BSEP-89-0766, Special Rept 2-SR-89-003:on 890731,fire Barrier Limiting Condition for Operation Initiated for Door 301 to Permit Frame & Door Replacement to Correct Misalignment & Sticking Problem.Time Frame Exceeded.Restoration Expected by 890908

From kanterella
(Redirected from BSEP-89-0766)
Jump to navigation Jump to search
Special Rept 2-SR-89-003:on 890731,fire Barrier Limiting Condition for Operation Initiated for Door 301 to Permit Frame & Door Replacement to Correct Misalignment & Sticking Problem.Time Frame Exceeded.Restoration Expected by 890908
ML20246A561
Person / Time
Site: Brunswick Duke Energy icon.png
Issue date: 08/15/1989
From: Harness J
CAROLINA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
2-SR-89-003, 2-SR-89-3, BSEP-89-0766, BSEP-89-766, NUDOCS 8908230015
Download: ML20246A561 (1)


Text

_

g,gL Carolina Power & LigM Company Brunswick Nuclear Project P.'O. Box 10429-r > Southport,.NC 28461-0429 Augu st - 15, 1989 FILE: B09-13510C' SERIAL: BSEP/89-0766

. U.S. Nuclear Regulatory Commission

- ATTN: ' Document Control' Desk

.- Warhington,.DC 20555 BRUNSWICK STEAM ELECTRIC PLANT UNIT 2 DOCKET NO. 50-324 LICENSE NO. DPR-62 SPECIAL REPORT PER TECHNICAL SPECIFICATION'3.7.8 AND PURSUANT TO TECHNICAL SPECIFICATION 6.9.2 (2-SR-89-003)

Gentlemen:

During Unit 2 power operation, a Unit 2 fire barrier Limiting Condition for Operation-(LCO)-was initiated, at 1200 hours0.0139 days <br />0.333 hours <br />0.00198 weeks <br />4.566e-4 months <br />' July 31, 1989,'- for fire door no; 301, located.at penetration seal no. R2-3-007, the inner door of the Reactor Building 50' elevation southwest personnel. airlock. The LCO was

. initiated to permit replacement of the door and door frame in order to correct a misalignment and sticking problem which hampers operation of the door. Due to the scope.of the involved work, the seven-day time frame of the LCO was exceeded'on August 7, 1989. Restoration of the door to functional status is

- expected by September 8, 1989. Until cancellation of the LCO, required fire watches w111' remain in effect.

Very truly yours, I

pt J. L. Harness, General Manager Brunswick Nuclear Project MJP/ meg.

- Enclosure.

I cc: Mr. S. D. Ebneter Mr. E. G. Tourigny ESEP NRC Resident Office f

V O 24 PDC /[I p i L.; ..  ;