BSEP-84-1535, Special Rept:On 840521,diesel Driven Fire Pump Rendered Inoperable Due to Decrease in Diesel Closed Cooling Water Expansion Tank Level.Caused by Leaking Tubes in HX Tube Bundle.Hx Tube Bundle Replaced

From kanterella
Jump to navigation Jump to search
Special Rept:On 840521,diesel Driven Fire Pump Rendered Inoperable Due to Decrease in Diesel Closed Cooling Water Expansion Tank Level.Caused by Leaking Tubes in HX Tube Bundle.Hx Tube Bundle Replaced
ML20092M941
Person / Time
Site: Brunswick Duke Energy icon.png
Issue date: 06/25/1984
From: Dietz C
CAROLINA POWER & LIGHT CO.
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
BSEP-84-1535, NUDOCS 8407020424
Download: ML20092M941 (1)


Text

cpai.n Carolina ,Pg & L$ght Company BrunswickSteamElectricPlant P. O. Box 10429 Southport, NC 28461-0429 FILE: -B09-13510C SERIAL: BSEP/84-1535 Mr. James P. 0'Reilly, Director U. S. Nuclear Regulatory Commission Suite'2900 101 Marietta Street, NW Atlanta, GA- 30323 BRUNSWICK STEAM ELECTRIC PLANT UNIT 1 DOCKET NO. 50-325 LICENSE NO. DPR-62 SPECIAL REPORT PER TECHNICAL SPECIFICATION 3.7.7.1 AND PURSUANT TO TECHNICAL SPECIFICATION 6.9.2 (1-SR-84-2)

Dear Mr. O'Reilly:

On May-21, 1984, while performing the weekly operability test of the Fire Suppression Water System, PT-35.1, the diesel. driven fire pump was rendered inoperable due to'a decrease in the diesel closed cooling water expansion tank level. ;This was caused by leaking tubes in the heat exchanger tube bundle. A new heat exchanger tube bundle had to be ordered, thereby, causing the seven-day time frame of the involved LCO on the diesel driven fire pump to be exceeded. The new heat exchanger. tube bundle was placed into the heat exchanger. After a test run of the diesel indicated that the water level was stable, the diesel driven fire pump was returned to service on June 2, 1984.

Brunswick has a contingency plan for loss of redundancy in the Fire

Suppression System which includes a daily channel check of the fire

- suppression tank, verification of operability of the alternate pump, and an agreement with the City of Southport to provide backup fire suppression equipment.

Very truly yours, C. R. Dietz, General Manager Brunswick Steam Electric Plant MTA/ddr/LETDD1 cc: Mr. R. C. DeYoung NRC Document Control Desk 8