BSEP-86-0453, Special Rept 1-SR-86-003:on 860314,7-day Time Frame for Limiting Condition of Operation for Two Potentially Inoperable Fire Doors Exceeded.Doors Subj to Excessive Differential Pressure Conditions.Part 21 Related

From kanterella
Jump to navigation Jump to search
Special Rept 1-SR-86-003:on 860314,7-day Time Frame for Limiting Condition of Operation for Two Potentially Inoperable Fire Doors Exceeded.Doors Subj to Excessive Differential Pressure Conditions.Part 21 Related
ML20205M166
Person / Time
Site: Brunswick Duke Energy icon.png
Issue date: 04/07/1986
From: Dietz C
CAROLINA POWER & LIGHT CO.
To: Grace J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
REF-PT21-86-131-000 1-DR-86-3, 1-SR-86-003, 1-SR-86-3, BSEP-86-0453, BSEP-86-453, PT21-86-131, PT21-86-131-000, NUDOCS 8604150113
Download: ML20205M166 (1)


Text

CP&L Carolina Power & Ught Company Brunswick St_e%Eled) rig gl,ay g P. O. Box l'0429 Southport, NC 28461-0429 April 7, 1986 FILE: B09-13510C SERIAL: BSEP/86-0453 Dr. J. Nelson Grace, Administrator U.S. Nuclear Regulatory Commission Suite 2900 101 Marietta Street hV Atlanta, GA 30323 BRUNSWICK STEAM ELECTRIC PLANT UNIT 1 DOCKET NO. 50-325 LICENSE NO. DPR-71 SPECIAL REPORT PER TECHNICAL SPECIFICATION 3.7.8 AND PURSUANT TO TECHNICAL SPECIFICATION 6.9.2 (1-SR-86-003)

Dear Dr. Grace:

During Unit 1 power operation concurrent with a refueling / maintenance outage on Unit 2, two Unit 1 designated fire barrier LCO. were initiated on March 7, 1986, to streamline administrative handling of previously identified and potentially inoperable fire doors of the units' common Diesel Generator Building. The subject fire doors are susceptible to intermittently occurring excessive differential pressure conditions which adversely affect closing capability of the doors. The specified seven-day time frame of the involved LCOs was exceeded on March 14, 1986. Until the excessive differential pressure problem is resolved, the involved LCOs, with appropriately stationed fire watches, will be maintained.

Very truly yours, b.

C. R. Dietz, General Manager i Brunswick Steam Electric Plant j l

RMP/mbh 1 l

Enclosure l I

cc: NRC Document Control Desk

~

8604150113 860407 PDR ADOCK 05000325 S PDR. .

__