BSEP-86-1677, Special Rept 1-SR-86-004:on 861102,fire Barrier Limiting Condition for Operation (LCO) Initiated on Penetration Seal CB-2-301,Fire Door 221.On 861109,7-day Time Frame Exceeded. Repairs to Air Conditioning Unit Made & LCO Canceled

From kanterella
Jump to navigation Jump to search
Special Rept 1-SR-86-004:on 861102,fire Barrier Limiting Condition for Operation (LCO) Initiated on Penetration Seal CB-2-301,Fire Door 221.On 861109,7-day Time Frame Exceeded. Repairs to Air Conditioning Unit Made & LCO Canceled
ML20215F418
Person / Time
Site: Brunswick Duke Energy icon.png
Issue date: 12/09/1986
From: Dietz C
CAROLINA POWER & LIGHT CO.
To: Grace J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
1-SR-86-004, 1-SR-86-4, BSEP-86-1677, NUDOCS 8612230390
Download: ML20215F418 (1)


Text

b40 CD&L Carolina Power & Light Company 38 DEC 16 All: 50 Brunswick Steam Electric Plant P. O. Box 10429 Southport, NC 28461-0429 December 9, 1986 FILE: B09-13510C SERIAL: BSEP/86-1677 Dr. J. Nelson Grace, Administrator U.S. Nuclear Regulatory Commission Suite 2900 101 Marietta Street hV Atlanta, GA 30323 BRUNSWICK STEAM ELECTRIC PLANT UNIT 1 DOCKET NO. 50-325 LICENSE NO. DPR-71 SPECIAL REPORT PER TECHNICAL SPECIFICATION 3.7.8 AND PURSUANT TO TECHNICAL SPECIFICATION 6.9.2 (1-SR-86-004)

Dear Dr. Grace:

On November 2, 1986, at 1000 hours0.0116 days <br />0.278 hours <br />0.00165 weeks <br />3.805e-4 months <br />, a Unit I fire barrier LCO was initiated on penetration seal No. CB-2-301, fire door 221. This door, which is located on the 49-foot elevation of the Unit 1 Control Building, provides personnel access to the Unit 1 computer room from the Control Room. The LCO was initiated to permit opening the door to allow ambient air circulation between the computer room and the Unit 1 Control Room electronic equipment area due to the inoperability of the computer room air-conditioning unit. On November 9, 1986, at 1000 hours0.0116 days <br />0.278 hours <br />0.00165 weeks <br />3.805e-4 months <br />, the specified seven-day time frame of the involved LCO was exceeded. Repairs to the subject air-conditioning unit were made and on November 11, 1986, at 0830 hours0.00961 days <br />0.231 hours <br />0.00137 weeks <br />3.15815e-4 months <br />, the LCO was canceled and door 221 was returned to service.

Very truly yours, C. R. Dietz, General Manager Brunswick Steam Electric Plant MJP/mbh Enclosure cc: NRC Document Control Desk 8612230390 861209 PDR ADOCK 05000325 S PDR [

I

[W#