Forwards Response to Open Items Identified During 860508 Meeting Re Proposed Rev to Pump & Valve Inservice Testing Program.Rev IWV-1 Table for Valve Testing Program, Description of ECCS Full Flow Test & Insp Procedure Encl
ML20210C485
Person / Time
Site: Haddam Neck File:Connecticut Yankee Atomic Power Co icon.png
Issue date: 02/04/1987
From: Mroczka E
CONNECTICUT YANKEE ATOMIC POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20210C488 List:
References
A05946, A5946, NUDOCS 8702090398
Download: ML20210C485 (84)


Text

4 G

CONNECTICUT YANKEE ATOMIC POWER COMPANY B E R L I N, CONNECTICUT P o BOX 270 HARTFORD, CONNECTICUT 06141-0270 TELEPHONE 203-665-5000 February 4,1987 Docket No. 50-213 A05946 Re: 10CFR50.55a(g)

U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D.C. 20555

Reference:

(1) F. M. Akstulewicz letter to 3. F. Opeka, Meeting Minutes on the May 8,1986 Pump and Valve Inservice Testing Program, dated August 8,1986.

Gentlemen:

Haddam Neck Plant response to Open items Identified During the May 8,1986 Meeting on a Proposed Revision to the Inservice Testing Program (IST)

This letter is being forwarded in response to Reference (1) which documented the results of a working meeting held on May 8,1986 between the Connecticut Yankee Atomic Power Company (CYAPCO) and NRC representatives to discuss questions resulting from the review of a proposed revision to the Haddam Neck pump and valve inservice testing program.(1)(2) The meeting minutes, as documented in Reference (1), identified 11 remaining open items. Subsequent telephone calls, held on May 13 and 14,1986, resolved 5 of the open items. This is documented in Enclosure 2 to Reference (1). Additionally, questions not formally documented, but handed out during the course of the May 8,1986 meeting were discussed during these telephone conversations. Again, Enclosure 2 to Reference (1) documented these results and showed all but one of these concerns were resolved.

Attachment 1 is being provided in response to the remaining open items identified in Enclosures 1 and 2 of Reference (1). Items agreed upon as closed have been restated while all remaining open items are addressed by reidentifying the original open item and providing a response.

(1) The W. G. Counsil letter to D. M. Crutchfield, dated April 9,1984, requested revisions to the inservice testing program to incorporate the requirements of the 1980 edition of Section XI of the ASME code.

(2) The F. M. Akstulewicz letter to 3. F. Opeka, dated March 5,1986, I

requested additional information on the proposed revision and these questions established the May 8,1986 meeting agenda.

8702090398 I870204 PDR ADOCK 05000213 Aod g(

P PDR t

y a

e Attachment 2 provides a revised IWV-1 Table for the Haddam Neck Plant valve testing program. This table reflects responses to Staff questions. Also, included within this table are revisions not previously discussed. These revisions are noted by a change bar in the right hand column of the table.

Attachment 3 forwards a description of the ECCS full flow test. This attachment is referenced in our response to item 6.0 as documented in

' Attachment 1.

Attachment 4 forwards a copy of the inspection procedure for RH-CV-803A and RH-CV-783. This attachment is referenced in our response to Item 15.0 as documented in Attachment 1.

Should you have any further questions on our proposed update to the IST program, please contact our Licensing representatives directly.

Very truly yours, CONNECTICUT YANKEE ATOMIC POWER COMPANY E. 3. k (/

Senior)foc~zka Vice President cc: T. E. Murley, Region I Administrator P. Swetland, Resident Inspector, Haddam Neck Plant F. M. Akstulewicz, NRC Project Manager, Haddam Neck Plant

r Attachment 1 Response to Requests for Additional Information on Proposed Revisions to the IST Program February 1987 j

ATTACHMENTI Response to Requests for AdditionalInformation 1.0 Item Closed 2.0 Item Closed 3.0 Open Item for Licensee: Determine testing program for EDG Auxiliary System Pumps upon receipt of NRC letter.

Response An NRC letter, Reference 1, has been received by the Licensee. As discussed, we will submit the ISI program for the EDG Auxiliary System as part of the ISI/IST 10-year update. This is scheduled for July 1,1987.

4.0 The following items are typographical errors. Licensee response to the following was satisfactory.

a. As listed on Page 1 of the IST submittal, should PRS 0V0522A be PR-SOV-522a?

Response: Our previous response was incorrect. Further review has identified the correct valve number to be PR-SOV-552A. The ISI has been corrected.

b. Item closed.
c. Item closed.
d. Item closed.
c. Item closed.
f. Item closed.
g. Item closed.
h. Item closed.
1. Item closed.

Y

j. Item closed

! k. Item closed.

1. Item closed
m. Item closed.

l t

1

n. Item closed,
o. Item closed,
p. Item closed.
q. Item closed.
r. Item closed.
s. Item closed,
t. Item closed.

5.0 Item closed. It should be noted that PR-SOV-522A, B, C, and D are PR-SOV-552A, B, C, and D.

6.0 (Enclosure I to Reference (2))

Provide a more technical justification for not full stroke exercising valve SI-CV-103,107A & B, and SI-CV-872A & B in accordance with the code specified frequency (with the maximum time interval being two years).

Response

Connecticut Yankee will full stroke exercise these valves each refueling at less than full flow and once every five years at full flow. (Item remained open as documented in Enclosure 2 to Reference (2).)

(Enclosure 2 to Reference (2))

The Licensee would like to perform a full flow test once every 5 years.

Development of pump curves would be used to demonstrate operability of valves in question at less than full flow. It was agreed that a written description and technical evaluation will be provided to the NRC for their review.

Response

Technically this was found acceptable.

Each pump is designed to pump flow against a specific resistance which is called the pump design point. Any change in system resistance (pipe friction or valve position) would cause a change in pump head and flow, as defined by the pump curve.

6 I

h 2.

O e

Lu "I

FLOG fi e e. 1 Point 1 in the above Fig. I represents a valve position near its closed position. If a check valve failed to open, the increased system resistance would produce a high pump head. Point 2 in the above Fig.1, represents a valve position near its fully open position. If a check valve functioned properly, there would be very little increase in system resistance and therefore a lower pump head would be produced. By increasing the pump head, we can determine pump flow and verify valve operability.

Every five years we will develop the pump curve shown in Figure 1, and evaluate it per its design point.

Each system would be lined up to inject water into the Reactor Vessel.

One pump will be started from each system, taking water from the RWST and passing through its correspondent check valve and piping into the vessel. The discharge valve of each pump will be open until the pump head, (which will be calculated based on the discharge and suction pressure),

corresponds to a desired flow based on the pump curve developed during the five year system test. The reactor vessel head is vented to the pressure relief tank by removing one of the code safeties and adding a spool piece connecting the piping. The pressurizer will be filled and drained several times during this test. The level in the pressurizer will not exceed 90% level. A copy of the system flow test and procedure is included as Attachment 3 to this submittal.

7.0 item closed.

8.0 Item closed.

9.0 Item closed.

! 10.0 Item closed.

11.0 Item closed.

{

y' 12.0 Item closed.

13.0 Item closed.

14.0 Item closed.

15.0 Open Item for the Licensee:

The staff normally accepts no relief request from frequencies greater than 2 years. The Licensee should investigate alternate means of -

complying with the Code specified frequency including design changes, alternate flow paths to maintain decay heat removal, including necessary Technical Specification changes.

Response

The Licensee concluded that design changes or Technical Specification changes to mect the IST program are not warranted.

Alternate means of testing were reviewed. However, no alternate means were found acceptable.

The Licensee concluded that its recommendation per Reference 2, is an acceptable solution to the test frequency.

Both valves have been tested, RH-CV-783, on February 27,1979,and RH-CV-808A on February 16, 1983. The results of these tests found both valves satisfactory and no internal degradation was found. A copy of the inspection procedure is attached for your review as Attachment 4 to this submittal. Both valves are scheduled for inspection during the 1987 outage.

16.0 Item closed.

17.0 Item closed.

NOTE: Table 3.11-1 will be revised during the implementation of the Haddam Neck Plant Standard Technical Specifications.

18.0 Item closed.

19.0 Item closed.

20.0 Item closed.

21.0 Item closed.

22.0 Item closed.

23.0 Item closed.

24.0 Item closed.

NOTE: Table 3.11-1 will be revised during the implementation of the Haddam Neck Plant Standard Technical Specifications.

.?

25.0 Item closed.

26.0 Item closed.

27.0 Item closed.

28.0 Item closed.

29.0 Item closed.

30.0 Item closed.

31.0 Item closed.

32.0 Item closed.

33.0 CYAPCO will send copy of Drawing 16103-27072 to the NRC when the new revision is issued. When revision 4 was issued, WD-HICV-1840 and WD-TV-1846 were omitted.

34.0 Item closed.

35.0 Item closed.

36.0 Item closed.

37.0 Item closed.

38.0 Item closed.

39.0 Item closed.

40.0 Item closed.

41.0 Open Item for Licensee:

Determine testing program for EDG auxiliary system valves upon receipt of NRC letter.

Response

Same as Item 3.

During the NRC Review there was an additional listing of valves provided to the Licensee for explanations as to why they are not in the IST program.

Valves that need final explanations are listed below. Any relief requests

required are identified within the IST Program under the applicable section.

1) RC-MOV-501 RC-MOV-526 RC-MOV-512 RC-MOV-537 RC-MOV-513 RC-MOV-533 RC-MOV-524 RC-MOV-546 These valves will be added to the IST Program as Class 1, Category B Valves, and will be tested during each refueling.

This is a change in our previous position, as stated in Reference (2). Test requirements would be to exercise the valve and verify Position Indication. These valves will be closed 30 minutes after steam generator tube rupture by operator action.

2) RC-CV-509 RC-CV-423 RC-CV-536 RC-CV-545 These valves will be added to the IST Program as Class 1, Category B Valves. These valves provide loop over pressure protection. Due to geometry there may be no practical way to exercise these valves.
3) CC-RV-763A, B These valves will be added to the IST program as Category C Valves. This is a change from our previous position, as documented in Reference 2.

References:

1) Docket No. 50-213 " Inservice Testing of the Emergency Diesel Generator Auxiliary System", from C. I. Grimes to J. F. Opeka, dated August 15, 1986.
2) F. M. Akstulewicz letter to 3. F. Opeka, dated August 3,1986.

o 4

Attachment 2 Haddam Neck Plant Table IWV-1 February 1987

.g 1

4 9

~

OPERATIONAL READINESS TESTING FOR VALVES The attached t'a ble includes all valves in the Haddam Neck Plant which are required to be identified under Subsection IWV of ASME Section XI, as further defined in NRC staff guidelines and in meetings with NRC etaff reviewers, CYAPCO, and NUSCO personnel.

Most of the valves are presently under surveillance testing requirements of plant Technical Specifications or administrative 1y controlled by plant procedures. In some cases, the specific requirements of IWV cannot be met due to plant design, operational requirements, or infringement on safety margins. These situations are noted as required and pertinent waiver requests and alternate test schemes are presented.

Valves which cannot be tested while the reactor is at power can, for the most part, be tested during cold shutdowns. CYAPC0 has established a program to commence testing these valves within 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> of achieving cold shutdown conditions and to continue as time permits on subsequent shutdowns without repeating valve tests until the entire list has been completed.

Leak testing of pressure isolation valves will be conducted to the requirements of IWV-3420.

Relief valve setpoints will be tested in accordance with ASME PTC25.3 -

1976.

In that the Haddam Neck Plant has been in service for over ten years before the start of this program, the preoperational test data required by IWV-6220 are not available in all cases. Component record packages will contain available preoperational and manufacturer's test reports.

This information is located, in most cases, in Nuclear Records.

All exercising and testing procedures required by Article IWV, including schedules and the limiting values of observed parameters, shall be defined and performed by CYAPCO.

Locked valves are listed separately. These valves are considered

" passive" and, as such, are not exercised or tested.

re81/611213

4 Y

7 4 E

~

W B

U

.,a ~

ED >=

4 O .

>= Lab k

5 I

l l

l i

i 1

i I

i b l

l

  • Class / Size Valve Normal Test Relief Test Vr,1ve Nurber Category Function (Inches) Type Actuation Position Required Requested Alternate Remarks Reactor Coolant System 16103-26045, Sh. 4 PR-MOV-567 1-B Pressurizer Relief isolation 2 CA M C Q MT 20 sec, to open PI PR-MOV-569 1-B Pressurizer Relief Isolation 2 CA M C 0 MT - 20 sec. to open PI FQ-SV-584 1-C Pressurizer Safety 3 REL SRV PR-SV-585 1-C Pressurizer Safety 3 REL SRV PR-SV-586 1-C Pressurizer Safety 3 REL SRV PR-RV-587 2-C Pressurizer Relief 3 REL SRV PR-RV-588 2-C Pressurizer Relief 3 REL SRV PR-SOV-552A 1-B Pressurizer Head Vent 1 CL SOL C CS PI PR-50V-5528 1-8 Pressurizer Head Vent 1 CL SOL C CS Pi PR-50V-552C 1-B Pressurizer Head Vent 1 CL SOL C CS PI FR-50V-552D 1-B Pressurizer Head Vent 1 CL SOL- C CS PI RC-50V-596A 1-B RPV Head Vent 1 CL SOL C CS PI

, Change Mo. 1

. Revision 1 Date 6-1-83

C1 cog / Vr,1 ve Normal T st R211ef Test Vr.tve Nunter Category Function Sire Type Actuation Position Required Requested Afternate Remarks RC-50V-5968 1-8 RPV Head Vent 1 CL SOL C CS PI RC-50V-596C 1-B RPV Head Vent 1 CL SOL C CS Pl RC-50V-596D 1-B RPV Head Vent 1 CL SOL C CS PI PR-A0V-568 1-B Pressurizer PORV 3 CA A C C3 20 sec, to open/ closed MT PI P?-A0V-570 1-B Pressurizer PORV 3 CA A C CS 2J sec. to open/ closed MT PI PR-A0V-574 1-B Pressurizer Spray 2 CL ADV C CS MT No Time PI PR-A0V-573 1-B Pressurizer Spray- 2 CL A0V C CS MT No Time PI RC-MOV-501 1-B Loop #4 Isolation-TH 27.5 CA MOV O O X RR I;T No Time PI RC-MOV-512 1-B Loop #4 Isolation-TC ~27.5 CA MOV O O N RR MT No Time PI

, Change No. 1

. Revision 1 Date 6-1-83

Class / Valve Mormal Test Ralief Test Valve Number Category Function Size Type Actuation Position Required Requested Alternate Remarks RC-MOV-513 1-B Loop #3 Isolation 27.5 CA MOV O O X RR MT- No Time PI' RC-MOV-524 1-B Loop #3 frolation 27.5 CA MOV O O X RR MT No Time PI RC-MOV-526 1-B Loop #2 Isolation 27.5 CA MOV O O X RR MT No Time F1 RC-MOV-537 1-B Loop #2 Isolation 27.5 CA MOV O O X RR MT No Time Pl RC-MOV-538 1-B Loop #3 Isolation 27.5 CA MOV O O X RR MT No Time Pt RC-MOV-546 1-B Loop 83 Isolation 27.5 CA MOV O O X RR MT No Time PI RC-MOV-509 1-B Loop Press. Equal. 1.5 Spring C SRV See Note 5 Line Check RC-MOV-523 1-B Loop Press. Equal. 1.5 Spring C SRV See Note 5 Check RC-MOV-536 1-B Loop Press. Equal. 1.5 Spring C SRV See Note 5 Check RC-MOV-545 1-B Loop Press. Equal. 1.5 Spring C SRV See Note 5 Check

, Change No. 1

. Revision 1 Date 6-1-83

4 0

4 SYSTEM: REACTOR COOLANT

1. Valves: RC-SOV-596A, B, C, D, and PR-SOV-552A, B, C, and D Class / Category: l-B Function: Head vent valves on RPV and pressurizer.

Test Requirement: Exerci'sc for operability, measure stroke time, and verify position indication.

Basis for Test Frequency: It is not practical to exercise these valves during normal operations.

Failure of valve in a nonconservative position could cause a shutdown.

Timing the operation of solenoid valves is not practical due to the speed of operation.

These valves will be exercised and position indicators checked at cold shutdown.

2. Valves: PR-A0V-568 and PR-A0V-570 Class / Category: 1-B Function: Pressurizer PORV Test Requirement: Exercise for operability, measure stroke time, and verify position indication.

Basis for Cold Shutdown It is not practical to exercise Test Frequency these valves during normal opera-tions. Failure of valve in a nonconservative position could cause a shutdown.

These valves will be exercised and position indicators checked at cold shutdown.

3. Valves: PR-A0V-574 and PR-A0V-573 Class / Category: 1-B Function: Pressurizer spray Test Requirement: Exercise valve for operability.

re81/611213

0 0

Basis for Test Frequency: Cycling these valves at full power p would disrupt pressure which could lead to a shutdown.

These valves will be tested at cold shutdown.

4. Valves: RC-MOV-501, 512, 513, 524, 526, 537, 538, and 546 Class / Category: 1-B Function: RCS Loop Isolation Test Requirement: Exercise for operability and verify position indication.

Basis for Test Relief It is not practical to exercise and Test Frequency: these valves during normal operations or cold shutdown.

Operation of these valves could cause flow to be lost in the loop and would isolate a steam generator, causing a plant shutdown and loss of a heat sink.

Alternate Testing: These valves will be tested during refueling.

5. Valves: RC-CV-545, 509, 523, and 536 NOTE: These valves may not be possible to test due to pipe geometry. A test will be attempted in 1987 outage.

re81/611213

. _ - _ _ _ - - - . _ . . _ _ . . . _ - . . ~ - _ . . .

_ - - . , - . - - - . . - - - ~ . _ - _ . _ . _ - . - , - _ . _ - - . ~ . - . . . . . _ . _ . - .

I Class / Valve Normal Test Relisf Icst Valve 96 umber Category Function Size Type Actuation Position Required Requested Alternate Remarks Power Operated Relief Valve Air Accumulator System CA-50V-752 3-8 PORY Air System Supply .5 CL SOL C CS PI CA-50V-754 3-B PORY Air System Supply .5 CL SOL C CS PI CA-CV-825 3-C PORV Air System Supply isolation .5 CK C CV Passive LT Will be part of system tested CA-CV-826 3-C PORY Air System Supply isolation .5 CK C l CV Passive LT will be part of system tested CA-RV-838A 3-C PR-A0V-568 Relief .25 REL SRV CA-RV-8388 3-C PR-A0V-570 Reifef .25 REL SRV j CA-RV-719 3-C Containment Instrument Air .25 REL SRV l

l CA-RV-720 3-C Containment Instrument Air .25 EEL SRV CA-RV-721 3-C Containment Instrument Air .25 REL SRV CA-RV-S29 3-C Containment Instrument Air '.5 REL SRV

. Change No. 1

. Revision 1 Date 6-1-83

,--.e.- - - , . ..--, .- --.n, . - - - - - - - - . , . . , - - , , . , , .- - -

- . , - - - . - , -..w---.w.. r ~ ,- -.. , , , - ,r, -

SYSTEM: POWER OPERATED RELIEF VALVES AIR ACCUMULATOR SYSTEM

1. Valves: CA-S0V-752 and CA-SOV-754 Class / Category: 3-B Function: Supply air to the PORVs.

Test Requirement: Exercise for operability, measure stroke time, and verify position indication.

Basis for Test Frequency: These valves are tested in conjunc-tion with the PORVs. It is not practical to exercise these valves during normal operation. Failure of these valves could cause the PORVs to be in a nonconservative position, which could cause a shutdown.

Timing the operation of solenoid valves is not practical due to the speed of operation.

These valves will be tested at cold shutdown.

i re81/611213

l l Cices/ Vc1we Nornst Test R21tsf Tcst vr.1we kanber Categerv Function Sire Type Actuation Position Required Requested Alternate Remarks Safety injection System 16103-26045, Sh. 6 & 6A St-CV-103 2-C LPSI Discharge to RHR System 10 CK C CV X RR See SI-CV-107A 2-C "A" LPSI Pump Discharge Check 10 CK C CV X RR Relief St-CV-107B 2-C "B" LPSI Purp Discharge Check 10 CK C CV X RR Request SI-CV-8 SEA 2-C "A" tPSI Pump Discharge Check 6 CK C CV X RR St-CV-856B 2-C *B" tPSI Pump Discharge Check 6 CK C CV X RR St-MOV-661A 1-A Loop 1 Safety injection Isol. 3 CA M C CS 4.3-B.3 Tech. Spec.

MT IS sec. to open LT PI SI-PCV-B618 1-A Loop 2 Safety injection Isol. 3 CA M C CS 4.3-B.3 Tech. Spec.

MT IS sec. to open LT Pl SI-POV-861C 1-A Loep 3 Safety injection isol. 3 CA M C CS 4.3-B.3 Tech. Spec.

MT IS sec. to open LT Pi St-MOV-E61D 1-A Locp 4 Safety Injection Isol. 3 CA M C CS 4.3-B-3 Tech. Spec.

MT IS sec to open LT PI St-CV-Ef7A 1-AC Loop 1 SI Isolation Check-P3 3 CK C CV X RR See Relief Request l LT/CS 4.3-F Tech. Spec.

St-CV-8678 1-AC Loop 2 St Isolation Check-P3 3 CK C CV X RR See Relief Request LT/CS 4.3-F Tech. Spec.

, Change No. 1

. Revision 1 Date 6-1-83

I l

Clas / Valve Normal Test Rellsf Te.t Y-Twe Number Category Function Sire Type Actuation Position Required Requested Alternate Remarks SI-CV-E62C 1-AC Loep 3 SI Isolation Check-P3 3 CK C CV X RR See Relief Request j LT/CS 4.3-F Tech. Spec.

SI-CV-%2D 1-AC Loep 4 St Isolation Check-P3 3 CK C CV X RR LT/CS 4.3-F Tech. Spec.

SI-V-863A 2-A Lcop 1 SI Test Recirc to RWST-P24 .75 CL H LC LT Passive SI-V-8638 2-A Loop 2 SI Test Recire to RWST-P24 .75 CL H LC LT Passive l

1 f St-V-863C 2-A Loep 3 St Test Rectre to RwST-P24 .75 CL H LC LT Passive l SI-V-EE3D 2-A Locp 4 St Test Rectre to RwST-P24 .75 CL H LC LT Passive SI-RV-870 2-C tPSI Reifef to RwST 1 REL SRV SI-NCV-871A 1-B Core Deluge to RV Head 6 CA M C CS 4.3-B.3 Tech. Spec.

MT 15 sec. to open LT X See Relief Request PI SI-MOV-8718 1-B Core Deluge to RV Head 6 CA M C CS 4.3-B.3 Tech. Spec.

MT 15 sec. to open LT X See Relief Request PI SI-CV-872A 1-AC Core Deluge to Head Check 6 CK C CV X RR See Relief LT/CS 4.3-F Tech. Spec.

SI-CV-8778 1-AC Core Deluge to Head Check 6 CK C CV X RR Request LT/CS 4.3-F Tech. Spec.

St-POV-24 2-9 Fream RwST to PPSI Purp 16 CA M LO O X RR Passive-PI P.S. Quarterly MT

. Change No. 1

. Revision 1 Date 6-1-83

11 -

SYSTEM: SAFETY INJECTION

1. Valves: SI-CV-103, 107A, 107B, and SI-CV-872A/B Class / Category: 2-C, 1-AC Function: Check valves in flow path of LPSI pumps to core deluge valves.

Test Requirement: Exercise valves to full open position.

Basis for Test Frequency: Full or partial valve exercising requires that flow be established into the reactor vessel from the refueling water storage tank, using the LPSI pumps. System pressure downstream of these valves does not allow flow during normal operations.

During cold shutdown, available volume in the reactor vessel is insufficient to accommodate flow required for exercising these valves. Introduction of RWST water to the reactor coolant system requirca additional waste liquid processing which is time consuming and delays start-up.

Alternate Testing: CYAPCO will perform a system flow tert each refueling to exercise these valves. The water will be pumped from the RWST to the reactor vessel. The flow will be determined by measuring the discharge and suction head. CY will calculato the pump head to find the corresponding flow from the pump curve that indicates valve perf ormance.

2. Valves: SI-CV-856A/B and SI-CV-862A/B/C/D Class / Category: 2-C, 1-AC Function Check valves in flow path of IIPSI pumps to reactor coolant system.

Test Requirement: Exerciso valves to full open ponition.

re81/611213

Basis for Test Frequency: In order to full stroke these check -

valves, flow must be established into the reactor vessel from the refueling water storage tank using the HPSI pumps. System pressure downstream of these valves does not allow flow during normal operation.

During cold shutdown, available volume in the reactor vessel is insufficient to accommodate flow required for exercising these valves. Introduction of RWST water to the reactor coolant system requires additional waste liquid processing which is time consuming and delays start-up.

Alternate Testing: CYAPCO will perform a system flow test each refueling to exercise these valves. The water will be puuped from the RWST to the reactor vessel. The flow will be determined by measuring the discharge and suction head. CY will calculate the pump head to find the corresponding flow from the pump curve that indicates valve performance.

3. Valves: SI-MOV-861A/B/C/D Class / Category: 1-A Function: Pressure isolation stop valves in flow path f rom IIPSI pumps to reactor coolant system.

Test Requirement: Exercise to full open position.

Basis for Test Frequency: The inability to check the closed integrity of SI-CV-862A/B/C/D prior to exercising SI-MOV-861A/B/C/D.

These valves interface directly with the RCS at operating pressure.

Alternate Testing: These valves will be full stroked at cold shutdowns.

4. Valves: SI-MOV-24 Class / Category: 2-B re81/611213

m

. s

. ~' (

x .)

Function: RWST/HPS1 system isolation. This valve is normally locked open? but could be used during a small bieak LOCA for high head recirculation. -

Test Requirement: Exercise valve to close.

Basis for Test Frequency: It is not practical to exercise this valve during normal operations or ,

cold shutdown. Failure of valve in a nonconservative position would .

disable the HPSI system, causing a plant shutdown and delaying plant start-up. ';

CYAPCO will exercise this valve during refueling and partially stroke test (one inch of travel) quarterly.

5. Valve: SI-MOV-871A/B Class / Category: 1-B Function: Together with SI-CV-872A/B. these valves act as a pressure boundary, isolating the lower design pressure LPSI from the RCS operations pres-sure.

Test Requirement: Exercise valve for operability. <

Basis for Relief and The inability to check the closed Test Frequency: integrity of the 872A/B valves prior ,

to exercising MOVs 871A/B. These _

valves interface directly with the RCS at operating pressure. There is no way to perform a leakage test on -

these valves. They are welded directly to CD-CV-872A/B.

Alternate Testing: These valves will only be full stroked at cold shutdowns.

re81/611213

.- p 4\ .

w g

. = , ,V , ./

'ix 9y C1 css / Vsive Normal Tast Hillsf Tsst V-Ive Number Category Function Size Type Actuation Position Required Requested Alternate Remarks Residual Heat Removal '

.

  • 16103-26045, Sh. 5, 6

, ~

x - , s

, ^ .

-4 , ,

RH-MOV-22 2-B Containment Sunp Suction isol. / 8. CA M

=

C] O, i 90 sec. to open MT PI -

RH-MOV-23 2-B Containment Spray isolation 8 CA M C CS MT 90 sec. to open Pl RH-MOV-25 2-B Charcoal Filter Spray isol.  ? CA M C 0 MT 30 sec. to open PI RH-MOV-26 2-B Charcoal Filter Spray isol. 2 CA M C 0 MT 30 sec. to open PI RH-MOV-27 2-B Charcoal Filter Spray isol. 2 CA M C 0 MT 30 sec. to open PI RH-MOV-28 2-B Charcoal Fliter Spray Isol. 2 CA M C 0 MT 30 sec. to open PI RH-MOV-29 2-8 Charcoal Filter Spray Header Isol. 3 CA M C 0 MT 40 sec. to open Pl RH-MOV-33A 2-B RHR to CVCS X-Connect 4 CA M C CS MT 90 sec. to open PI RH-MOV-33B 2-8 RHR to CVCS X-Connect 4 CA M C CS

- MT 90 sec. to open Pi Change No. 1

. Revision 1 Date 6-1-93 J

,, 5 y

'*i 1 _ , . ,

Clast/ Velve Normal -* Test -

Rallsf Tsat l Valve Number Category Function Size Type Actuation Position Required Requested Alternate Remarks Containment Spray isolation RH-MOV-34 , 2-B 8 CA M -C CS -

i

..  ; MT 90 sec. to open P I '^'

P.H-RV-715 2-C RHR System Relief 3 REL SRV RH-MOV-780 1-A Inboard Stop - RCS Loop No. I 10 CA M C CS -

MT ~ 40 sec, to open g

PI

- ~

FN-MOV-781 1-A Outboard Stop - RCS Loop No. 1 10 CA M C CS MT 40 sec. to open LT P1 RH-MOV-874 2-B RtB to RWST, charging and SI 6 CL M LC 0 System MT No Time Pl RH-CV-783 2-C Containment Sump Suction Check 8 CK C CV X SV Requires disassy.

RH-CV-788A 2-C "A" RHR Pump Discharge Check 8 CK C CV/CS RH-CV-788B 2-C "B" RHR Pump Discharge Check 8 CK C CV/CS RH-MOV-803 1-A Outboard Stop - RCS Loop ho. 2 10 CA M C CS MT 40 sec. to open LT PI RH-MOV-804 1-A Inboard Stop - RCS Loop No. 2 10 CA M C CS MT 40 see, to open LT P1 RH-V-808A 2-8 Containment Sump Suction isol. 8 CA H C 0 Change No. I

. Revision 1

. Date 6-1-83

Class /. Valva Norm 21 -Tnt Rslief

.Tsst

. Vnivs Number Category Function Sire type Actuation Requested Position Required Alternate Remarks-a RH-CV-808A 2-C' Contsinnent Sump Suction Check 8 CK C CV X SY Requires disassy.

RH-FCV-796 2-BE RHR HX Flow Control 10 CON A 0 (Tech Specs) Blocked open to fixed position -

l RH-FCV-602 2-BE RHR HX Sypass Flow Control 8 CON A C (Tech Specs) Blocked closed to

fixed position-1 l

i 4

i 1

^

l i

! i i

i i

1 t

I l

Change No. 1

, Revision 1

- Date 6-1-83 .

i i,. , , - , .. _ - _ . _ _ . - _

_ - -. . . ..m , . _ _ ,

0 SYSTEM: RESIDUAL HEAT REMOVAL SYSTEM

1. Valves: RH-MOV-23 and RH-MOV-34 Class / Category: 2-B Function: Isolates containment spray system from RHR system.

Test Requirement: Exercise valves for operability.

Basis for Test Frequency: The containment spray system is set up such that opening either RH-MOV-23 or 34 will initiate flow. By entering the containment and closing manual valve RHR-V-23A, the valves could be "no flow" stroked, but technien1 specifications 3.11 prevent this, as it would be dis-abling the containment spray system.

These valves will be exercised during cold shutdowns.

2. Valve: RH-MOV-33A/B Class / Category: 2-B Function
  • Isolates cross-connect between RHR system and charging system.

Test Requirement: Exercise valve for operability.

Basis for Test Frequency: RH-MOV-33A/B provide a flow path from the RHR system to the charging pump suction header. Stroking these valves varies the suction header pressure in the charging system and could cause charging pump flow oscillations.

These valves will be exercised at cold shutdowns.

3. Valves: RH-MOV-780 and 781 Class / Category: 1-A Function: Exercise valve for operability.

re81/611213

Basis for Test Frequency: These valves are interlocked with the reactor coolant system such that operation is not possible unless the RCS pressure is less than 375 psig.

' These valves will be exercised during cold. shutdowns.

4. Valves: RH-MOV-803 and 804 Class / Category: 1-A Function: Exercise valve for operability.

Basis for Test Frequency: These valves are interlocked with the reactor coolant system such that operation is not possible unless the

, RCS pressure is less than 375 psig.

These valves will be exercised at cold shutdowns.

5. Valves: RH-CV-783 and RH-CV-808A Class / Category: 2-C Function: Prevent reverse flow in containment sump suction piping to RHR system.

Basis for Relief: These valves are located in piping which is normally drained and do not function unless water is present in

, the containment sump, as would be

the case during a LOCA. It is not

!- practicable to flood the containment floor and sump to hydraulically exercise these valves. In order to test these valves during refueling, it would require that the RHR system l be taken out of service. To take

, the RHR system out of service would l

require the core to be unloaded.

This is not practical to do every outage.

4 Alternate Testing: Both of these valves will be disas-sembled and inspected to determine interior condition and operability l -

every five years or at a less

! frequency when ever the core is unloaded. RH-CV-783 was disassem-bled and inspected in February 1979, RH-CV-808A in February 1983, and-J found to be in satisfactory condi-I tion.

re81/611213

, 6. Valves: .

RH-CV-788A/B Class / Category: 2-C Function: RHR pump discharge check valves.

Test Requirement: Exercise for operability.

Basis for Test Frequency: Full flow through these valves is

~ not possible except at cold shutdown at which time the system is in operation. Part stroking is done monthly as the pumps are tested.

These vcives will be full stroked at cold shutdowns.

F i

l t

l l

i re81/611213 b

Class / V21va Normx1 Test Ralief Tcst V21v3 Number Category Function Size Type Actuation Position Required Requested Alternate Remarks Chemical & Volume Contr'o1 16103-26045, Sh.10,10A BA-MOV-32 2-B RWST to Ch. Pump Suction 6 CA M C CS MT 90 sec. to open PI

, LD-MOV-200 1-B Letdown isol. from RCS 3 CA M 0 CS MT 40 sec. to close PI LD-RV-20S 2-C Letdown System Relief 3 REL SRV CH-MOV-2S7 2-B VCT Outlet to Ch. Pump Suction 4 CA M 0 CS HT 20 sec. to close Pl CH-CV-263 2-C "A" Ch. Pump Discharge Check 3 CK 0 CV/0 CH-CV-272 2-C "B" Ch. Pump Discharge Check 3 CK 0 CV/0 i CH-CV-293 1-C Charging Line to Loop No. 2 3 CK 0 CV/0 Verify open only CH-MOV-2920 1-B Charging Line to Loop No. 2 3 CA M 0 0 MT IS sec. to close PI CH-MOV-292C 1-B Charging Line to Loop No. 2 3 CA M 0 0 MT IS sec to close Pl CH-A0V-278 2-B Charging Line Suction to 2 CL M C 0 No Time Metering Pump MT Pl CH-FCV-110 2-B Charging Flow Control 3 CON A 0 CS MT No Time Pl Change No. 1

. Revision 1

. Date 6-1-83

Class / Valva Normal Test RJ11sf Test Vrive Number Category Function Size Type Actuation Position Required Requested Alternate Remarks CH-FCV-110A 2-B Charging Flow Control 3 CON A 0 'CS Pi BA-CV-3?O 2-C Boric Acid Supply to Ch. Pumps 2 Ch . C CV/CS ,

Verify open only BA-MOV-349 3-B Boric Acid Supply to Metering Pump 2 CA M C 0 MT- 30 sec. to open Pl BA-CV-361 3-C "B" Boric Acid Pump Disch. Check 2 CK C CV/0 BA-CV-370 3-C "A" Boric Acid Pump Disch. Check 2 CK C CV/0 BA-MOV-366 2-B Boric Acid to Ch. Sys. 2 CA M C CS HT 30 sec. to open Pl BA-CV-372 2-C RWST to Ch. Pump Suction Check 6 CK C CV/CS Verify open only BA-MOV-373 2-B RWST to Ch. Pump Suction 6 CA M C CS HT 20 see' to open Pl BA-MOV-386 2-B RWST to Metering Pump 2 CA M C 0 MT 30 sec. to open Pl BA-CV-387 3-C Boric Acid Pump Disch. to Ch. Pump 2 CK C CV/CS Verify open only

l 4

CH-CV-399 2-C CH. Pump Disch. to RHX-P8 3 CK 0 CV/0 Verify open only CH-MOV-331 2-B Seal Water Return Line Trip .75 CA M 0 CS MT No Time Pl

~\

Change No.1 Revision 1

! Date 6-1-83

C1:ss/ Val va Norms 1 Test Rallef Tsst Valv3 Number Category Function Size Type Required Actuation Pcsition Requested Alternate Remarks DH-MOV-310 1-A Drain Header Remote Throttle 2 CA M C CS MT Passive LT Pl DH-V-311 1-A Drain Header 2 CA H C 0 X Passive LT FH-FCV-295 2-8 Loop Fill Flow Controller 3 CL A C 0 MT No Time PI FH-MOV-3% 2-B Loop Fill Flow Controller 2 CL M C 0 MT No Time a

PI FH-MOV-578 1-B Loop 1 Fill isolation 1.5 CA M C 0 X RR MT No Time Pl DH-MOV-5% 1-B Loop 1 Drain isolation 1.5 CA M C 0 X RR MT No Time PI FH-MOV-535 1-B Loop 2 Fill isolation 1.5 CA M C 0 X RR MT No Time PI DH-MOV-534 1-B Loop 2 Drain isolation 1.5 CA M C 0 X RR MT No Time PI FH-MOV-522 1-B Loop 3 Fill isolation 1.5 CA M C 0 X RR' MT No Time P1

Change No. 1
  • Revision 1

. Date 6-1-83 m

Class / Vsive Normal Test R21fsf Tsst Valva Number Category Function Size Type Actuation Position Required Requested Alternate Remarks-DH-MOV-521 1-B Loop 3 Drain Isolation 1.5 CA M C 0 X RR MT No Time PI FH-MOV-508 1-B Loop 4 Fill isolation 1.5 CA M C 0 X- RR -

HT No Time PI DH-MOV-507 1-D Loop 4 Drain Isolation 1.5 CA M C 0 X RR MT No Time PI CH-MOV-311 2-B Reactor Coolant Pump Seal 2 CA M 0 CS isolation MT No Time Pl Oi-MOV-312 2-8 Reactor Coolant Pump Seal 2 CA M 0 CS isolation MT No Time

. Pl CH-MOV-313 2-B Reactor Coolant Pump Seal 2 CA M 0 CS lsolation MT No Time Pl CH-MOV-314 2-8 Reactor Coolant Pump Seal 2 CA M 0 CS MT No Time Pl CH-MOV-298 1-B Charging to Pressurizer Spray 1%~ CA M C 'CS MT No Time PI i

! CH-CV-305A 1-C Charging to Seal-P77 2 CK 0 CV/O Verify to open CH-CV-3058 1-C Charging to Seal-P76 2 CK 0 CV/0 Verify to open Change No. 1

. Revision 1 Date 6-1-83

C14tss/ Vsiva Nortsal Test' Ra11sf Test Vriva Number Category Function Size Type. Actuation Position Required Requested Alternate Remarks Of-CV-305C 1-C Charging to Seal-P75 2 CK 0 CV/0 Verify to open CH-CV-305D 1-C Charging to Seal-P74 2 CK 0 CV/0 Verify to open OH-RV-1847 2-C Drain Header 2 REL SRV CH-RV-332 2-C Seal Water Return 3 REL SRV 2

BA-RV-279 2-C Meter Pump Suction .5 REL SRV -

CH-RV-280 2-C Meter Pump Discharge 1.5 REL SRV

~

Change No. 1

  • Revision 1 Date 6-1-83

SYSTEM: CHEMICAL AND VOLUME CONTROL

1. Valve: BA-MOV-32 Class / Category: 2-B Function: Isolates the refueling water storage tank from the charging pump suction header.

Test Requirement: Exercise valve for operability.

Basis for Test Frequency: Cycling this valve could potentially cause a highly borated solution to reach the RCS, via the charging system, which is in continuous service.

Exercise valve for operability at cold shutdown.

2. Valve: LD-MOV-200 Class / Category: 1-B Function: Isolates letdown flow from the RCS.

Test Requirement: Exercise valve for operability.

Basis for Test Frequency: Closing this normally open valve to check operability would disrupt letdown flow. This would cause

, flow / pressure transients in the charging and letdown ~ systems.

l l Exercise valve for operability at l cold shutdowns.

j 3. Valve: CH-MOV-257 Class / Category: 2-B Function: Isolates volume control tank from charging pump suction header.

l Test Requirement: Exercise valve for operability.

re81/611213

O O

Basis for Test Frequency: Closing this normally open valve would cause the charging pumps to cavitate. Part stroke testing is not possible (no jog control on valve operator).

Exercise valve (full stroke) during cold shutdowns.

4 Valves: CH-FCV-110/110A Class'/ Category: 2-B Function: Controls charging flow to RCS.

Test Requirement: Exercise valve for operability.

Basis for Test Frequency: These valves are arranged in paral-1el flow paths, such that either valve can be utilized to control charging flow to the RCS. The valves are normally open and modu-late to control flow. Exercising these valves full stroke during normal operations would cause flow and pressure transients in the charging system.

. These valves will be full stroke exercised at cold shutdown.

5. Valve: BA-CV-320 Class / Category: 2-C Function: Prevents reverse flow in the boric acid solution supply line to the charging pump suction header.

Test Requirement: Exercise valve for operability.

Basis for Test Frequency: Exercising this valve to the open position must be done by passing flow through it and this could potentially cause a concentrated boric acid solution to reach the reactor via the charging system.

Exercise valve for operability at cold shutdown.

re81/611213

6. Valve: BA-MOV-366 Class / Category: 2-B Function: Isolates boric acid subsystem from charging pump suction header.

Test Requirement: Exercise valve for operability.

Basis for Test Frequency: Operation of this valve while the plant is at power could potentially cause a concentrated boric acid solution to reach the reactor via the charging system.

This valve will be exercised at cold shutdowns.

7. Valve: BA-CV-372A Class / Category: 2-C Function: Prevents reverse flow into the RWST transfer line to the charging pump suction header.

4 Test Requirement: , Exercise valve for operability.

Basis for Test Frequency: Operation of this valve while the plant is at power could cause boric acid solution to reach the reactor via the charging system.

i This valve will be exercised at cold shutdowns.

8. Valve: BA-MOV-373 Class / Category: 2-B Function: RWST to charging pump suction header isolation valve.

Test Requirement: Exercise valve for operability.

, Basis for Test Frequency: Operation of this valve while the plant is at power could potentially cause boric acid solution to reach the reactor.

Alternate Testing: This valve will be exercised at cold shutdowns.

re81/611213

9. Valve: BA-CV-387 Class / Category: 3-C Function: Prevents backflow from charging pump suction header to boric acid sub-system.

Test Requirement: Exercise valve for operability.

Basis for Test Frequency: Exercising this valve to the open position must be done by passing flow through it. This could potentially cause a concentrated boric acid solution to reach the reactor via the charging system.

This valve will be exercised at cold shutdowns.

10. Valve: DH-MOV-310 Class / Category: 1-B Function: RCS loop drain pressure isolation.

Test Requirement: Exercise valve for operability.

Basis for Test Frequency: DH-MOV-310 is a normally c'p=ed valve. This system is used for draining the loops, however, this system could be used for alternate letdown. Exercising this valve

could cause overpressurization of the loop drain system.

! This valve will be exercised during l

cold shutdown.

l 11. Valve: CH-MOV-331 Class / Category: 1-A Function: Isolation bypass valve for #1 seal j water return line.

1 Test Requirement: Exercise for operability.

i l

re81/611213 i

Basis for Test Frequency: In order to cycle this valve, reactor coolant system pressure must be greater than 100 psig, but less than 1,000 psig. Cycling this valve.

at full power will disrupt RCP seal flow which will result in damaging out the #1 seal on the RCPs.

This valve will be exercised at cold

, shutdown.

12. Valves: CH-MOV-311, 312, 313, and 314 Class / Category: 2-B Function: Reactor coolant pump seal water return isolation.

Test Requirement: Exercise for operability.

Basis for Test Frequency: Cycling these valves at full power would disrupt RCP seal flow which could cause a failure of the RCP's seals.

These valves will be exercised at cold shutdowns.

13. Valve: CH-MOV-298 Class / Category: 1-B Function: Charging system to pressurizer spray. --

Test Requirement: Exercise for operability.

Basis for Test Frequency: Cycling this valve at full power would disrupt pressurizer pressure which could lead to a shutdown.

This valve will be exercised at cold shutdown.

14. Valves: FH-MOV-578, 535, 522, and 508 Class / Category: 1-B Function: Isolate RCS from fill header, re81/611213

Basis for Test Frequency The inability to check the closed and Relief Request: integrity of the FH-CV-296 prior to exercising these MOVs.

TS.ese valves interface directly with the RCS at operating pressure.

This system is normally used to fill the RCS during refueling.

These valves will be tested at refueling.

15. Valves: DH-MOV-544, 534, 521, and 507.

Class / Category: 1-B Function: Isolate RCS from Drain Header.

Basis for Test Frequency These valves interface directly with and Relief: the RCS of operating pressure. This system is normally used to drain the RCS during refueling.

These valves will be tested at refueling.

re81/611213

Cicss/ ' Vsiva Normal Test ~R2116f Tc t Valva Number Category Function Size Type Actuation Position Required Requested Alternate Remarks Main Steam System 16103-2604S, . Sh. 1 i MS-NRV-11 2-BC SC No. 1 Non-Return Valve 24 Stop H 0 CS I . CK MS-NRV-21 2-BC SG No. 2 NonReturn Valve 24 Stop H 0 CS CK MS-NRV-31 2-BC SG No. 3 Non-Return Valve 24 - Stop H 0 CS ,

CK 1

MS-NRV-41 2-BC SC No. 4 Non-Return Valve 24 Stop H 0 CS i

CK i

MS-SV-11 2-C SC No. 1 Main Steam Safety 6 REL SRV MS-SV-12 2-C SC No. 1 Main Steam Safety 6 REL SRV MS-SV-13 2-C SC No. I Main Steam Safety 6 REL SRV MS-SV-14 2-C SG No. 1 Main Steam Safety 6 REL SRV MS-SV-21 2-C SG No. 2 Main Steam Safety 6 REL SRV MS-SV-22 2-C SG No. 2 Main Steam Safety 6 REL ~SRV MS-SV-23 2-C SG No. 2 Main Steam Safety 6 REL SRV i

1 Change No. 1 i

  • Revision 1 Date 6-1-83

C1Ess/ Valvs Normal Test Rallsf Test Valve Number Category Function Size Type Actuation Position Required Requested Alternate Remarks MS-SV-24 2-C SC No. 2 Main Steam Safety 6 REL SRV MS-SV-31 2-C SG No. 3 Main Steam Safety -6 REL SRV MS-SV-32 2-C SG No. 3 Main Steam Safety 6 REL SRV MS-SV-33 2-C SC No. 3 Main Steam Safety 6 REL SRV MS-SV-34 2-C SC No. 3 Main Steam Safety 6 REL SRV MS-SV-41 2-C SG No. 4 Main Steam Safety 6 REL SRV MS-SV-42 2-C SC No. 4 Main Steam Safety 6 REL SRV HS-SV-43 2-C SC No. 4 Main Steam Safety 6 REL SRV MS-SV-44 2-C SG No. 4 Main Steam Safety 6 REL SRV HS-PICV-1206A 3-B Steam Supply to Aux. FP "A" 2 CON A C 0 MT 90 sec to open FT PI MS-PICV-12068 3-B Steam Supply to Aux. FP "B" 2 CON A C Q HT 90 sec. to ope, FT Pl i

i l

l l

l

. Change No. 1 Revision 1 Date 6-1-83 l

Class / Valva Normal Test Ralief Test Velve Number Category Function Size Type Actuation Position Required Requested Alternate Remarks MS-TV-1211-1 2-BC Main Steam Supply to Turbine 24 Stop A 0 CS CK HT 10 sec. to close PI (Air assisted)

FT P.S. Quarterly 1-inch of. travel without air assist '

MS-TV-1211-2 2-BC Main Steam Supply to Turbine 24 Stop A 0 CS CK HT 10 sec, to close I

PI (Air assisted)

FT P.S. Quarterly 1-inch of travel without air assist

{ MS-TV-1211-3 2-BC Main Steam Supply to Turbine 24 Stop A 0 CS CK HT 10 sec. to close i

P1 (Air assisted)

FT P.S. Quarterly 1-inch of travel without air assist MS-TV-1211-4 2-BC Main Steam Supply to Turbine 24 Stop l A 0 CS CK MT ,

10 sec. to close

P1 (Air assisted)

FT P.S. Quarterly 1-inch of travel without air assist J

Change No. 1 Revision 1 Date 6-1-83

, C1 css / Valve Normal Test Relief Test Valva Number Category Function Sire Type Actuation Position Required Requested Alternate Remarks MS-NRV-18 2-BC SC No. 1 Atmospheric Dump 3 Stop H 0 0 CK e

MS-NRV-28 2-BC SC No. 2 Atmospheric Dump 3 Stop 0 11 0 i CK.

i .

MS-NRV-38 2-BC SG No. 3 Atmospheric Dump 3 Stop H 0 0 CK MRNRV-48 2-BC SC No. 4 Atmospheric Dump 3 Stop H 0 0

. CK MS-SV-1216A 3-C Aux FP "A" Safety Valve 3 REL SRV MS-SV-1216B 3-C Aux. FP "B" Safety Valve 3 REL SRV

MS-HICV-1201 2-B Atmospheric Dump 12 CON A C 0 90 sec. to closed

! MT '

) FT PI a

MS-TV-1212 2-B MS Drain to B/D Tank CL A 0/C 1

0 60 sec. to closed '

MT h, FT

! Pl MS-TV-1213 2-B MS Drain to Condenser l 1 CL A 0/C 0 60 sec. to closed MT

)l FT

! PI t

i Change No. 1

, Revision 1

, Date 6-1-83

SYSTEM: MAIN STEAM SYSTEM

1. Valves: MS-NRV-11, 21, 31, and 41 Class / Category: 2-BC Function: Nonreturn stop check valves in main j steam lines from steam generators.

J Test Requirement: Exercise for operability.

Basis for Test Frequency: Failure of valve in a nonconserva-tive position would cause a loss of system function.

These valves will be full stroke tested at cold shutdowns. Valves are partially stroked quarterly per technical specifications, 4.9.

2. Valves: MS-TV-1211-1, 2, 3, and 4 Class / Category: 2-BC Function: Main steam supply to turbines.

Test Bequirement: Exercise valve for operability and measure stroke time.

Basis for Test Frequency: Failure of valve in nonconservative position would cause loss of system function.

Full stroke exercise and measure stroke time during cold shutdown.

i l

l l

i l

l re81/611213 r

Cices/ .

Vs1vs Normal Tist Ralief Test Valve N&r Category Function Size Type Actuation Position Required Requested Alternate Remarks Feedwater System 16103-26045, Sh. 2 FU-MOV-35 3-B Aux. FP Disch, to SC's 3 GA M C 0 MT 30 sec. to open Pl FG-CV-143-1 2-C FW Supply to SC No. I 12 CK 0 CV/0 Verify open ovily FT-CV-143-2 2-C FW Supply to SG No. 2 12 0 CK CV/O Verify open only FU-CV-143-3 2-C FW Supply to SG No. 3 12 0 CK CV/0 Verify open only FW-CV-143-4 2-C FW Supply to SG No. 4 12 CK 0 CV/0 Verify open only FW-CV-153 3-C "B" Aux. Feedpump Disch. Check 3 CK C CV/CS ^

FW-CV-184 3-C "A" Aux. Feedpump Disch, Check 3 CK C CV/CS FU-CV-156-1 2-C Aux. FW Supply to SC No. 1 1.5 CK C CV/CS Verify open only FN-CV-156-2 2-C Aux. FW Supply to SC No. 2 1.5 CK C CV/CS Verify open only FW-CV-156-3 2-C Aux. FW Supply to SC No. 3 1.5 CK C CV/CS Verify open only FW-CV-156-4 2-C Aux. FW Supply to SC No. 4 1.5 CK C CV/CS Verify open only FM-FCV-1301-1 2-8 SC No. I FW Reg. Valve 8 CON A 0 CS MT 65 sec. to close FT PI FU-FCV-1301-2 2-B SG No. 2 FW Reg. Valve 8 CON A 0 CS HT 65 sec. to close FT Pi e

Change No. 1

  • Revision 1

. Date 6-1-83

C1 css / Valys Norm:1 Test Rallsf Tist Vs1ve Number Category Function Size Type Actuation Position Required Requested Alternate Remarks FW-FCV-1301-3 2-B SC No. 3 FW Reg. Valve 8 CON A 0 CS NT 65 sec. to close FT P1 FO-FCV-1301-4 2-B SG No. 4 FW Reg. Valve 8 CON A 0 CS NT ,

65 sec. to close FT P1 FT-HICV-1301-1 2-8 SC No I FW Reg. Bypass Valve 1.5 CON A C CS MT 60 sec. to open FT PI FiJ-HICV-1301-2 2-B SC No. 2 FW Reg. Bypass Valve 1.5 CON A C CS NT 60 sec, to open FT P1 FU-HICV-1301-3 2-8 SC No. 3 FW Reg. Bypass Valve 1.5 CON A C CS HT 60 sec to open FT PI FW-HICV-1301-4 2-B SC No. 4 FW Reg. Bypass Valve 1.5 CON A C CS MT 60 sec to open FT PI FU-MOV-11 2-8 S. C. No I FW Cont. Valve isol. 12 CA M 0 CS NT 70 sec. max. to close Pi

. Change No. 1 Revision 1 Date 6-1-83 M_f

Cict.s/ Valys Normal Test Relief Test Valvi Number Cateocry Function Size Type Actuation Position Required Requested Alternate Remarks FU-MOV-12 2-B 5. C. No. 2 FW Cont. Valve Isol. 12 CA M 0 CS MT 70 sec. max. to close PI FU-MOV-13 2-8 S. C. No. 3 FW Cont. Valve Isol. 12 CA M 0 CS MT 70 sec. max. to close Pi FU-MOV-14 2-B S. C. No. 4 FW Cont. Valve Isol. 12 CA M 0 CS MT 70 sec. max. to close PI FU-MOV-160 3-B Aux. FW Header Isolation Valve 3 CA M 0 0 MT 35 sec. max to close PI FU-CV-135-1 2-A FW Header Isolation Valve 3 CK C CV Passive FW-CV-135-2 2-A FW Header Isolation Valve 3 CK C CV Passive FW-CV-135-3 2-A FW Header Isolation Valve 3 CK C CV Passive Ftf-CV-135-4 2-A FW Header Isolation Valve 3 CK C CV Passive Change No. 1

. Revision 1 Date 6-1-83

_m _ __ _ _ _ ._. . _ . _ _ __. _ _ _ _ _

SYSTEM: FEEDWATER SYSTEM

1. Valves: FW-CV-153 and FW-CV-184 Class / Category: 3-C Function: "A" and "B" auxiliary feedpumps discharge checks.

Test Requirement: Exercise to open position.

Basis for Test Frequency: Full or partial stroke testing of these valves requires that an i

auxiliary feedpump be started and flow be established to the steam generators. This test is undesir-l able while the reactor is at power because of the steam generator thermal shock potential. The pumps take suction on the demineralized water storage tank (cold water).

These valves will be exercised at cold shutdown.

2. Valves: FW-CV-156-1, -2, -3, and -4 Class / Category: 2-C Function: Check valves in auxiliary feedwater supply to steam generators.

Test Requirement: Exercise to open position.

I Basis for Test Frequency: Full or partial stroke testing of these valves requires that an auxiliary feedpump be started and flow be established to the steam generators. This test is undesir-able while the reactor is at power because of the steam generator thermal shock potential. The pumps take suction on the dctineralized water storage tank (cold water).

These check valves will be exercised at cold shutdowns.

3. Valves: FW-FCV-1301-1, -2, -3, and -4 Class / Category: 2-B Function: Main feedwater regulating valves.

re81/611213

Test Requirement: Exercise for operability and test fail position.

Basis for Test Frequency: Failure of valve in nonconservative position would cause loss of system function.

These valves will be cycled at cold shutdowns.

4. Valves: FW-MOV-11, 12, 13, and 14 Class / Category: 2-B Function: Stop valves in feedwater lines to steam generators.

Test Requirement: Exercise for operability.

Basis for Test Frequency: Failure of these valves in a closed or partially closed cendition would cause loss of system function.

Valves cannot be partially stroke tested.

These valves will be cycled at cold shutdewns.

i i

I '

i i

t i

i l re81/611:13

i. .

1 Cicss/ Valva Norsal Test Rallef Test Valve Humber Category Function Sire Type Actuation Position Required Requested Alternate Remarks Service Water System 16103-26045, Sh. 9 53-MOV-1 3-B East Header Isolation 12 CA M 0 CS MT 90 sec. to close

. PI SW-MOV-2 3-B West Header Isolation 12 CA M 0 CS MT 90 sec. to close Pl St-MOV-3 3-8 CCHX "A" Discharge 16 CA M O/C CS MT 90 sec. to close-PI SW-MOV-4 3-B CCHX "B" Discharge 16 ' CA M O/C 'CS MT- 90 sec. to close.

Pl SwdOV-S 3-B RHRHX "B" Supply 12 CA M C 0 X RR -

MT 90 sec. to open Pl SU-MOV-6 3-B #HRHX "A" Supply 12 CA M C 0 X RR MT 90 sec to open PI S3-A0V-8 3-B Boron Recovery Return isol. 8 CON . A C 0 MT 10 sec. to close FT Pl C; i, V,,

e, s ,-

4 ,

52-A0V-9 3-B SFP HX Return isol. 6' CON A 0 0 5 4

MT 10 sec. to close FT ';t

% PI

\, ,

4, Change No. 1 g r '

(' .. , _ Revision 1 \-

., m

-3 Date 6-1-83 a

h p- I

7__

. . p. 3G

, i g ,, . e - ,

<~m,

, \t

. y m-

': W

, g w y J (9;. .%y

~%

,-. .- O  ;.., -

1 Q U' I \ v -

s'

'$_I, Cicas/ u 4< Vx1va Test Vsive Number Category Function Norma C !f *i' Test s - Rallef -

Sfre Tyr,e Actuation Position khquired 1 Requested- Alternate '

Remarks 4 3 g  %

,, p , v t. 'er g.

SS-A0V-1,29 3-B "A"'Diesef Cooling Return . 4 CON A y C., 0

,g

,s "

7 . NT 4 30 sec to open s ' FT - .

X .

g ,

0 PI y, 57-A0V-130 3-B "B" Diesel Cooling Return 4 CON A ,

C- 0 'k r~N HT' i g '30 sec."to open FT A  :

PI 52-CV-276A 3-C "A" SW Pump Disch. Check 16 CK 0 CV/0 ST-CV-276B 3-C "B" SW Pump Disch. Check 16 CK 0 CV/0 5%-CV-276C 3-C "C" SW Pump Disch. Check 16 CK 0 CV/0 SM-CV-276D 3-C "D" SW Pump Disch, Check 16 CK 0 CV/0 ST-CV-271A 3-C Car Supply Check 6 CK 0 CV/0 Verify open only ST-CV-2718 3-C Car Supply Check 6 0 CK CV/0 Verify open only-ST-CV-271C 3-C Car Supply Check 6 CK 0 CV/0 Verify open only ST-CV-271D 3-C Car Supply Check 6 CK 0 CV/0 Verify open only CC-RV-763A 3-C SW/CC to RHR REL SRV CC-RV-763B 3-C SW/CC to RHR REL SRV Change No.1

  • Revision 1

. Date 6-1-83 a *

. t-SYSTEM: SERVICE WATER SYSTEM P

1. Valves: SW-MOV-1 and 2 Class / Category: 3-B Function: , East and west service water header isolation valves.

TestRequkrement: Exercise for operability.

Basis for Test Frequency: -

, These valves control service water cooling to several essential plant loads. Failure of valves in a nonopen position could cause overheating of these loads, resulting in loss of generation.

3 These valves will be full stroke

- )} tested and timed at cold shutdowns.

2. Valves: SW-MOV-3 and 4

. i-Class / Category: 3-B Function: Component cooling heat exchangers cooling water discharge stops.

Test Requirements: Exercise for operability.

Basis for Test Frequency: These valves control service water cooling to the component cooling heat exchangers. Failure of valve in a nonopen position could cause overheating, resulting in loss of generation.

These valves will be full stroke tested and timed at cold shutdowns.

3. Valves: SW-MOV-5 and 6 Class / Category: 3-B Function: These valves open to supply service water to the residual heat exchang-ers in the event of a failure in the

/ component cooling system. There is no automatic operation.

re81/611213

Basis for Test Frequency: Stroking these valves requires that the service water system be cross-connected with the component cooling water system to provide emergency flov to the residual heat removal heat exchangers. The service water system utilizes water from the Connecticut River. The component cooling water system is a closed system containing potentially contaminated water. Cross-connect-ing could result in releasing nonconforming water to the river and require a major cleanup of system components, which would require that they be taken out of service during the restoration process.

Alternate Testing: We propose to exercise these valves each refueling.

re81/611213

Class / Valva Norms 1 Test Ralief Test Valva Number Category Function Size Type Actuation Position Required Requested Alternate ' Remarks Spent Fuel Pool Cooling 16103-26045, Sch. 8 i SF-CV-812 3-C SFP Pump "A" Disch. Ck. 4 CK :0/C CV/0 SF-CV-866 3-C SFP Pump "B" Disch. Ck. 4 CK C/0 CV/0 '

l l

4 i

t I

1 s

I i

1 9

Change No. 1

! Revision 1 1

, Date 6-1-83

Class / Valve Normal Test Relief Test Vsiv:4 Nurnber Category Function Size Type Actuation Position Required Requested Alternate Remarks a

Containment isolation C:1-TV-1847 2-A Drain Header P41 1.5 CONT A 0 CS 60 sec, to close MT LT X ILRT Pl CC-CV-885 2-AC CC Wtr. to Neutron Shield Tank 1.S CK 0 CV Passive Cooler P60 LT X ILRT i

CC-TV-1831 2-A CC Water from Neutron Shield 1.5 0 CONT A CS 60 sec. to close Tank Cooler P61 MT LT X -ILRT PI CC-V-884 2-AE Neutron Shield Tank F111 Line P63 1.5 CA H LC 7 Passive LT X ILRT VS-TV-1848 2-A Air Monitor Sample from P64 1 CA A 0 CS 60 sec. to close Containment MT 4 LT X ILRT

) PI i VS-SOV-12-1 2-A Air Monitor Sample from P64 .75 CA SOL 0 CS 60 sec. to close Containment MT LT X ILRT P1 VS-CV-1104 2-AC Air Monitor Sample to P65 1 CK 0 CV Passive

Containment LT X ILRT 4

CC-CV-731 2-AC CC Water Supply to Drain P66 3 CK C CV Passive Cooler LT X ILRT CC-FCV-611 2-A CC Water from Drain Cooler P67 3 A 0 CONT CS 60 sec. to close HT LT X ILRT PI Change No. 1 Revision 1 Date 6-1-83

C1 css / Valve Nirmal Test Ralief Test Valva Number Category Function Size Type Actuation Required Requested-Position Alternate Remarks VH-V-522 2-AE Primary Vent Header P71 2 CL H LC Passive LT X ILRT VH-V-525 2-AE Primary Vent Header P71 2 CL H LC Passive LT X ILRT DH-A0V-554 2-A PRT Drain P78 2 CA A 0 CS 60 sec, to close HT LT X ILRT PI WD-HICV-1840 2-A Sump Pump Discharge P13 2 CONT A 0 CS 60 sec. to close HT LT X- ILRT PI WD-TV-1846 2-A Sump Pump Discharge P13 2 CONT A 0 CS 60 sec. to close HT LT X ILRT Pl DH-TV-1843 2-A Vapor Seal Head Tank Drain P14 1.5 CA A 0 CS 60 sec. to close HT LT X ILRT Pl DH-TV-1844 2-A Vapor Seal Head Tank Drain P78/14 2 CA A 0 CS 60 sec. to close HT LT X ILRT PI LM-TV-1811A 2-A Open Bulb Leak Monitoring P23A .375 CA A 0 CS 60 sec. to close HT LT X ILRT Pl Change No.1

. Revision 1 Date 6-1-83

C1 css / Valva Ncrmal Test Relief Tsst Valva Number Category Function Size Type Actuation' Position Required Requested Alternate Remarks' 4

LN-TV-1811B 2-A Open Bulb Leak Monitoring P23A .375 CA A 0 CS 60 sec. to close MT LT X ILRT Pl i LM-TV-1812 2A Closed Bulb Leak Monitoring P23B .375 CA A 0 CS 60 sec. to close MT LT X ILRT Pl q CC-CV-853 2-AC CC Water to RCP Oil Coolers P28 6 CK 0 CV Passive LT X ILRT l CC-TV-1411 2-A CC Water from RCP Oil Coolers P29 6 CONT A 0 0 Passive LT X ILRT.

Pl l CC-FCV-608 2-A CC Water from RCP. Thermal P34 3 CONT A 0 0 Passive i Barrier LT X ILRT I PI CC-CV-721 2-AC CC Water to RCP Thermal P38 3 CK C CV Passive j Barrier LT X ILRT UC-A0V-558 2-A PRT Vent Trip P4 .75 CL A 0 l

CS 60 sec. to close HT

} LT X ILRT Pl I

WC-TV-1845 2-A PRT Vent Trip P4 CA A 0 1 CS 60 sec. to close

MT LT X ILRT PI WC-V-984A 2-AE PRT Sample P4 .5 CA H 0 0 ,

Passive j

LT X ILRT i

4 .

Change No. 1

' Revision 1 Date 6-1-83

Class / Valva Normal Test R.al i e f Test Valys Number Category Function Size Type Actuation Position Required Requested Alternate Remarks SS-TV-950 2-A- Loop and Pressurizer Drain P11A .375 CL A 0 CS 60 sec to close MT

  • LT X ILRT Pl SS-TV-955 2-A Pressurizer Steam Space P118 .375 CL 0 A CS 60 sec. to close-MT LT X ILRT Pl SS-TV-960 2-A Pressurizer Liquid Space P11C .375 CL A 0 CS .60 sec. to close MT LT X ILRT Pl SS-TV-965 2-A Loop 1 Hot Leg P11D .375 CL A 0 CS 60 sec, to close NT LT X ILRT Pl DH-TV-1847A 2-A Valve Stem Leak-Off P12A 1.5 CONT A 0 CS 60 sec. to close HT LT X ILRT .

PI HS-CV-295A 2-AC Containment Space Heating P30 6 CK C CV Passive Supply LT

^

X ILRT BV-1-1B 2-AE Containment Purge Air Exhaust P39 4h BFLY H LC Passive LT X ILRT HC-V-1101 2-AE Containment Purge Air Exhaust P39 8 CA H LC Fassive Bypass LT X ILRT Change No. 1

  • Revision 1

. Date 6-1 _.1

Cleas/ Val va Norms 1 Tast Ralicf Test V.tiva Number Category Function Size Type Actuation Position Required Requested Alternate Remarks BV-1-1A 2-AE Containment Purge Air Supply P40 42 BFLY H LC Passive LT X ILRT PW-CV-140 2-AC Primary Water to Containment P68 2 CK C CV Passive LT X ILRT HC-V-220B 2-AE Space Heating Condensate P22 3 CA H LC Passive Return LT X ILRT PU-V-242 2-AE Refueling Cavity Purification P33 3 CA H LC Passive LT X ILRT PU-V-242A 2-AE Refueling Cavity Purification P33 3 GA H LC Passive LT X ILRT HS-CV-295 2-AC Containment Space Heating P30 6 CK C CV Passive Supply LT X ILRT LD-A0V-204 1-A Letdown Orifice Control P10 2 CONT A 0/C CS 60 sec. to close MT LT X ILRT Pl CH-TV-334 2-A Seal Water Return Line Trip P7 4 CONT A 0 0 Passive LT X ILRT PI OH-TV-1841 1-A Drain Header P41 1.5 CONT A 0 CS 60 sec. to close MT LT X ILRT PI RH-MOV-31 2-AE Aux Containment Spray P80 8 CA M C 0 Passive From Fire System MT LT X ILRT Pi

~

Change No. 1 Revision 1 Date 6-1-83

-. _ - . . .. . - . - - - . . - _ . -- . . . . . -. . . ~ . .

Class / Valve Normal Test R21tof Test

, Valve Number Category Function Sire Type Actuation Position Required Requested Alternate Remarks-VH-V-588 2-AE Air Monitor Purge P23D .75 CA H LC Passive LT X ILRT 3 SA-V-413 2-AE Service Air Supply to P62 2 CA H LC Passive

', Containment LT X ILRT k

0 LD-A0V-202 1-A Letdown Orf fice Control P10 2 CONT 0/C A CS 60 sec. to close MT 1

LT X ILRT Pi LD-A0V-203 1-A Letdown Orifice Control P10 2 CONT A O/C CS 60 sec, to close MT LT X ILRT j PI i

f DH-TV-1842B 2-A Valve Stem Leak-Off P12A 1.5 CONT A 0 i

CS 60 sec. to close HT 3 LT X ILRT

}

SS-V-999A 2-AE Neutron Shield Tank Sample P12B .375 CA H LC Passive LT X ILRT i

j PW-CV-139 2-AC Primary Water to Containment P68 2 CK C CV X Passive LT X ILRT FH-CV-296 1-AC Loop Fill Header Check P69 2 CK C CV X Passive LT X ILRT j SS-50V-150A 1-AE Hydrogen Sample Line P6 .S CL SOL C 0 Passive

, LT X ILRT 4

PI i

1 Change No. 1

' ~

Revision 1

. Date 6-1-83

C1 css / ' Valve Normal Tcst- Relief Tsst V31v9 Number Category Function Size Type Actuation Position Required Requested Alternate Remarks SS-50V-150B 1-AE Hydrogen Sample Line P6 .5 GL SOL C 0 Passive' LT X ILRT Pl SS-50V-150C 1-AE Hydrogen Sample Line P6 .5 CL SOL C 0 Passive LT X ILRT PI SS-50V-1500 1-AE Hydrogen Sample Line P6 .5 CL SOL C 0 Passive LT X ILRT Pl SS-50V-151A 1-AE Hydrogen Sample Line P9 .5 CL SOL C 0 Passive LT X ILRT Pl So-50V-151B 1-AE Hydrogen Sample Line P9 .5 CL SOL C 0 Passive LT X ILRT PI SS-50V-151C 1-AE Hydrogen Sample Line P9 .5 CL SOL C 0 Passive LT X ILRT Pi SS-50V-151 D 1-AE Hydrogen Sample Line P9 .5 CL SOL C 0 Passive LT. X ILRT PI NC-50V-470 2-A Nitrogen Supply to PRT P20 .75 CL SOL C CS 60 sec. to close-HT LT X ILRT PI NG-CV-557 2-AC Nitrogen Supply to PRT P20 .75 CK

  • C CV Passive LT X ILRT VS-CV-1103 2-AC Air Honitor Sample P65 1 CK 0 CV X Passive LT X ILRT Change No. 1 Revision 1

. Date 6-1-83

Class / Valve Norms 1 Test Ralief Test Valva Number Category Function Size Type Actuation Position Required Requested Alternate Remarks BD-TV-1312-1 2A S/C #1. Blowdown P15 1 CA A 0 CS 60 sec. to close PI LT X ILRT BD-V-506 2AE S/G #1 Blowdown P15 2 CL H C LT Passive X ILRT f1D-TV-1312-2 2A S/C #2 Blowdown P16 1 CA A 0 CS 60 sec. to close Pl

. LT X ILRT DD-V-515 2AE S/G #2 Blowdown P16 2 CL H C LT Passive X ILRT BD-TV-1312-3 2A S/C #3 Blowdown P17 1 CA A 0 CS 60 sec. to close Pl LT X ILRT BD-V-522 2AE S/G #3 Blowdown P17 2 CL H C Passive LT X ILRT BD-TV-1312-4 2A S/C #4 Blowdown P18 CA 0 1 A CS 60 sec. to close Pi LT X ILRT BD-V-529 2AE S/C #4 Blowdown P18 2 CL H C Passive LT X ILRT DH-RV-1847 2A Drain Header Relief P41 1.5 REL C CS Passive SRV LT X ILRT CH-RV-332 2AC Seal Water Return Line Relief P7 3 REL C SRV LT X ILRT Change No. 1 Revision 1

. Date 6-1-83

Cisss/ Valve Normal Test Relief Test Vriva Nurr.ber Category Function Size Type Actuation Position Required Requested Alternate Remarks CH-CV-262 2AC Charging Pump Recirculation P7 2 CK O CV/0 LT X ILRT CH-CV-399 1AC RCS Charging P8 3 CK 0 CV/0 Verify to open (CVCS)

LT X Not tested. See Relief Request CH-CV-305A 1AC RCS Seal Water Supply P77 2 CK 0 CV/0 Verify to open (CVCS)

LT X ILRT CH-CV-30SB 1AC RCS Seal Water Supply P76 2 CK O CV/0 Verify to open (CVCS)

LT X ILRT CH-CV-30SC 1AC RCS Seal Water Supply P75 2 CK 0 CV/0 Verify to open (CVCS)

LT X ILRT CH-CV-30SD 1AC RCS Seal Water Supply P74 2 CK 0 CV/0 Verify to open (CVCS)

LT X ILRT FW-CV-192 3AC Aux. Feed Supply P81 1.5 CK C CV Passive LT X ILRT FU-CV-194 3AC Aux, Feed Supply P81 1.5 CK C CV Passive LT X ILRT Ft:-CV-196 3AC Aux. Feed Supply P81 1.5 CK C CV Passive LT X ILRT FU-CV-198 3AC Aux. Feed Supply P81 1.5 CK C CV Passive LT X ILRT SI-V-860 21 Safety Injection to Sump P3 3. CA C 0 Passive LT X Not tested See Relief Request Change No. 1 Revision 1

. Date 6-1-83

l

\

l SYSTEM: VARIOUS CONTAINMENT ISOLATION

1. Class / Category: 2-A, 2A-C Function: To insure containment integrity in the event of a requirement to isolate.

Test Requirement: Exercise all active valves and determine leak tightness.

Basis for Test Frequency: This list consists of valves whose' only safety feature is containment isolation. Those containment isolation valves which are used also for pressure isolation are listed under the particular system in which they operate. Pressure isolation valves are tested in accordance with IWV-3420. Operability testing of these valves during normal plant ,

operation could cause a loss of containment integrity and/or system function if a valve failed in a nonconservative position. Present technical specifications and associ-ated procedures require both an individual and an integrated leakage rate test for containment isolation valves and penetrations. Procedures also require repair of any valve exceeding the leakage limit. The sum of leakage from all penetrations and isolation valves is used to determine an integrated leakage rate which is compared to the maximum allowable leakage rate stated in the technical specifications.

i I

re81/611213

_ ~ _

Alternate Testing: CYAPCO proposes to use existing procedures for leak testing of valves used as containment isola-tion. Modifications to procedures, as agreed upon by CYAPCO and NRC staff, concerning " Appendix J" tests

. and exemptions, will be reflected in this program. All " active" contain-ment isolation valves are demon-strated operable during cold shut-down or reactor refueling at least ohce each 18 months, by verifying that all valves actuate on contain-ment isolation signals in accordance with plant technical specifications.

Passive valves do not require exercising.

SYSTEM: CHARGING RCS

2. Valves: CH-CV-399 Class / Category: -

1-AC Function: Changing to Reactor Coolant System and insure containment integrity in the event of a requirement to isolate.

Test Requirement: Test valve to determine leak tightness.

Basis for Relief Request: CYAPC0 had previously requested an exemption from the Type C testing requirements of Appendix J for the reactor coolant charging (P-8) penetration. This previous report was based on the seismic design of system piping inside containment and the proposed seismic qualification of system piping from the isolation valves of Penetration P-8 to its water source. Subseauent evaluations determined such qualification to be a lengthy and costly effort; therefore, CYAPCO intends to modify Penetration P-8 to permit Type C testing. In the interim, although Penetration P-8 is not currently Type C tested, the isolation valves in this penetration are exposed to water subjected to containment pressure through the vented reactor coolant system during the CILRT.

re81/611213

The valves are exposed to containment pressure in the direction of accident pressure with the back side of the valves depressurized. Further, the portion of the system outside containment is checked for 11auid leakage in accordance with Administrative Technical Specification 3.14; system leakage is accounted for in off-site dose consequence calculations, per 10CFR100. Such leak testing provides additional assurance that the potential for significant containment atmosphere leakage through this penetration is minimized.

CYAPCO believes a schedular exemption from the Type C testing requirements of Appendix J is justified based on the above information, as well as the long lead time for equipnent needed to modify this penetration, the level of design and analysis required, and the need to integrate these modifications with the ultimate resolution of the SEP review of containment isolation valve configurations per 10CFR5 .

Appendiy A. This approaci is consistent with the ALARA philosophy in that it avoids repetitive modifications to the same penetration. The ultimate resolution of this issue will be accomplished within the framework of the Haddam Neck Plant ISAP.

Reference:

1. Docket No. 50-213 from J. F.

Opeka to C. I. Grimes, "10CFR50, Appendix J - Request for Exemption," dated March 12, 1986.

2. Docket No. 50-213 from J. F.

Opeka to C. I. Grimes, "10CFR50, Appendiy J. Revision I to Request for Exemption," dated July 15, 1986.

re81/611213

e .

SYSTEM: SAFETY INJECTION

3. Valves:- SI-V-860 Class / Category: 2-A Function: Safety injection to reactor cavity fill.

Test Requirement: Test valve to determine leak tightness.

Basis for Relief Request: Valve SI-V-860 is a 3" locked close manual gate valve that isolates the cavity fill line. The cavity fill line branches off the high pressure safety injection header inside containment. This valve is not LLRT tested, but is tested during the ILRT in the accident direction with air on the containment side of the valve. The downstream side of the valve is covered with liquid, but i

vented during the ILRT. This is consistent with expected post-LOCA conditions because valve SI-V-860 is in a vertical run with liquid trapped above it due to testing of the high pressure safety injection system.

The recent PRA analysis of the penetration resulted in a total risk (due to noncompliance with Appendix J) of 0.9 man-rem over the life of the plant. Of the total risk, 0.3 man-rem is due to valve SI-V-860 not being tested. It is assumed that SI-V-860 leaks I

5 percent of the containment air ,

volume per day, which is greater than twice the worst measured containment isolation valve as-found leakage at the plant. Clearly, the

! risk due to this untested valve is very small. Since the ILRT does leak test this valve, the actual risk will be much less than

, 0.3 man-rem.

i I

i re81/611213

CYAPCO believes a schedular exemption from the Type C testing requirements of Appendix J is justified based on the above information as well as the long lead time for equipment needed to modify this penetration, the level of design and analysis required, and the need to integrate these modifications with the ultimate resolution of the SEP review of containment isolation valve configurations per 10CFR50, Appendix A. This approach is consistent with the ALARA philosophy in that it avoids repetitive modifications to the same penetration. The ultimate resolution of this issue will be accomplished within the framework of the Haddam Neck Plant ISAP.

Reference:

1. Docket No. 50-213 from J. F.

Opeka to C. I. Grimes, "10CFR50, Appendix J - Request for Exemption," dated March 12, 1986,

2. Docket No. 50-213 from J. F.

Opeka to C. I. Grimes, "10CFR50, Appendix J. Revision 1 to Request for Exemption," dated July 15, 1986.

re81/611213

Cicss/ Valva Normal Test Ralief Tsst Valve Number Category Function Size Type Actuation- Position Required Requested Alternate Remarks E Valve SI-V-104A 2-E "A" LPSI Pump Suction isol. 12 CA H LO ET SI-Flow St-V-104B 2-E "B" LPSI Pump Suction isol. 12 CA H LO ET SI-Flow SI-V-105A 2-E "A" LPSI Pump Discharge Isol. 10 CA H LO ET - SI-Flow SI-V-105R 2-E "B" LPSI Pump Discharge Isol. 10 CA H LO ET SI-Flow SI-V-102 2-E LPSI Discharge to RHR System 10 CA H LO ET SI-Flow SI-FCV-875 2-E WS1 Miniflow 1 CON A LO ET Min. Recir. Flow

$1-V-873 2-E RHR to Core Deluge System 6 CA H LO ET SI-Flow SI-V-854A 2-E "A" HPSI Pump Suction 1 o1. 8 CA H LO ET SI-Flow SI-V-8 stb 2-E "B" HPSI Pump Suct.on Isol. 8 CA H LO ET SI-Flow SI-V-855A 2-E "A" WSI Pump Discharge Isol. 6 CA .H LO ET SI-Flow SI-V-855B 2-E "B" HPSI Pea.p Discharge Isol. 6 CA H LO ET SI-Flow SI-HOV-24 2-E RWST Outlet to St & CVCS 16 CA M LO ET St-Flow RH-V-23A 2-E Containment Spray Isolaticn 8 CA H LO ET Spray Flow BA-V-399 3-E BA Tank Outlet isolation 2 CA H LO ET BA Flow BA-V-352 3-E "A" BA Pump Suction isol. 2 CA H LO ET BA Flow l

l BA-V-359 3-E "B" BA Pump Suction Isol. 2 CA H LO ET BA Flow RH-V-29A 2-E Charcoal Filter Spray Manual Isol. 3 CA H LO ET Fire BA-V-362 3-E "B" BA Pump Disch. Isol.- 1.5 CL H LO ET BA-Flow

,. Change No. 1 Revision 1

- Date 6-1-83

Clats/ Valva Normal Test Ralief Test-Valve Number Category Function Size Type Actuation Position Required Requested Alternate Remarks BA-V-364 3-E "A" BA Pump Disch. Isol. 1.5 CL H LO ET BA Flow BA-V-360 3-E BA Filter inlet Isol. 2 CL H LO ET Flow BA-V-371 3-E BA Filter Outlet Isol. 2 CL H LO ET Flow CH-V-261 2-E "A" Ch. Pump Suction isol. 6 CA H' LO ET Flow CH-V-270 2-E "B" Ch. Pump Suction Isol. 6 CA H LO ET Flow CH-V-264 2-E "A" Ch. Pump Disch. Isol. 3. CA H LO ET Flow CH-V-273 2-E "B" Ch. Pump Disch. Isol. 3 CA H LO ET Flow CH-HOV-292A 1-E Charging Line to Loop No. 2 3 CA H 0 ET Blocked Open RH-HOV-874 2-E RHt to RWST X-Connection 6 s H LC ET Blocked Closed RH-V-78SA 2-E "A" RHR Pump Suction Isol. 8 CA H LO ET Flow RH-V-78SB 2-E "B" RHR Pump Suction isol. 8 CA H LO ET Flow RH-V-789A 2-E "A" RHR Pump Discharge Isol. 8 CA H LO ET Flow s

RH-V-7890 2-E "B" RHR Pump Discharge Isol. 8 CA H LO ET Ficw RH-V-791A 2-E "A" RHR HX Supply Isol. 8 CA H LO ET Flow RH-V-7918 2-E "B" RHR HX Supply isol. 8 CA H LO ET Flow RH-V-794A 2-E "A" RHR HX Return isol. 8 CA H LO ET Fl ow RH-V-7948 2-E "B" RHR HX Return isol. 8 CA H LO ET Flow RH-FCV-796 2-E RHR HX Flow Control 10 Butterfly A LO ET Blocked Open Change No. 1 Revision 1

. Date 6-1-83

C1 cat / Vsive Norma 1 Tsst Ralief Tcct Vil n Number Category Function Size Type Actuation Position Required Requested Alternate Remarks RH-FCV-602 2-E RHR HX Bypass Flow Control 8 Butterfly A LC ET Blocked Closed RH-V-724 2-E RHR to RWST 6 CA H LO ET Flow RH-NOV-21 2-E RWST to RHR 10 GA H LC ET isolate

~

Change No. 1 Revision 1 Date 6-1-83

. Class / Valva Normal Test Ralief Test Valve Number - Category function Sire Type Actuation Position Required Requested Alternate Remarks CC-V-760A 3E Isolate CC Water from Heat 10 CA H LC Long-Term Cooling Exchanger CC-V-7608 3E isolate CC Water from Heat 10 CA H LC Long-Term Cooling Exchanger CC-V-764A 3E Isolate CC Water from Heat 10 CA H LC Long-Term Cooling Exchanger CC-V-764B 3E isolate CC Water from Heat 10 CA H LC Long-Term Cooling-Exchanger CC-V-765A 3E RHR Pump Recirculation from 1 CL H LO Long-Term Cooling Heat Exchanger CC-V-765B 3E RHR Pump Recirculation from 1 CL H LO Long-Term Cooling Heat Exchanger CC-V-766A 3E RHR Pump Recirculation from 1 CL H LO Long-Term Cooling Heat Exchanger CC-V-766B 3E RHR Pump Recirculation from 1 CL H LO Long-Term Cooling Heat Exchanger 53-V-250A 3E SW Outlet from RHR Heat 10 BUT H LO Per Set Exchanger 53-V-250B 3E SW Outlet from RHR Heat 10 BUT H LO Per Set Exchanger RH-V-805 2E R M Discharge Loop 2 Vent .75 CL H LC CIV-RHR Integrity RH-V-806 2E RHR Discharge Loop 2 Vent .75 CL H LC CIV-RHR-integrity RH-V-778 2E RHR Suction Loop 1 Vent .75 CL H LC Cl-Boundary RHR-Integrity Change No. 1

  • Revision 1 Date 6-1-83

Ciczs/ Vs1va Normal TIst R;11sf Tsst V' Ive Nurnber Category Function Size Type Actuation Position Required Requested Alternate Remarks RH-V-779 2E RHR Suction Loop 1 Vent .75 CL H LC Cl-Boundary RHR-Integrity SI-V-860 2E Si to Cavity Fill 3 CL H LC Cl-Boundary DC-V-984A 2E Pressurizer Relief Tank Vent CIV .5 CL H LC Cl-Boundary WC-V-136 2E Pressurizer Relief Tank Vent .5 Ball H LC Cl-Boundary SS-50V-150A 2E Pass CIV .5 CL SOV LC CIV-Pass SYS-Integrity SS-50V-1508 2E Pass CIV .5 CL SOV LC CIV-Pass SYS-Integrity SS-50V-150C 2E Pass CIV .5 CL SOV LC CIV-Pass SYS-Integrity SS-50V-1500 2E Pass Civ .5 GL SOV LC CIV-Pass SYS-Integrity SS-V-152 2E Pass Vcat/ Test Values .5 Needle H LC CIV-Boundary SS-V-153 2E Pass Ver.t/ Test Values .5 Needle H LC CIV-Boundary SS-50V-151A 2E Pass Civ .5 CL SOV LC CIV-Pass SYS-Integrity SS-SOV-151B 2E Pass CIV .5 CL SOV LC CIV-Pass SYS-Integrity SS-50V-151C 2E Pass CIV .5 CL SOV LC CIV-Pass SYS-Integrity SS-50V-151D. 2E Pass CIV .5 CL SOV LC CIV-Pass SYS-Integrity SS-V-154 2E Pass Vent / Test Values .5 Needle H LC CIV-Boundary SS-V-155 2E Pass Vent / Test Values .5 Needle H LC CIV-Boundary LD-V-384A 2E RCS Letdown Vent .75 CL H LC CIV-Boundary DH-V-316B 2E Valve Steam Leak-Off Vent .5 Ball H- LC CIV-Boundary

~

Change No. 1

. Revision 1 Date 6-1-83

C1ces/ Valve . Normal Tast Rallef Tott valve Number Category Function Size Type Actuation Position Required Requested Alternate Remarks DH-V-316C 2E valve Steam Leak-Off Vent .5 Ball H LC - CIV-Boundary 55-V-999A 2E Neutron Shield Tank CIV .375 Needle H LC CIV 55-V-9968 2E Neutron Shield Tank Vent .375 CA H LC CIV-Boundary WD-V-172 2E Containment Sump Discharge Vent .750 Ball H LC CIV-Boundary W-V-174 2E Contairunent Sump Discharge Vent .500 Ball H LC CIV-Boundary FU-V-402 2E Aouillary Feedwater Supply Vent 750 CA H LC CIV-Boundary Iti-V-315 2E Pressurizer Relief Tank Drain 2 Ball H - LC CIV-Boundary Vent DH-V-317 2E Pressurizer Relief Tank Drain .5 Ball H LC CIV-Boundary Vent BD-V-515 2E S/C Blondown Civ 2 CL H LC CIV ID-V-506 2E S/C Blondose Civ 2 CL H LC CIV BD-V-522 2E S/C Bi + CIV 2 CL H LC CIV ID-V-529 2E S/C Blondown CIV 2 CL H LC CIV NC-V-471 2E N2 to Pressurizer Relief Tank .750 CL H LC CIV-Boundary HC-V-2208 2E Space Heating, Condensate CIV 3 CA H LC CIV HC-V-212B 2E Space Heating, Condensate Vent .750 CA H LC CIV-Boundary LM-V-713 2E Leak Monitoring, open Bulb Vent .375 Needle H LC CIV-Boundary LM-V-719 2E Leak Monitoring, Close Bulb Vent .375 Needle H LC CIV-Boundary I

l l Wi-V-588 2E Air Monitor Purge .750 CA H LC CIV i

~

. Change No. 1 Revision 1

  • Date 6-1-83

_ _ _ - . _ . . . _ . _ - - - - - _ - - . . . _ _ . . - - - - ~

Class / Volve Normal Test R211sf Test Vrive Mus6er Category Function Size Type Actuation Position Required Requested Alternate Ramarks SI-V-863A 2E WSI-Rear .750 CL H LC CIV SI-V-8638 2E WSI-Rear 750 CL H LC CIV SI-V-863C 2E WSI-Rear 750 CL H LC CIV l SI-V-863D 2E WSI-Rear .750 CL H LC i

CIV I

! CC-V-852A 2E CCW to RCP Oil Coolers .500 CL H LC CIV-Boundary CC-V-CS7A 2E CCW to RCP Oil Coolers .750 CL H LC CIV-Boundary IS-V-296 2E Space Heating Steam vent 1 CA H LC CIV-Boundary PU-V-242 2E Refueling Cavity Purification 3 CA H LC CIV l

PU-V-242A 2E Refueling Cavity Purification Vent 3 Diaph H LC CIV-Boundary i

PU-V-243 2E Refueling Cavity Purification Vent 3 CA H LC CIV-Boundary CC-V-842 2E CCW from RCP Thermal Barrier Vent .750 CL H LC CIV BV-1-1D 2E Purge, Exhaust 42 Butterfly H LC CIV HCV-1101 2E Purge, Exhaust 8 Butterfly H LC CIV BV-1-1A 2E Purge, Supply 42 Butterfly H LC CIV DH-V-310 2E Loop Drain Header Vent .500 Ball H LC CIV-Boundary SA-V-413 2E Service Air to Containment 2 CA H LC CIV CC-V-884 2E Neutron Shield Tank Fill 1\ Diaph H LC CIV CC-V-884A 2E Neutron Shield Tark Fill Vent .750 CL H LC CIV-Boundary VS-V-166 2E Air Honitor Sample from Con- 1 CA H LC CIV-Boundary tainment Vent .

~

Change No. 1

  • Revision 1

. Date 6-1-83

C1 css / Valys Normal Test "Relisf Tes t Valve Number Category Function Size Type Actuation Position Required Requested Alternate Remartis VS-V-154 2E Air Honitor Sample to Con- 1 CA H LC CIV-Boundary tafrument Vent PW-V-600 2E Primary Water to Contairment .500 Ball H LC CIV-Boundary Vent CA-V-501 2E Instrument Air Supply Vent 15 CA H LC CIV-Boundary CA-V-502 2E Instrument Air Supply Vent .500 CL H LC CIV-Boundary u4-V-522 2E Primary Vent Header 2 CA H LC CIV TH-V-525 2E Primary Vent Header 2 CA H LC CIV VH-V-524 2E Primary Vent Header Vent .500 CA H LC CIV-Boundary RH-V-807 2E Contalrument Sump to IltSt 750 CA H LC CIV-Boundary Suction Vent RH-V-808 2E Contairument Sump to RHR Suction 8 CA H LC CIV-Boundary Vent RH-V-36 2E Au=. Contalrument Spray from .500 CL H LC CIV-Boundary Fire Supply Vent' P14-MOV-31 2E Aux. Containment Spray from -8 CA HOV LC ClV Fire Supply Change No. 1 Revision 1

. Date 6-1-83

TABLE IWV-3 SAFETY / RELIEF VALVE SETPOINTS Service Sta. No. Valve Type Setpoint (Tol.)

Press. Safety Valve PR-SV-584 3" Safety 2485 11%

Press. Safety Valve PR-SV-585 3" Safety 2535 11%

Press. Safety Valve PR-SV-586 3" Safety 2585 21%

RWST Recirculation SI-RV-870 1" Relief 1500 21%

Relief to RWST RH-RV-715 3" Pelief 500 t10 psig LD Relief to VCT (HP) LD-RV-205 3" Relief 500 210 psig SG No. 1 Main Steam Safety PS-SV-11 6" Safety 985 10 psi SG No. I Main Steam Safety MS-SV-12 6" Safety 1015 t 1%

SC No. 1 Main Steam Safety MS-SV-13 6" Safety 1025 1 1%

SG No. 1 Main Steam Safety MS-SV-14 6" Safety 1035 1 1%

SC No. 2 Main Steam Safety MS-SV-21 6" Safety 985 1 10 psi SG No. 2 Fain Steam Safety MS-SV-22 6" Safety 1015 ! 1%

SG No. 2 Main Steam Safety MS-SV-23 6" Safety 1025 2 1%

SG No. 2 Main Stean Safety MS-SV-24 6" Safety 1035 1 1%

SG No. 3 Pain Steam Safety MS-SV-31 6" Safety 985 ! 10 psi SC No. 3 Main Steam Safety MS-SV-32 6" Safety 1015 t 1%

SG No. 3 Main Steam Safety MS-SV-33 6" Safety 1025 2 1%

re81/611213

a7

+. .

= -

69 - N ", ei g

-6 u @ .

g

, SC No. 3 Main Steam Safety MS-SV-34 6" Safety 1035 1% <(

  1. <e

) 6" Saf'ty SG No. 4 Main Steam Safety MS-SV-41 s

e 985 10 psi- f./*

SG No. 4 Main Steam Safety MS-SV-42 6" Safety 1015 1 1%

SC No. 4 Main Steam Safety MS-SV-43 6" Safety 1025 t 1% i c;,'

~

SC No. 4 Main Steam Safety MS-SV-44 6" Safety o}035!1%

, , w SV for Aux. Feed Pump "A" MS-SV-1216A ,

3" Safity 650 1 10 psig (

SV for Aux. Feed Pump "B" MS-SV-1216B 3" Safety 650 10 psig ,

, Low Pressure Pressurizer Relief PR-RV-587 - 3" Relief , 380 1 10 psff ,

a low Pressure Pressurizer Relief PR-RV-588 3" Relief ,

380 1 10 psig j SV for Drain Header DH-RV-1847 2" Relief 150 t'10 patg.

] Seal Water Return Line Relief CH-PV-332 3" Relief 140 t 10 psiR '-

Meter Pump Suction Line Relief BA-RV-279 .5" Relief 150 !.10 peig' PR-A0V-568 Control Air CA-RV-838A .25" Relief 100 2 10.psif v '

w PR-A0V-570 Control Air CA-RV-838B .25" Relief 100 1 10 psig

,. n.

5 Containment Instrument Air CA-RV-719 .25" Relief 145 2 0/3 psigj '

S. ..

Containment Instrument Air CA-RV-720 .25" Relief 145 ! 0/5 psig  ?

  • )

Containment Instrument Air CA-RH-721 .25" Reliaf 145 1 0/5_psig D 4 j a: . m 1

Containment Instrument Air CA-RV-829 .5" Relief 170 1 3'pi g ,-

j,$ -

SW/ Component Cooling to RHR CC-RV-763A l'.5" Relief 150
le isig i :s l SW/ Component Cooling to RHR CC-RV-763B 1.5" Relief 150'! Icipsig .,

Meter Pump Discharge 1.5" Relief s' i

. CH-RV-280 2735 t 1% 0 l

m.e i Loop Pressure Ecual. Line* RC-CV-509 1.5" Lelisf 200 AP . of w ,. .

toop Pressure Equal. Line* RC-CV-523 1.5" Relief 200' 4 P , ' '

p7 [

Loop Pressure Equal. Line* RC-CV-536 1.5" Relfef 200-A Pl<

~

Loop Pressure Equal. Line* RC-CV-545 1.5" Relief 200 4 P t .

, *This test may not be possible due to pipe geometry. A test will be attempted y

) in 1987 outage .

J re81/611213 .

r y -a- c-s-.- v--w -e y y ,,,-,--mv ---+4, -r-,. _ +~ma---,y,---r---wr--myyr--rv'w ww' ww g---- yevw- *v~CT -+-Ww' wav v'* - w w wr +==vriryw---mvww v-ytrm+

f. .

.d Es ',

N }ll j% Y -

.. rr + . *

.t ,

",, s

  1. , *, #E',*/

i LEGEND FOR VALVE TESTING n

'i Q -

Exersice valve (full stroke) to verify satisfactory operation

[ .4 [. per Section XI, IW-3411 except as noted in IW-3412a and p . ,-

% lb 3416.

-- s.  :+

IN ',. ,

h ,p LT' --

Valves are leak tested per Section XI Article IW-3420.

.. a

/

'n

[ ILRT - Containment Isolation Valves are leak tested in conjunction

~'g -

b, with containment integrated leak test.

. * ~ <?

F Nr -

Stroke time measurements are taken per Section XI Article IW-

't *

[j ,

3410 for power operated valves.

)N?- l ,

t i I #

l'[ *' *

, CV -

Exercise check valves to the position required to fulfill their function per Section IW 3521 except as noted in

[ [' -

IW 3522.

.- < ~

~ r SRV -

Safety and relief valves are tested per Section XI i'

Article IW-3510.

1 .-

1' p i

.' / ,ET -

Verify and record valve position before operations are

,'~**.

i.,,

pe'rformed and after operations are completed, and verify that

/ ,

N '.; , valve is locked or sealed.

f CS -

Exercise valve (full stroke) to verify satisfactory operation at cold shutdown, as noted per Section IW 3416, 3522 and

(.

s '- '

3412.

'*h  !

. .a. .,

m

'h

, o RR -

Exercise valve (full stroke) to verify satisfactory operation at reactor refueling based on Relief Request.

PI -

Visually observe, every two years or less, actual valve posi-tion to confirm that remote valve position indications accurately reflect valve operation, IW-3300.

1 FT -

Remove actuator power from valves with fail-safe actuators to confirm that the valve travels to its fail-safe position per IW-3415.

f re81/611213

g_ .

V

+ .

REVIEW LEAK OF TESTING REQUIREMENTS FOR PRESSURE ISOLATION VALVES ST-CV-862A/B/C/D - Valves are subjected to type "C" test as containment isolation check valves and a 150# 1eakage test for pressure isolation valves.

SI-V-863A/B/C/D - Valves are subjected to a 150# 1eakage test for pressure isolation valves and a Type "C" containment isolation check valve.

SI-MOV-861A/B/C/D - Each valve is subjected to a 150# 1eak test.

SI-MOV-871A/B and SI-CV-872A/B are velded to one another with no pro-vision for leak testing CD-MOV-871A/B using reactor coolant pressure.

During the system hydrotest at startup, SI-MOV-871A/B are open, thus, subjecting SI-CV872A/B to reactor coolant pressure between 350-375 psig.

Leakage is measured at that time.

l l

l RH-MOV-803,804,780,781_ are individually leak tested during the system hydrotest using reactor coolant at 350-375 psig.

\-

l FH-MOV-578-535-522-508 piping is designed for reactor coolant tempera-l ture and pressure heck to charging pumps. No tests are made.

l l

l l

l re81/611213

.o e'

o .'

FH-CV-296 is subjected to a Type "C" test for containment isolation valves. Piping is designed for reactor coolant temperature and pressure, back to the charging pumps. No pressure isolation test is required.

DH-MOV-562,507,521,534,544 and DE-V-502,516,529,539, and 525 are not individually tested. If leakage occurs, it is cooled by the drain cooler and piped back by way of FH-MOV-310 or FH-V-311 to either the volume control tank or to the primary drain tank, both of which are monitored and alarmed at the main control board. These valves are not required to be tested.

FH-MOV-310,FH-V-311 are individually leak tested at 150# for pressure isolation valves.

Loop fill and loop drain valves (FH and DH) are listed in Table IWV.

These valves are not used in bringing the reactor to a safe shutdown condition and are not normally used to mitigate the consequences of an l

l accident, however, these valves (fill only) may be used as backup for small break LOCA. These valves are normally used to fill and/or drain loops during refueling operations.

l l

i l

l l

l l

[ re81/611213

r i

cf Attachment 3 Description of ECCS Full Flow Test February 1987