-Time Surveillance Frequency Changes Under the Surveillance Frequency Control Program (TSTF-425M SFCP) | 9 April 2020 | Transmittal of TSTF-IG-20-02, Guidance on Evaluating One-Time Surveillance Frequency Changes Under the Surveillance Frequency Control Program (TSTF-425M SFCP) | Probabilistic Risk Assessment Missed surveillance Significance Determination Process Surveillance Frequency Control Program Large early release frequency Pandemic |
TSTF-19-14, Technical Specifications Task Force - TSTF Response to NRC Questions on TSTF-582, RPV WIC Enhancements | 12 February 2020 | Technical Specifications Task Force - TSTF Response to NRC Questions on TSTF-582, RPV WIC Enhancements | Water Inventory Control |
TSTF-19-11, TSTF Response to NRC Questions on TSTF-554, Revise Reactor Coolant Leakage Requirements | 16 January 2020 | TSTF Response to NRC Questions on TSTF-554, Revise Reactor Coolant Leakage Requirements | Boric Acid Surveillance Frequency Control Program Pressure Boundary Leakage Pressure boundary leak |
TSTF-19-09, Technical Specifications Task Force - Transmittal of TSTF-576, Revision 0, Revise Safety/Relief Valve Requirements | 13 December 2019 | Technical Specifications Task Force - Transmittal of TSTF-576, Revision 0, Revise Safety/Relief Valve Requirements | Anticipated operational occurrence Surveillance Frequency Control Program |
TSTF-19-13, Technical Specifications Task Force - Updated TSTF Membership and Distribution | 3 December 2019 | Technical Specifications Task Force - Updated TSTF Membership and Distribution | |
TSTF-19-12, TSTF Comments on Draft Safety Evaluations for Traveler TSTF-541, Revision 2, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position. | 5 November 2019 | TSTF Comments on Draft Safety Evaluations for Traveler TSTF-541, Revision 2, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position. | Safe Shutdown Ultimate heat sink Anticipated operational occurrence |
TSTF-19-10, Transmittal of Errata Changes to TSTF-541, Revision 2, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position | 28 August 2019 | Transmittal of Errata Changes to TSTF-541, Revision 2, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position | Ultimate heat sink Anticipated operational occurrence Water Inventory Control Surveillance Frequency Control Program |
TSTF-19-03, Request for Fee Exemption for TSTF-554, Revision 0, Revise Reactor Coolant Leakage Requirements - Letter | 8 July 2019 | Request for Fee Exemption for TSTF-554, Revision 0, Revise Reactor Coolant Leakage Requirements - Letter | Exemption Request |
TSTF-19-08, Draft of Traveler TSTF-582, Revision 0, RPV WIC Enhancements. | 3 July 2019 | Draft of Traveler TSTF-582, Revision 0, RPV WIC Enhancements. | Reactor Vessel Water Level High Radiation Area Stroke time Water Inventory Control Operating Basis Earthquake Surveillance Frequency Control Program Earthquake Control of Heavy Loads Power Operated Valves Fuel cladding Offsite Circuit Scaffolding Affidavit |
TSTF-19-06, TSTF Comments on Draft Safety Evaluations for Traveler TSTF-569, Revision 1, Revise Response Time Testing Definition | 25 June 2019 | TSTF Comments on Draft Safety Evaluations for Traveler TSTF-569, Revision 1, Revise Response Time Testing Definition | Shutdown Margin Anticipated operational occurrence Probabilistic Risk Assessment Surveillance Frequency Control Program Pressure Boundary Leakage |
TSTF-19-07, TSTF Handout for October 16, 2019, Meeting: Elimination of Commitment to Adopt TSTF-493 | 18 June 2019 | TSTF Handout for October 16, 2019, Meeting: Elimination of Commitment to Adopt TSTF-493 | Backfit |
TSTF-19-05, Transmittal of TSTF-541, Revision 2, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position | 18 June 2019 | Transmittal of TSTF-541, Revision 2, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position | Ultimate heat sink Water Inventory Control Surveillance Frequency Control Program |
TSTF-19-01, TSTF Comments on Draft Safety Evaluations for Traveler TSTF-566, Revision 0, Revise Actions for Inoperable RHR Shutdown Cooling Subsystems | 17 January 2019 | TSTF Comments on Draft Safety Evaluations for Traveler TSTF-566, Revision 0, Revise Actions for Inoperable RHR Shutdown Cooling Subsystems | |
TSTF-18-13, TSTF Comments on Draft Safety Evaluation for Traveler TSTF-557, Revision 1, Spent Fuel Storage Rack Neutron Absorber Monitoring Program. | 20 December 2018 | TSTF Comments on Draft Safety Evaluation for Traveler TSTF-557, Revision 1, Spent Fuel Storage Rack Neutron Absorber Monitoring Program. | |
TSTF-18-06, TSTF Response to NRC Questions on TSTF-569, Revise Response Time Testing Definition | 31 October 2018 | TSTF Response to NRC Questions on TSTF-569, Revise Response Time Testing Definition | Shutdown Margin Anticipated operational occurrence Probabilistic Risk Assessment Surveillance Frequency Control Program Pressure Boundary Leakage |
TSTF-18-12, TSTF Comments on Draft Safety Evaluation for Traveler TSTF-564, Revision 1, Safety Limit MCPR | 24 October 2018 | TSTF Comments on Draft Safety Evaluation for Traveler TSTF-564, Revision 1, Safety Limit MCPR | Reactor Vessel Water Level Anticipated operational occurrence Hydrostatic Pressure and Temperature Limits Report Surveillance Frequency Control Program Minimum Critical Power Ratio Fuel cladding |
TSTF-18-11, TSTF Comments on Draft Safety Evaluation for Traveler TSTF-563, Revision 0, Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control Program. | 12 October 2018 | TSTF Comments on Draft Safety Evaluation for Traveler TSTF-563, Revision 0, Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control Program. | Probabilistic Risk Assessment Surveillance Frequency Control Program Large early release frequency |
TSTF-18-08, Updated TSTF Membership and Distribution | 17 July 2018 | Updated TSTF Membership and Distribution | |
TSTF-18-07, TSTF Comments on Draft Safety Evaluation for Traveler TSTF-505, Provide Risk-Informed Extended Completion Times and Submittal of TSTF-505, Revision 2 | 2 July 2018 | TSTF Comments on Draft Safety Evaluation for Traveler TSTF-505, Provide Risk-Informed Extended Completion Times and Submittal of TSTF-505, Revision 2 | |
TSTF-18-05, TSTF Response to NRC Questions on TSTF-564, Safety Limit (Minimum Critical Power Ratio) MCPR | 29 May 2018 | TSTF Response to NRC Questions on TSTF-564, Safety Limit (Minimum Critical Power Ratio) MCPR | Reactor Vessel Water Level Anticipated operational occurrence Hydrostatic Pressure and Temperature Limits Report Surveillance Frequency Control Program Minimum Critical Power Ratio Fuel cladding |
TSTF-17-19, TSTF Response to NRC Questions on TSTF-563, Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control Program | 27 April 2018 | TSTF Response to NRC Questions on TSTF-563, Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control Program | Probabilistic Risk Assessment Surveillance Frequency Control Program Large early release frequency |
TSTF-18-04, TSTF Comments on Draft Safety Evaluation for Traveler TSTF-567, Revision 1, Add Containment Sump TS to Address GSI-191 Issues. | 16 April 2018 | TSTF Comments on Draft Safety Evaluation for Traveler TSTF-567, Revision 1, Add Containment Sump TS to Address GSI-191 Issues. | Surveillance Frequency Control Program |
TSTF-18-03, Transmittal of TSTF-565, Revision 1, Revise the LCO 3.0.2 and LCO 3.0.3 Bases | 30 March 2018 | Transmittal of TSTF-565, Revision 1, Revise the LCO 3.0.2 and LCO 3.0.3 Bases | Safe Shutdown Missed surveillance |
TSTF-18-02, Technical Specifications Task Force - Transmittal of TSTF-569, Revision 0, Revise Response Time Testing Definition. | 8 February 2018 | Technical Specifications Task Force - Transmittal of TSTF-569, Revision 0, Revise Response Time Testing Definition. | Shutdown Margin Anticipated operational occurrence Probabilistic Risk Assessment Surveillance Frequency Control Program Pressure Boundary Leakage |
TSTF-17-18, Transmittal of TSTF-566, Revision 0, Revise Actions for Inoperable RHR Shutdown Cooling Subsystems. | 19 January 2018 | Transmittal of TSTF-566, Revision 0, Revise Actions for Inoperable RHR Shutdown Cooling Subsystems. | Surveillance Frequency Control Program |
TSTF-18-01, Technical Specifications Task Force - Change in TSTF Traveler Invoicing | 12 January 2018 | Technical Specifications Task Force - Change in TSTF Traveler Invoicing | |
TSTF-17-17, Transmittal of TSTF-557, Revision 1, Spent Fuel Storage Rack Neutron Absorber Monitoring Program | 19 December 2017 | Transmittal of TSTF-557, Revision 1, Spent Fuel Storage Rack Neutron Absorber Monitoring Program | Surveillance Frequency Control Program |
TSTF-17-16, Technical Specifications Task Force - Transmittal of TSTF-568, Clarify Applicability of BWR/4 TS 3.6.2.5 and TS 3.6.3.2 | 19 December 2017 | Technical Specifications Task Force - Transmittal of TSTF-568, Clarify Applicability of BWR/4 TS 3.6.2.5 and TS 3.6.3.2 | Surveillance Frequency Control Program |
TSTF-17-13, Technical Specifications Task Force - Updated TSTF Membership and Distribution | 30 October 2017 | Technical Specifications Task Force - Updated TSTF Membership and Distribution | |
TSTF-17-12, Technical Specifications Task Force - Transmittal of TSTF-564, Safety Limit Mcpr. | 28 August 2017 | Technical Specifications Task Force - Transmittal of TSTF-564, Safety Limit Mcpr. | Reactor Vessel Water Level Anticipated operational occurrence Hydrostatic Pressure and Temperature Limits Report Surveillance Frequency Control Program Minimum Critical Power Ratio Fuel cladding |
TSTF-17-10, TSTF Comments on Draft Safety Evaluation for Traveler TSTF-551, Revision 3, Revise Secondary Containment Surveillance Requirements. | 2 August 2017 | TSTF Comments on Draft Safety Evaluation for Traveler TSTF-551, Revision 3, Revise Secondary Containment Surveillance Requirements. | Water Inventory Control |
TSTF-17-09, TSTF Comments on Draft Safety Evaluation for Traveler TSTF-546, Revision 0, Revise APRM Channel Adjustment Surveillance Requirement. | 24 July 2017 | TSTF Comments on Draft Safety Evaluation for Traveler TSTF-546, Revision 0, Revise APRM Channel Adjustment Surveillance Requirement. | Fuel cladding Power change |
TSTF-17-08, Change in TSTF Traveler Invoicing | 5 July 2017 | Change in TSTF Traveler Invoicing | Surveillance Frequency Control Program |
TSTF-17-07, Transmittal of TSTF-563, Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control Program | 10 May 2017 | Transmittal of TSTF-563, Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control Program | Anticipated operational occurrence Probabilistic Risk Assessment Surveillance Frequency Control Program |
TSTF-17-06, Request to Incorporate TSTF-565, Clarify the Term Operational Convenience in the LCO 3.0.2 Bases, Into the Standard Technical Specifications | 9 May 2017 | Request to Incorporate TSTF-565, Clarify the Term Operational Convenience in the LCO 3.0.2 Bases, Into the Standard Technical Specifications | Safe Shutdown |
TSTF-17-03, Technical Specifications Task Force - Request for Fee Exemption for TSTF-567, Add Containment Sump TS to Address GSI-191 Issues. | 30 March 2017 | Technical Specifications Task Force - Request for Fee Exemption for TSTF-567, Add Containment Sump TS to Address GSI-191 Issues. | |
TSTF-17-04, Technical Specifications Task Force - Transmittal of TSTF-567, Add Containment Sump TS to Address GSI-191 Issues. | 30 March 2017 | Technical Specifications Task Force - Transmittal of TSTF-567, Add Containment Sump TS to Address GSI-191 Issues. | Boric Acid Ultimate heat sink Coatings Surveillance Frequency Control Program Fuel cladding |
TSTF-17-05, Technical Specifications Task Force (TSTF) - Updated TSTF Membership and Distribution | 23 February 2017 | Technical Specifications Task Force (TSTF) - Updated TSTF Membership and Distribution | |
TSTF-16-11, Response to NRC Request for Additional Information Regarding TSTF-546, Revision 0, Revise APRM Channel Adjustment Surveillance Requirement. | 2 February 2017 | Response to NRC Request for Additional Information Regarding TSTF-546, Revision 0, Revise APRM Channel Adjustment Surveillance Requirement. | |
TSTF-17-02, Technical Specifications Task Force - Request for NRC to Withdraw November 7, 2013 Letter to TSTF Concerning TSTF-51, TSTF-286, and TSTF-471 | 2 February 2017 | Technical Specifications Task Force - Request for NRC to Withdraw November 7, 2013 Letter to TSTF Concerning TSTF-51, TSTF-286, and TSTF-471 | |
TSTF-17-01, TSTF Draft Response to NRC Questions on TSTF-505, Provide Risk-Informed Extended Completion Times for 02/16/2017 Public Meeting | 31 January 2017 | TSTF Draft Response to NRC Questions on TSTF-505, Provide Risk-Informed Extended Completion Times for 02/16/2017 Public Meeting | Maintenance Rule Program Offsite Circuit |
TSTF-16-12, Technical Specifications Task Force - Updated TSTF Membership and Distribution | 18 November 2016 | Technical Specifications Task Force - Updated TSTF Membership and Distribution | |
TSTF-16-10, TSTF Comments on Draft Safety Evaluation for Traveler TSTF-542, Revision 2, Reactor Pressure Vessel Water Inventory Control, and Transmittal of Editorial Corrections to TSTF-542, Revision 2 | 2 November 2016 | TSTF Comments on Draft Safety Evaluation for Traveler TSTF-542, Revision 2, Reactor Pressure Vessel Water Inventory Control, and Transmittal of Editorial Corrections to TSTF-542, Revision 2 | Reactor Vessel Water Level Water Inventory Control Hydrostatic Surveillance Frequency Control Program Fuel cladding Offsite Circuit |
TSTF-16-08, Withdrawal of TSTF-553, Revision 0, Add Action for Two Inoperable Creatcs Trains. | 13 October 2016 | Withdrawal of TSTF-553, Revision 0, Add Action for Two Inoperable Creatcs Trains. | |