Special Rept 2-SR-84-7:on 840511,limiting Condition for Operation Initiated for Fire Doors 203,301 & 303 to Allow Opening to Reduce Wear & Possible Damage from outage-related traffic.Seven-day Limit Exceeded.Fire Watches Maintained
ML20197H664
Person / Time
Site: Brunswick Duke Energy icon.png
Issue date: 06/05/1984
From: Dietz C
CAROLINA POWER & LIGHT CO.
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
2-SR-84-7, 2-SR-84-7-1, BSEP-84-1441, NUDOCS 8406190108
Download: ML20197H664 (1)


Text

CD&L Cagohna

  • __yP__

gwer_ & Light Company

{} b _ _ ~ - _ __ _

Trunswick Steam Electric Plant P. O. Box 10429 Southport, NC 284d1-0429 FILE: B09-13510C SERIAL: BSEP/84-1441 Mr. James P. O'Reilly, Director U.S. Nuclear Regulatory Commission Region II, Suite 3100 101 Marietta Street N.W.

Atlanta, GA 30303 BRUNSWICK STEAM ELECTRIC PLANT UNIT 2 DOCKET NO. 50-324 LICENSE NO. DPR-62 SPECIAL REPORT PER TECHNICAL SPECIFICATION 3.7.8 AND PURSUANT TO TECHNICAL SPECIFICATION 6.9.2 (2-SR-84-7)

Dear Mr. O'Reilly:

During an ongoing Unit 2 refueling / maintenance outage, a Unit 2 fire barrier LCO was initiated on May 11, 1984, for three fire doors in the Unit 2 Reactor Building. Two of the doors, Nos. 301 and 303, are located on the 50-foot elevation of the building while the remaining door, No. 203, is 1ccated en the 20-foot elevation of the building. These doors, respectively, provide personnel access to the Reactor Building from the roof area of the Unit 2 Turbine Building and the Unit 2 Reactor Building-Turbine Building hallway.

The subject LCO was initiated to permit opening the involved doors to help prevent wear and possible damage to the doors' locking mechanisms, seals, and interlocks resulting from outage-related traffic. On May 18, 1984, the seven-day specified time frame of the subject LCO was exceeded.

The doors will be shut and their interlocks restored when Unit 2 secondary containment is required. Until return of the involved doors to service, appropriate stationed fire watches will be maintained.

Very truly yours, dig C. R. Dietz, General Manager Brunswick Steam Electric Plant MJP/shb/LETSBl cc: Mr. R. C. DeYoung NRC Document Control Desk g cO 8406190108 840605 PDR ADOCK 03000324 4,%,*4'

~