F CONNECTICUT YANKEE EMERGENCY CORE COOLING SYSTEM FULL FLOW TEST JANUARY 11, 1986
\\;,
b l
l Prepared By:
f$,fh fllYlst P.(/J. Pikul' l
Reviewed By:
).T bdh7'4)
G F6
% T. DiMa o 6 af, [$
Approved By:
4 w K.} Schmidt 8702090412 870204 DR ADOCK 05000213 PDR i
9 0 4
TABLE OF CONTENTS Page Table of Contents......................
i Abstract 1
Conclusions.........
2 Recommendations.......................
3 Description of Full Flow Test.
4 Test Parameters 4
Data Flow Points....................
5 Test Instrumentation 7
Ultrasonic Flow System.................
7 Pressure Instrumentation................
7 RWST Water Level Instrumentation............
8 Computer Data Acquisition System............
8 A.C. Power Supply Units 9
Data Computation 10 i
\\"
Equations 10 High-Pressure Safety Injection 10 Low-Pressure Safety Injection......
13 Sample Calculation 14 References 90 Appendix I "A" HPSI Retest Calculation I-1 Appendix II Error Analysis................
11-1 i
t TABLE OF FIGURES Figure Page 1.
System Flow Diagram............
16 2.
HPSI Pump Pressure Elevations...........
17 3.
LPSI Pump Pressure Elevations...........
17 4.
' Data Acquisition System..............
18 5.
"A" HPSI Pump Curve..
19 6.
"B" HPSI Pump Curve................
20 7.
"A" LPSI Pump Curve................
21 8.
"B" LPSI Pump Curve................
22 i4 l
ii
9 TABLES Table Page 1.
Test Results...................
23 2.
"A" HPSI Pump Data................
24 3.
"B" HPSI Pump Data................
26 4.
',' A" LPSI Pump Data................
27 5.
"B" LPSI Pump Data................
28 6.
ECCS Test Data Printout 29 g) t
)
iii i
t
9 8
ABSTRACT 1
Connecticut Yankee Technical Specification, Section 3.6, " Core Cooling Systems" requires that the four Emergency Core Cooling System (ECCS) pumps meet specific head and flow criteria.
The first test of these pumps under full flow conditions was performed on January 11, 1986.
Full flow tests were conducted on each of the pumps to determine head versus flow characteristics and to generate pump curves to confirm the Technical Specification requirements.
Pump performance data was then compared using the manufacturer's data as a reference for future testing.
A retest was performed under full flow conditions on the "A" HPSI pump on April 10, 1986.
This test was requested because modifications were made on the pump.
Appendix I shows the total dynamic head calculation for the data accumulated with a head versus flow curve, indicating an improvement 4
in pump performance.
Since the periodic testing of the ECCS pumps will be required, this test report will serve as a basis for subsequent testing.
In support of the ECCS Full Flow Test, the following personnel are acknowledged for their efforts and assistance:
Marcel J. Ranieri Inservice Inspection Department, CY Glen H. Cox Information Resources Group, NUSCO Mark A. Ballou Reliability Engineering, NUSCO James J. Neiweem Inservice Inspection Department, CY Rich Waggoner Fossil / Hydro Production., Middletown Bob Curtis Instrumentation & Control Department, CY i
i l
\\
4 CONCLUSIONS The performance of the four ECCS pumps verified that each pump operated above its requirements stated in Section 3.6 of the CY Technical Specifica-tions.
The test also demonstrated check valve operability per Section 4.10 of the Technical Specifications.
Flow tests were individually conducted on each pump.
Two separate tests were performed on the "A" High Pressure Safety Injection (HPSI) pump because of unsteady flow readings during the initial run.
Results obtained from the second test sequence demonstrated more consistent data, as a result of more steady flow conditions between flow points.
The data recorded on the "B" Low Pressure Safety Injection (LPSI) pump showed rather wide data scatter at one flow point'.
This resulted from an unsteady flow profile because of a misadjustment of the discharge valve.
Results still exceeded the requirements even with the occurrence of these erratic data points.
^
. }
i l
RECOMMENDATIONS Prior to performing a full flow test, the calibration and installation of pressure and flow instruments should be completed at least one month before the test date.
This would allow a simulated flow test, preferably on recirculation flow, to be conducted to check system instrumentation and computer software for integrity.
Continued performance testing of the ECCS pumps with the plant in Mode 5 would provide a consistent means of testing.
Yo
l DESCRIPTION OF FULL FLOW TEST A full flow test was conducted on each of the four ECCS pumps on January 11, 1986 to determine pump performance characteristics.
The two HPSI and two LPSI pumps were tested per plant surveillance procedure SUR 5.7-106, Revision 1.
Each pump was individually tested by pumping water from the Refueling Water Storage Tank (RWST) into the Reactor Coolant System and filling the Pressurizer.
Precautions were taken to prevent from overfilling the Pressurizer by limiting the fill volume to 90 percent with provisions for possible overfill into the P'ressurizer Relief Tank.
Safety concerns for this test were addresssed in References 1 and 2.
To document pump performance, specific pressure and flow parameters were monitored using a computer data acquisition system.
Data was compiled to f
calculate Total Dynamic Head (TDH) in feet and to generate graphical k-results of Total Dynamic Head with respect to Discharge Flow rate (Q) in gallons per minute.
Test results were compared to the Technical Specifica-tion, requirements (Reference 3) fo.r each pump as listed in Table 1.
This table lists tne Technical Specification requirements and the results from the January 11 test and April 10 "A" HPSI retest.
Test results were listed based upon the required flow rate for each pump.
l l
TEST PARAMETERS:
During the testing of the ECCS pumps, four (4) pipe flow rates, eight (8) pressures, one RWST water level, and one differential pressure were monitored.
For the HPSI system, flow readings were measured on the HPSI 12-inch common suction line from the RWST and HPSI 1-inch common recirculation line.
For clarity, the word " common" means that each pump utilizes the s l'
1 same pipe.
The discharge flow was derived by taking the difference between the suction and recirculation flow measurements.
One inlet and outlet pressure was also measured on each HPSI pump.
The LPSI system parameters were monitored by obtaining flow readings on the LPSI 18-inch common suction line from the RWST and LPSI 2-inch common recirculation line.
One pressure reading was taken on the LPSI 18-inch common suction line, since no provision exists on either individual pump suction inlet.
Because of the elevation of this common suction pressure, the reading had to be corrected for actual pump inlet pressure.
Pressure readings were taken on each pump discharge outlet with one differential pressure reading on the LPSI common discharge line.
Data from the differential pressure transmitter was recorded but not used for the total dynamic head analysis.
The RWST water level was also monitored throughout the flow test.
This provision was an alternate means of obtaining pump discharge flow rate if a flow instrument had malfunctioned.
.(,
DATA FLOW POINTS:
Several pump discharge flow points were used as a means of obtaining head versus flow results.
The test sequence was initiated by first, operating each pump on recirculation flow with the discharge valve closed and reading all pressure and flow parameters.
To accumulate all test parameters, several scans were made using a computer function key.
This scanning function, which was initiated manually, allowed the computer data acquisition system to monitor all parameter channel inputs and store the information on disk.
These scan points are represented in small groups as shown on each pump curve.
After obtaining recirculation flow data, the pump discharge valve was positioned to produce a predetermined discharge pressure.
Several data scans were taken using the computer function key.
The discharge valve was then opened to a second pressure setting and data was again scanned..-
4 The test on each pump was completed after data was collected at recircula-tion and four other flow poi.nts..
The computer accumulated the data and calculated the instantaneous Total Dynamic Head upon command.
For a given discharge flow there was a respective total dynamic head.
These points were plotted using a computer graphics program in the Statistical Analysis System (SAS). A regression polynominal was chosen to best fit the measured head versus flow points and generate a curve for each pump.
All data, even that which may not be at steady state conditions, is plotted and used for the development of the head vs. flow curve.
The use of all data points is considered to be conservative.
The polynominal curve fit represents the best fit of the data ac' quired, but does not imply continuous head / flow data for use in redesign or future Design Basis Accident LOCA Analyses.
Each graph shows the test results with' the manufacturer's data overlayed for reference purposes.
Vertical and horizontal dashed reference lines on each graph represent Technical Specification requirements, with the point of inter-section being the acceptance criteria for the pump's output, k.
The data recorded on the "B" LPSI pump showed wide data scatter at one flow point.
This resulted from an unsteady flow profile because of a misadjustment of the discharge gate valve.
During the test, test engineers had observed this flow instability due to the operation of the valve.
Because the computer system scans all channel inputs and cannot isolate nonessential data, the information from nonrunning pumps was also recorded.
Only pertinent data for each pump being tested is listed in Tables 2 through 5.
The computer printout of test data is listed in Table 6.
TEST INSTRUMENTATION ULTRASONIC FLOW SYSTEM:
The following flow instruments were used to monitor suction and recircu-lation flow on each of the ECCS pumps during testing (see Figure 1 for locations):
1.
Contro1otron* Model 960 Four Channel Flow Computer System (S/N:
0378/0809).
2.
HPSI common recirculation flow; Controlotron* 15S10 flow transducers and scale module, (0-100 gpm) (S/N:
0807, 0832).
3.
HPSI common suction flow; Controlotron" 12SS40 flow transducers and scale module, (0-1,750 gpm) (S/N:
809-90183, 0834).
4.
LPSI common recirculation flow; Controlotron* 2SS40 flow
\\-
transducers and scale module, (0-50 gpa) (S/N:
0808, 0833).
5.
LPSI common suction flow; Controlotron* 1855.375 flow transducers and scale module, (0-5,500 gpm) (S/N:
809-90461,0835).
PRESSURE INSTRUMENTATION:
The following pressure instruments were used to monitor suction and discharge pressure on each of the ECCS pumps; (see Figures 1-3 for locations):
1.
"A" HPSI suction pressure; Bristol-Babcock
- pressure transmitter (0-30 psi) (S/N:
2.
"B" HPSI suction pressure; Bristol-Babcock
- pressure transmitter (0-30 psi) (S/N:
e -
s 3.
"A" HPS discharge pressure; Bristol-Babcock" pressure trans-mitter (0-2,000 psi) (S/N:
4.
"B" HPSI discharge pressure; Bristol-Babcock" pressure trans-mitter (0-2,000 psi) (S/N:
5.
"A" and "B" LPSI suction pressure; Bristol-Babcock" pressure
. transmitter (0-30 psi) (S/N:
6.
"A" LPSI discharge pressure; Bristol-Babcock" pressure trans-mitter (0-500 psi) (S/N:
7.
"B" LPSI discharge pressure; Bristol-Babcock" pressure trans-mitter (0-500 psi) (S/N:
80A-1543).
8.
LPSI discharge differential pressure; Bristol-Babcock" pressure transmitter (0-800" H O) (S/N:
2 RW5T WATER LEVEL INSTRUMENTATION:
To monitor RWST water level during pump testing, the level transmitter in the tank was used.
This level was recorded for information purposes and also as a back-up parameter to determine discharge flow.
1.-
Refueling Water Storage Tank Level; Foxboro level transmitter (0-420" H 0) (S/N:
LT - 1806B).
2 COMPUTER DATA ACQUISITION SYSTEM:
The essential parameters for determining head versus flow characteristics f'or each pump were channeled into a data acquisition system and analyzed.
The test results for each pump were tabulated and then reduced to generate head versus flow curves.
s.
1 l
The data acquisition system consisted of the following:
1.
Hewlett Packard 9836CS Keyboard and Monitor (S/N:
2250A02279).
2.
Hewlett Packard 3497A Data Acquisition Unit (S/N:
2340A12868).
3.
Hewlett Packard 2671G Printer (S/N:
2301A09721).
A block diagram showing the computer data acquisition system is shown on Figure 4.
AC POWER SUPPLY UNITS:
Two AC power supply units were used to supply 24 volts to each of the Bristol-Babcock pressure transmitters.
These voltage supplies were installed by the Instrumentation & Control Department.
e
- w 1._ -
DATA COMPUTATION The computer data system used for the ECCS Flow Test included a program to calculate pump head.
For the pressure transmitters, calibration data consisting of millivolts versus pressure in psig was modeled in a Statistical Analysis System (SAS) program on the mainframe computer in Berlin.
This established a linear curve representation for pressure readings which the computer code utilized for converting a transmitter voltage to a pressure in psig.
For the flow readings, analog voltage output connections were wired from the Controlotron flow computer to the Hewlett Packard Data Acquisition unit.
A flow range in feet per second was first determined for each pipe, then the analog indicator on the Controlotron* flow computer was set for each range.
A conversion from voltage to gallons per minute was made in the computer code for the total dynamic head analysis.
Once the total dynamic head was calculated for each data point, the
't._2 result was graphed versus the flow rate recorded at that instant of time.
Graphical results for each pump are shown in Figures 5 through 8.
A root-mean-square (rms) error analysis was performed for the test data to observe the variations of the data points.
This analysis is shown in Appendix II.
EQUATIONS:
High Pressure Safety Injection (HPSI)
The equation for Total Dynamic Head from Reference 4 is:
2 2
Total Dynamic Head (TDH) = 144 (P2 - P ) + (Z2 - 2 ) + (v2 - v1) 1 1
29 (1) m The pump inlet and outlet elevations were assumed equal because of only a s
1.5-inch difference (References 5 and 6):
Zi=Z2 (2)
A conversion from velocity (v) to flow rate (Q) from Reference 4 gives:
,,.408 0 (Q = constant)
(3)
Substituting:
2 - P ) + (.408)2 02 "1
l' TDH = 144 (P t
G d*
P ) + 2.578 x 10-3 Q2 "1 l'
TDH = 144 (P 2
t w
d4 d4 o
1 Y
tu But:
Discharge flow (Q) = Qs - Qr Therefore:
~
.TDH (Feet) = 144 (P2 - P ) + 2.578 x 10-3 (Qs - Qr)2 1
1 t
d d
o t
Where:
P = Pump suction pressure (psig) t P = Pump discharge pressure (psig) 2 Zi = Pump inlet pipe centerline elevation (feet)
Z
= Pump outlet pipe centerline elevation (feet) 2 Q = Recirculation flow rate (gpm) r
Q = Suction flow rate (gpm) s d, = Pump inlet pipe inside diameter (7.981 inches) d, = Pump outlet pipe inside diameter (5.761 inches)
= Specific weight of borated water (62.4 lb/ft3) m g = Acceleration of gravity (32.17 ft/sec )
2 Note:
The specific weight of clean water was used, since there was a negligible difference for borated water.
Je O
P
\\
l l
12 -
9 Low Pressure Safety Injection (LPSI)
The equation for Total Dynamic Head (Reference 4) is:
2 2
Total Dynamic Head (TDH) =
144 (P2 P)+(22 - Z ) + (v2 - vi) 1 1
m 2g (1)
The pump inlet and outlet elevations are (References 7 and 8):
Z
=Z t
2 (2)
A conversion from velocity (v) to flow rate (Q) (Reference 4) gives:
o =.408 Q (Q = constant)
(3)
The following equation is a conversion for the actual pump inlet pressure because of the elevation of the common suction line:
L P
= P "+ (6 4) h = P/ + 3.47 t
t (4)
Substituting:
- (P '+ 3.47)] + (Z2 - Z1) + (.408)2 g2 l -
l'
[2 TOH =
t w
2g dj dj.
But:
Discharge flow (Q) = (Qs - Qr)
Therefore:
I TDH (Feet) = 144 [P2 - (Pi+3.47)] + 2.578 x 10-3 (Qs - Qr)2 1
1 0
0 0
1 l
13 -
Where:
P = Pump. suction pressure (psig) t P'= Suction line pressure (psig) t P2 = Pump discharge pressure (psig)
Z = Pump inlet pipe centerline elevation (feet) 1 Z2 = Pump outlet pipe centerline elevation (feet)
Q = Recirculation flow rate (gpm) r Q = Suction flow rate (gpm) s d9 = Pump inlet pipe inside diameter (12.0 inches) d, = Pump outlet pipe inside diameter (9.75 inches)
= Specific weight of borated water (62.4 lb/ft )
3 m
g = Acceleration of gravity (32.17 ft/sec )
2 SAMPLE CALCULATION:
To show how total dynamic head was calculated using these equations, the
.following sample calculation will serve as an example.
Data was used for
,(,
a particular discharge flow setting on the "A" HPSI pump.
Data for Time:
16:45:22 (See Table 6, p. 37.)
"A" HPSI Pump:
Discharge pressure (P ) = 1309.0 psig 2
Suction pressure (P )
t 15.5 psig
=
Suction flow rate (Qs) 751.2 gpm
=
Recirc. flow rate (Qr) 32.9 gpm
=
TDH (Feet) = 144 (P
~
P ) + 2.578 x 10" (Qs - Qr)2 1
1 2
t 4
4 0
0
. 0 1
-_ 144 (1309 - 15.5) + 2.578 x 10-3 (751.2 - 32.9)2' 1
1 62.4 (5.761)4 (7.981)4
,TDH = 2985.8 feet-l
9 (Because of calculator round-off, this TDH value is slightly less than the computer listing.)
Q = Qs - Qr = 751.2 - 32.9 = 718.3 gpm A point on the graph for the "A" HPSI pump, Figure 5, is represented by a TDH of 2985.1 versus a flow rate (Q) of 718.3.
5
.}
4 1
I 1
1 1
4 1
1 !
IP R
SM 3
E P. P U
C C
0 I
UD F
N A
RT W
h9 S
O.
I IP F
ASM 3
s U
C e
P. P I
0 0
0 0
4 OSS 2
5 7
I P 3
3 SM 3
BPI I
S C
C I
P I
OS O
8 1
0 4
r, S
I P S
3 SM 3
s O
2 C
APU E
r O
1 HP nU nU 0
O 1
WS S
]
3 T
S W
r R
U$9 mE* S$E*
mEE*"
'5e
u
._JE 4
4 9
P, h
8 T -- - J o
- - --q--
]
r, 2*
O e.kum
<s i<<,i HPSI PRESSURE ELEVATIONS FIGURE 2 l
i P,-
M h
y Ps h
P' i
N -- - A
)
t
(
c 3
z, Ys U *5" s
s i
LPSI PRESSURE ELEVATIONS FIGURE 3
SUCTION SUCTION SUCTION HPSI A HPSI B LPSI A LPSI B DISCH.
DISCH.
DISCH.
DISCH.
i
)
Sg u
e o
o -
p i
R I
2@
4 EE i
7 3
CONTROLOTRON a o HP 3947 DATA m
FLOW
=
d ACQ.
y COMPUTER UNIT U
l HP 9836C
)
~
COMMON COMMON COMPUTER SUCTION SUCTION KEYBOARD COMMON COMMON RECIRC.
RECIRC.
MONITOR IIPSI FLOW LPSI FLOW t
I i
PRINTER i
i
a, ee e
.e
. *s-,
CONNECTICUT YANKEE 1986 ECCS FLOW TEST T
A HPSI PUMP G
JANUARY 11,1986 s
i 3400-4-
i I
I s
i 3200-5 i
~
1
~
l i
3000-e i
I l
T 2800-u i
,y f
0 i
T A
j,t i
L 2600-
+
i
'M i
-l a-D i
Y l
N 2400-T i
A i
y
- 3. -
I
~$l --_-------
ML--
l c 2200-('
H T* *
- l E
22 (o PT.
A 2000-D g.,ye g p i l
1 I
n 1800-l E
i E 1600-j(;s,j i
T i
i 1400d l
!)
s
(
I
<l I
I v
1200-i g
/
1
\\
{
f l
1000-i i-i -
f O
400 800 1200 1600 2000 2400 2800 FLOW RATE (GPM) a
- TEST DATA A
NOTE: Consult Reliability Engineering prierf to use for subsequent DBA analysis.',
FIGURE 5 1
~ q 7
(
p y
.,-..,,,,.,--n n
h*>
~
p
c y..m e, -
e
(
.~
-C.1.
CONNECTICUT YANKEE 1986 ECCS FLOW TEST B HPSI PUMP JANUARY 11,1986
,j3400-o
- i.,
I
);
l
{y,4't,
3:00-i' 2000-1 l
4.
1 T 2800-l 0
.T g
A.,
J L 2600-i i
D i
Y i
N 2400-A M
i I
I C 2200-s ss.sr; E
A 2000-12Fo n.I ME8 $pm. g D
1 n 1800-g
?g i
I ;
F l
E L,
E 1600-T I
1400-I 3
i
+*
r
^
Q.
[ '
s 1200- r
/
I r.t l
/
I 1000-0 000 800 1200 1600 2000 2400 2800 FLOW RATE (GPM)
!\\'
...... TEST DATA 7 -;
NOTE: Consult Reliability Engineering prior to use for subsequent DBA enclysis.
FIGURE 6
" 20-L
CONNECTICUT YANKEE 1986 ECCS FLOW TEST A LPSI PUMP JANUARY 11,1986 740.
I 3
I i
720-i 700-i I
- IS8o, l
T A
i L 660-i 0
i Y
t
, i N 640-A i
i M
I i
C 620g
(,
H j
l E
A 600-D i
I 1
I n 580------------------------------
Tite.h. 5p ac, F
E E 560-gg e pr i
i T
7000 3 pm.
l i
i l
540 a
i l
520 l
1 500-0 1000 2000 3000 4000 5000 6000 7000 FLOW RATE (GPM)
- ** * *
- TEST DATA NOTE: Consult Relicbility Engineering pr;cq to use for subsequent DBA cnclysis.
FIGURE 7 CONNECTICUT YANKEE 1986' ECCS FLOW TEST B LPSI PUMP JANUARY 11,1986 740-,
i i
I 720-i i
I l
700-1 l
T 680-i o
e
- i T
i A
i L 660-0 i
Y i
N 640-A i
M t
I i
C 620-i l
(
H E
i A 600-D h
i i
E l
n 580-I
[
m.sm; E 560-ISO FT.
i T
5' Coo gpm.1 t
I 540-i i
1 l
520-s I
f 500-0 1000 2000 3000 4000 5000 6000 7000 FLOW RATE (GPM)
- * * * *
FIGURE 8 _ - -
TABLE 1 TEST RESULTS PUMP TECHNICAL SPECIFICATIONS TEST RESULTS TEST DATE "A" HPSI 2,250 ft. @ 1,750 gpm 2,300 ft. @ 1,750 gpm January 11, 1986 "A" HPSI 2,250 ft. @ 1,750 gpm 2,560 ft. @ 1,869 gpm April 10, 1986 "B" HPSI 2,250 ft. @ 1,750 gpm 2,416 ft. @ 1,750 gpm January 11, 1986 "A"
LPSI 580 ft. @ 5,000 gpm 628 ft. @ 5,000 gpm January 11, 1986 "B"
LPSI 580 ft. @ 5,000 gpm 652 ft. @ 5,000 gpm January 11, 1980 NOTE:
Consult Reliability Engineering prior to use for subsequent 08A analysis.
.ro
,i i%
e !
,n.
TABLE 2 "A" HPSI PUMP OATA TEST DATA MANUFACTURER DATA
(FT)
(GPM)
(FT) 0.
3220.7 0.
3250 0.
3237.7 250 3156 0.
3198.1 500 3094 0.
3212.6 750 3000 286.8 2970.4 1000 2938 412.1 2980.2 1250 2813 527.3 2975.5 1500 2625 587.9 2976.9 1750 2406 683.1 2986.5 2000 2187 696.8 2982.8 2250 1875 711.3 2984.3 2500 1531
,e
(,,
718.1 2986.3 2750 1125 715.8 2984.4 718.3 2985.6 1176.5 2730.9 1222.4 2727.9 1241.0 2729.0 1251.0 2727.5 1279.7 2727.3 1294.2 2729.4 1305.8 2729.3 1301.4 2727.7 1305.7 2726.8 1427.5 2532.6 NOTE:
Consult Reliability Engineering prior to use for subsequent DBA analysis.
- See Reference 9 -.. _
TABLE 2 (Cont'd)
TEST DATA MANUFACTURER DATA
- DISCH. FLOW
(FT)
(GPM)
(FT) 1461.1 2533.1 1492.7 2533.1 1512.2 2534.6 1518.4 2537.1 1521.7 2532.7 1521.8 2533.1 1521.7 2536.4 1614.3 2283.4 1707. 8 2282.4 1729.1-2282.5 1741.3 2282.6 1762.4 2285.0 1
't 1780.4 2284.1 1780.4 2286.0 1780.4 2285.5 1791.2 2255.6 NOTE:
Consult Reliability-Engineering prior to use for subsequent DBA analysis.
- See Reference 9 l
I._.
TABLE 3 "8" HPSI PUMP DATA TEST DATA MANUFACTURER DATA
(FT)
(GPM)
(FT) 0.
3379.7 0.
3250 725.7 3153.9 250 3156 740.7 3147.3 500 3094 755.0 3144.7 750 3000 1270.2 2888.2 1000 2938 1280.2 2882.3 1250 2813 1302.0 2881.9 1500 2625 1323.6 2660.0 1750 2406 1390.5 2658.5 2000 2187 1464.3 2662,3 2250 1875 1746.6 2417.3 2500 1531 1762.3 2415.1 2750 1125
\\,
1765.8 2416.6 NOTE:
Consult Reliability Engineering prior to use for subsequent DBA analysis.
- See Reference 9 _ _ - - -
TABLE 4 "A"
LPSI PUMP OATA TEST DATA MANUFACTURER DATA
(FT)
(GPM)
(FT)
O.
715.6 0.
730 O.
715.6 1000 725 2968.0 685.3 3000 700 3077.0 687.5 5000 648 4773.1 645.1 7000 525 4795.4 644.6 5605.9 605.2 5744.9 604.8 5420.9 573.0 6364.4 573.9
~
t NOTE:
Consult Reliability Engineering prior to use for subsequent OBA analysis.
- See Reference 9 __. _.
TABLE 5 "B"
LPSI PUMP DATA TEST DATA MANUFACTURER DATA
- DISCH. FLOW TOH OISCH. FLOW TDH (GPM)
(FT)
(GPM)
(FT)
O.
715.6 0.
730 0.
737.1 0.
730 0.
736.7 1000 725 0.
733.8 3000 700 5576.2 687.3 5000 648 5406.1 706.9 7000 525-4634.3 675.9 4422.7 674.7
. 4503.1 618.4 4626.9 617.7 6629.3 594.4 S
6696.0 595.9 6681.7 595.3 6673.9 602.6 6652.1 597.8 NOTE:
Consult Reliability Engineering prior to use for subsequent DBA analysis.
- See Reference 9
- 2S:-
f
m 1AD L. F. Q ECCS Tccc Data Princout RE'_:0RDE3 DATE:
li Jan 1986 RECORDED TIME: 15: 43:00 I
HPSI 1
PUMP A
-I PUMP B
%?'
I FLOW PRESSURE FLOW PRESSURE SUCT RECIRC SUCT DISCH SUCT RECIRC SUCT DISC-GA_5 16.6 33.5 14.0 1409.6 16.6 33.5 14.4 37.3 23304G TOTAL DYNAMIC HEAD (HPSI-A) :
3220.7 TOTAL DYNAMIC HEAD (HPSI-B) :
52.7 RECORDED DATE: 11 Jan 1986 RECORDED TIME: 16: 43:00 I
LPSI I
I PUMP A I
PUMP B RNST I
FLOW PRESSURE FLOW PRESSURE I
SUCT RECIRC SUCT DISCH SUCT RECIRC SUCT DISCn GA.
0.0
.1 11.7 15.6 0.0
.1 11.7 14.2 2330r.
JEL,n P IS :
.6 TOTAL DYNAMIC HEAD (LPSI-A) :
1.0 TOTAL DYNAMIC HEAD (LPSI-B) OUT OF RANGE
' RECORDED DATE: 11 Jan 1986 RECORDED TIME: 16:43:04 HPSI PUMP A I
PUMP B RWST FLOW PRESSURE FLOW PRESSURE "5bdi"kdd[kd"5Udi '"'b[bbH 5bbi kkU5kb
'hbdf b[bCh G5L5
~
16.6 33.5 13.3 1416.3 16.6 33.5 14.0 37.4 233095 TOTAL DYNAMIC HEAD (HPSI-A) :
3237.8 TOTAL DYNAMIC HEAD (HPSI-B) :
54.0
' k _.0ED DATE: 11 Jan 1986 RECORDED TIME: 16: 43:04 I
LPSI I
- I PUMP A I
PUMP B RWS!
mas r., e U.ont c)
ECCS Tcat Data Printout FLOW PRESSURE LOW
.__ _______________________________-______________________ PRESSURE SUCT RECIRC SUCT DISCH SUCT RECIRC
._..________________________________________-__________SUCT DISCH GALS 1.0
.1 11.7 15.5 0.0
.I it.7 14.2 2??095
) ELTA P IS :
.7 TOTAL DYNAMIC HEAD (LPSI-A) :
I.0 TOTAL DYNAMIC HEAD (LPSI-B) OUT OF RANGE
?ECORDED DATE: 11 Jan 1986 RECORDED TIME: 16: 43:11 HPSI PUMP A I
PUMP B RWST FLOW PRESSURE FLOW PRESSUR
._______-_________-________________________--________________-____E I
SUCT RECIRC SUCT DISCH SUCT RECIRC SUCT
._____________________________________-__-_____-____-___________DISCH GALS 16.7 33.6 20.4 1406.2 16.7 33.6 13.7 37.5 233048 TOTAL DYNAMIC HEAD (HPSI-A) :
3198.1 TOTAL DYNAMIC HEAD (HP$I-B) :
55.0 (s
'?ECORDED DATE: 11 Jan 1986 RECORDED TIME: 16: 43: 11 LPSI PUMP A I
PUMP B RWST
'_______ FLOW PRESSURE FLOW PRESSURE I
SUCT RECIRC SUCT DISCH SUCT RECIRC SUCT DISCH
._____-__-_________-____________________-_____ __-___________-____._______ GALS 0.0
.1 i1.7 15.6 0.0
.1 11.<
4.?
233048 aELTA'P IS :
.5 TOTAL DYNAMIC HEAD (i_PS I-A ) :
1.1 TOTAL DYNAMIC HEAD (LPSI-B) OUT OF RANGE ECORDED DATE: 11 Jan 1986 RECORDED TIME: 16:43:14 PUMP A I
PUMP B FLOW PRESSURE FLOW PRESSURE RyST
_30-
~ _ _
.__ _ n..,
ECCS Tcat Data Printout SUCT RECIRC SUCT DISCH SUCT RECIRC
._______________________.______________________________SUCT DISC-GA E 16.6 33.6 15.0 1407.1 16.6 33.6 14.3 37.6 233079 DYNAMIC HEAD (HPSI-A) :
3212.6 T0 int DYNAMIC HEAD (HPSI-B) :
53.7
- ECORDED DATE: 11 Jan 1986 RECORDED TIME: 16: 43: 14 LPSI
.____________________________________________________________________________.__I PUMP A I
PUMP B RWST FLOW PRESSURE FLOW P
___________________________________________________________RESSURE I
SUCT RECIRC SUCT DISCH SUCT RECIRC SUCT GA_S
_______________________________________________________________DISCH________
0.0
.1 11.7 15.6 0.0
.1 11.7 14.2 233075-ELTA P IS :
.6 TOTAL OYNAMIC HEAD (LPSI-A> :
1.O TOTAL DYNAMIC HEAD (LPSI-B) OUT OF RANGE Eh... SED DATE: 11 Jan 1986 RECORDED TIME: 16: 44:11 PUMP A I
PUMP B RWST FLOW PRESSURE FLOW PRESSURE
___________________________________________________________________________I SUCT RECIRC SUCT DISCH SUCT RECIRC SUCT DISCH GA
______________________________________________________________,____________LS 320.2 33.4 16.2 1303.3 320.2 33.4 14.6 36.4 232343 TOTAL DYNAMIC HEAD (HPSI-A) :
2970.4 TOTAL DYNAMIC HEAD (HPSI-B) :
50.3 ECORDED DATE: 11 Jan 1986 RECORDED TIME: 16: 44:11 LPSI
_______________________________________________________________________________I PUMP A I
PUMP B RWST FLOW PRESSURE FLOW PRESSURE I
RECIRC SUCT DISCH SUCT RECIRC SUCT DISCH GA s
___________________________________________________________________________LS 0.0 0.0 11.7 15.6 0.0 0.0 11.7 14.1 232843
_31
TABLE 6 (Cont'd)
ECCS Tsat Dsta Printout DELTA P IS :
.6 TOTAL DYNAMIC HEAD (LPSI-A) :
I.1 TOTAL DYNAMIC HEAD (LPSI-B) OUT OF RANGE RECORDED DATE: 11 Jan 1986 RECORDED TIME: 16: 44:14 I
HPSI I
I PUMP A I
PUMP B.
RWST I
FLOW PRESSURE FLOW PRESSURE I
SUCT RECIRC SUCT DISCH SUCT RECIRC SUCT DISCH GA_$
445.1 33.0 14.8 1306.1 445.1 33.0 15.0 36.5 232779 TOTAL DYNAMIC HEAD (HPSI-A) :
2980.2 TOTAL DYNAMIC HEAD (HPSI-B) :
49.9 RECORDED DATE: 11 Jan 1986 RECORDED TIME: 16: 44:14 I
LPSI I
'd '
PUMP A I
PUMP B RWST P*
FLOW PRESSURE FLOW PRESSURE I
SUCT RECIRC SUCT DISCH SUCT RECIRC SUCT DISCH GAL?
0.0 0.0 11.7 15.6 0.0 0.0 11.7 14.2 232779 DELTA P IS :
.5 TOTAL DYNAMIC HEAD (LPSI-A>.:
1.0 TOTAL DYNAMIC HEAD (LPSI-B) OUT OF RANGE I
. RECORDED DATE: 11 J RECORDED TIME: 16: 44: 21 l___________________an 1986 I
HPSI I
!I PUMP A I
PUMP B RC FLOW PRESSURE FLOW PRESSURE I
l SUCT RECIRC SUCT DISCH SUCT RECIRC SUCT DISCH GALS l
' 9. 3 33.0 15.1 1'304.3 560.3 33.0 14.4 35.8 232716 r
I TOTAL DYNAMIC HEAD (HPbq B>
(HP A) :
2975,5 49.8 TOTAL DYNAMIC HEAD
_32-l 1
l
TABLE 6 (Cont'd)
ECCS Tcat Data Printout RECORDED DATE: 11 Jan 1986 RECORDED TIME: 16: 44: 21
'I LPSI I
I PUMP A I
PUMP B RWE~
I FLOW PRESSURE FLOW PRESSURE I
SUCT RECIRC SUCT DISCH SUCT RECIRC SUCT DISCH GALS 0.0 0.0 11.6 15.6 0.0 0.0 11.7 14.2 2327*6 DELTA P IS :
.5 TOTAL DYNAMIC HEAD (LPSI-A) :
1.1 TOTAL DYNAMIC HEAD (LPSI-B) OUT OF RANGE
' RECORDED DATE: 11 Jan 1986 RECORDED TIME: 16: 44: 24 I
HPSI I
I PUMP A I
PUMP B RWST I
FLOW PRESSURE FLOW PRESSURE I
i T
RECIRC SUCT DISCH SUCT RECIRC SUCT DISCH GALG 620.9 33.0 15.3 1305.1 620.9 33.0 15.0 35.8 232669 TOTAL DYNAMIC HEAD (HPSI-H) :
2976.9 TOTAL DYNAMIC HEAD (HPSI-B) :
48.5 LRECORDED DATE: 11 Jan 1986 RECORDED TIME: 16: 44:24 LPSI I
I PUMP A I
PUMP B R;,S T I
FLOW PRESSURE FLOW PRESSURE I
SUCT RECIRC SUCT DISCH SUCT RECIRC SUCT DISCh GA_S 0.0 0.0 11.7 15.5 0.0 0.0 11.7 14.2 232669 DELTA P IS :
.5 TOTAL DYNAMIC HEAD (LPSI-A) :
1.0 TOTAL DYNAMIC HEAD (LPSI-B) OUT OF RANGE
=.
TABLE 6 (Cont'd)
ECCS T0at D:ta Printout 9ECORDEbDATE: 11 Jan 1986 RECORDED TIME: 16: 44: 41
~
I HPSI I
I PUMP A I
PUMP B RE:S~
I FLOW PRESSURE FLOW PRESSURE I
SUCT RECIRC SUCT DISCH SUCT RECIRC SUCT DISCH GALS 715.9 32.8 13.8 1307.7 715.9 32.8 14.8 35.1 232496 TOTAL DYNAMIC HEAD (HPSI-A) :
2986.5 TOTAL DYNAMIC HEAD (HPSI-B) :
47.6 RECORDED DATE: 11 Jan 1986 RECORDED TIME: 16: 44:41 I
LPSI I
I PUMP A I
PUMP B RWST I
FLOW PRESSURE FLOW PRESSURE I
SUCT RECIRC SUCT.
DISCH SUCT RECIRC SUCT DISCH GALS 0.0 0.0 11.6 15.6 0.0 0.0 11.7 14.t 232490 tDfLiH P IS :
.8 TOTAL DYNAMIC HEAD (LPSI-A) :
1.1 TOTAL DYNAMIC HEAD (LPSI-B) OUT OF RANGE
- RECORDED DATE: 11 Jan 1986 RECORDED TIME: 16: 44:45
.I HPSI I
- I PUMP A I
PUMP B RWST I
FLOW PRESSURE FLOW PRESSURE I
SUCT RECIRC SUCT DISCH SUCT RECIRC SUCT DISCH GALS 729.7 32.8 16.4 1308.7 729.7 32.8 14.7 34.8 232433 TOTAL DYNAMIC HEAD (HPSI-A) :
2982.8 TOTAL DYNAMIC HEAD (HPSI-B) :
47.1 R...DED DATE: 11 Jan 1986 RECORDED TINE: 16: 44:45
- I_______--______u_______________________________________________________________I LPSI I
PUMP A I
PUMP B RWST
_34_
TABLE 6 (Cont'd)
ECCS Tsat Data Princout I
. FLOW PRESSURE FLOW PRESSURE I
"5bCi""k5C}R5"5UCi"bi5'^5"'"5UCi'k!CikC'"5bCiI"6}55E"~ ~ ~ ~ GhE5"
.0 0.0 11.6 15.5 0.0 0.0 11.7 14.1 23243?
JELTA P IS :
.7 TOTAL DYNAMIC HEAD (LPSI-A) :
1.0 TOTAL DYNAMIC HEAD (LPSI-B) OUT OF RANGE RECORDED DATE: 11 Jan 1986 RECORDED TIME: 16: 44:52 I
HPSI I
I PUMP A I
PUMP B RWSi I
FLOW PRESSURE FLOW PRESSURE I
"5UCT~ " 555kC~~"5U5T b[5CE'""5UCT
~"~
~ " 5C5kC~"5UUT b[55U"" GEL 5
~"~
' ~~
R R
744.1 32.8 14.5 1307.5 744.1 32.8 13.8 34.8 232354 TOTAL DYNAMIC HEAD (HPSI-A) :
2984.3 TOTAL DYNAMIC HEAD (HFSI-B) :
49.1 i.
~
iRECORDED DATE: 11 Jan 1986 RECORDED TIME: 16: 44: 52 PUMP A I
PUMP B RWST i!
FLOW PRESSURE FLOW PRESSURE I
SUCT RECIRC SUCT DISCH SUCT RECIRC SUCT DISCH GALS 0.0 0.0 11.6 15.5 0.0 0.0 11.7 14.2 232354 i3 ELTA P IS :
.6 TOTAL DYNAMIC HEAD (LPSI-A) :
.9 TOTAL DYNAMIC HEAD (LPSI-B) OUT OF RANGE RECORDED DATE: 11 Jan 1986 RECORDED TIME: 16: 45:01 LI HPSI I
4 PUMP A I
PUMP B RWSi I
FLOW PRESSURE FLOW PRESSURE I
SUCT RECIRC SUCT DISCH SUCT RECIRC SUCT DISCH GALS
TABLE 6 (Cont'd)
ECCS Ts":t Dats Printout 751.1 33.0 14.8 1308.6 751.1 33.0 14.5 34.7 232243 TOTAL DYNAMIC HEAD (HPSI-A) :
2986.3 TOTAL DYNAMIC HEAD (HPSI-B) :
47.4 RECORDED DATE: 11 Jan 1986 RECORDED TINE: 16:45:01 I
LPSI I
I PUMP A I
PUMP B RWSi I
FLOW PRESSURE FLOW PRESSURE I
SUCT RECIRC SUCT DISCH SUCT RECIRC SUCT DISCH GALS 0.0 0.0 11.6 15.5 0.0 0.0 11.7 14.1 232243 DELTA P IS :
.7 TOTAL DYNAMIC HEAD (LPSI-A) :
1.0 TOTAL DYNAMIC HEAD (LPSI-B) OUT OF RANGE R$.<DED DATE: 11 Jan 1986 RECORDED TIME: 16:45:12 I
HPSI I
I PUMP. A I
POMP B RWSi I
FLOW PRESSURE FLOW PRESSURE I
SUCT RECIRC SUCT DISCH SUCT RECIRC SUCT DISCH GALS 748.8 33.0 14.6 1307.6 748.8 33.0 13.2 35.1 232117 TOTAL DYNAMIC HEAD (HPSI-A) :
2984.4 TOTAL DYNAMIC HEAD (HPSI-B) :
51.3 RECORDED DATE: 11 Jan 1986 RECORDED TIME: 16: 45:12 I
LPSI I
I PUMP A I
PUMP B RWST I
FLOW PRESSURE FLOW PRESSURE I
- T RECIRC SUCT DISCH SUCT RECIRC SUCT DISCH GALS 0.0 0.0 11.6 15.5 0.0 0.0 11.7 14.1 232117.
uwou v wva uf ECCS Tcat Data Printout
'JELTA P'IS :
.5
- TOTAL DYNAMIC HEAD (LPSI-4) :
1.0 TOTAL DYNAMIC HEAD (LPSI-B) OUT OF RANGE RECORDED DATE: 11 Jan 1986 RECORDED TIME: 16: 45:22 I
_______________________________________________________________________________I_
I PUMP A I
PUMP B RWS1 I
FLOW PRESSURE FLOW PRESSURE
____________________________________________________________________________I SUCT RECIRC SUCT DISCH SUCT RECIRC SUCT DISCH GALG 751.2 32.9 15.5 1309.0 751.2 32.9 14.6 35.6 23202?
TOTAL DYNAMIC HEAD < HPSI-A > :
2985.6 TOTAL DYNAMIC HEAD (HPSI-B) :
49.1
! RECORDED DATE: 11 Jan 1986 RECORDED TIME: 16:45:22 t.p51
?.
PUMP A I
PUMP B RWST I_'b FLOW
' PRESSURE FLOW PRESSURE I
SUCT RECIRC SUCT DISCH SUCT RECIRC SUCT DISCH GALS 0.0 0.0 11.6 15.5 0.0 0.0 11.7 14.1 232023 jELTA P IS :
.6 TOTAL DYNAMIC HEAD (LPSI-A) :
1.0 TOTAL DYNAMIC HEAD (LPSI-B) OUT OF RANGE
- tECORDED DATE:.11 Jan 1986 RECORDED TIME: 16: 46:01 I
HPSI I
'I PUMP A I
PUMP B RWST i:
FLOW PRESSURE FLOW PRESSURE I
SUCT RECIRC SUCT DISCH SUCT RECIRC SUCT DISCH GA
_______-__-____-__________________________.________ _-________. ____________LS 1208.4.
31.9 13.6
'1196.2 1208.4 31.9 14.2 34.7 231297 TOTAL DYNAMIC HEAD (HPSI-A) :
2730.9 TOTAL DYNAMIC HEAD (HPSI-B) :
49.2.-
Lust t. 6 U,ont c)
ECCS Tact Dsts Printout RECORDED DATE: 11 Jan 1986 RECORDED TIME: 16: 46:01 3
LPSI I
I PUMP A I
PUMP B RWS-FLOW PRESSURE FLOW PRESSURE I
'hUbi kkb[kb'~bbbf' bIbbH 5bbi R565kd5UUT' bI555
'UkL5 DELTA P IS :
.6 TOTAL DYNAMIC HEAD (LPSI-A, 1.0 TOTAL DYNAMIC HEAD (LPSI-B) OUT OF RANGE RECORDED DATE: 11 Jan 1986 RECORDED TIME: 16: 46:05 I
HPSI I
I PUMP A I
PUMP B RWS' I
FLOW PRESSURE FLOW PRESSURE I
"_T RECIRC SUCT DISCH SUCT RECIRC SUCT DISCF GALS
/
a.,
1254.3 31.9 13.8 1195.0 1254.3 31.9 14.3 34.6 23121S TOTAL DYNAMIC HEAD (HPSI-A) :
2727.9 TOTAL DYNAMIC HEAD (HPSI-B) :
48.9 RECORDED DATE: 11 Jan 1986 RECORDED TIME: 16: 46:05 I
LPSI I
I PUMP A I
PUMP B RWST I
FLOW PRESSURE FLOW PRESSURE I
SUCT RECIRC SUCT DISCH SUCT RECIRC SUCT DISCF GALS DELTA P IS :
.7 TOTAL DYNAMIC HEAD (LPSI-A) :
1.0 TOTAL DYNAMIC HEAD (LPSI-B) OUT OF RANGE RECORDED DATE: 11 Jan 1986 RECORDED TIME: 16: 46: 11. _ -
ECCS Tcet Dnta Princout I
HPSI I
I PUMP A I
PUMP B R *. 5 -
I FLOW PRESSURE FLOW PRESSURE I
SUCT RECIRC SUCT DISCH SUCT RECIRC SUCT DISCH GALS 1272.7 31.7 13.6 1195.3 1272.7 31.7 14.3 34.2 231092 TOTAL OYNAMIC HEAD (HPSI-A) :
2729.0 TOTAL DYNAMIC HEAD (HPSI-B) :
48.0
' RECORDED DATE: 11 Jan 1986 RECORDED TIME: 16: 46: 11 I
LPSI I
I PUMP A I
PUMP B
.RWST
' I FLOW PRESSURE FLOW PRESSURE I
~~
~~~~
~~~~
~~~~
~~
~~~~
5bdT k5d[Rb 5UUT b[5dH 5UCT R5d[kd'~~5Ubi b[5hH GkL5
"~~~
0.0 0.0 11.6 15.5 0.0 0.0 11.6 14.t 23'0N c
rA.
P IS :
.5 TOTAL DYNAMIC HEAD (LPSI-A) :
1.0 TOTAL OYNAMIC HEAD (LPSI-B) OUT OF RANGE
.4ECORDED DATE: 11 Jan 1986 RECORDED TIME: 16: 46:14 I
HPSI I
I PUMP A I
PUMP B RWST I
FLOW PRESSURE FLOW PRESSURE I
SUCT RECIRC SUCT DISCH SUCT RECIRC SUCT DISCH GALS 1282.8 31.8 13.9 1194.9 1282.8 31.8 14.3 34.0 231013 TOTAL DYNAMIC HEAD (HPSI-A> :
2727.5 TOTAL DYNAMIC HEAD (HPSI-B) :
47.6 P
DED DATE: 11 Jan 1986 RECORDED TIME: 16: 46: 14 I
LPSI I
I FLOW PRESSURE FLOW PRESCURE I
TABLE 6 (Ccnt'd)
ECCS Tact Data Printout SUCT RECIRC SUCT DISCH SUCT RECIRC SUCT DISC.-
G4LS 0.0 0.0 11.6 15.5 0.0 0.0 11.6 14.1 23:0:3 DELTA P IS :
.5 TOTAL DYNAMIC HEAD (LPSI-A) :
1.0 TOTAL DYNAMIC HEAD (LPSI-B) OUT OF RANGE RECORDED DATE: 11 Ja,n 1986 RECORDED TIME: 16: 46:22 1
HPSI I
PUMP A I
PUMP 5 RWST FLOW PRESSURE FLOW PRESSURE I
"505T R555RC 5U5T 6[555 "~~5 CT REC 555 "56CT 65555"""5AL5"
~~"
" ~ ~
~~~
~
'"~
~
~~~~
1311.3 31.6 14.4 1195.3 1311.3 31.6 14.1 33.6 230871 TOTAL DYNAMIC HEAD (HPSI-A) :
2727.3 TOTAL DYNAMIC HEAD (HPSI-B) :
47.3 l
l 4 ~
lECORDED DATE: 11 Jan 1986 RECORDED TIME: 16: 46:22 LPSI I
FLOW PRESSURE FLOW PRESSURE I
SUCT RECIRC SUCT DIGCH SUCT RECIRC SUCT DISCH GALS 0.0 0.0 11.6 15.5 0.0 0.0 11.6 14.1 230871
)ELTH P IS :
.4 TOTAL DYNAMIC HEAD (LFSI-A) :
1.0 TOTAL DYNAMIC HEAD (LPSI-B) OUT OF RANGE
- ECORDED DATE: 11 Jan 1986 RECORDED TIME: 16: 46:25 HPSI I
PUMP A I
PUMP B RWST FLOW PRESSURE FLOW PRESSURE I
UUbi""RkbiRb""5Ubi""bi5bH~~~"5UCi
~kECiRb""5Ubi'~"b}5bH bA[
r ECCS Tcat D2tn Printsut 1325.6 31.4 13.2 1194.9 1325.6 31.4 14.8
.33.8 230777 TOTAL DYNAMIC HEAD (HPSI-A) :
2729.4 TOTAL DYNAMIC HEAD (HPSI-B) :
46.2
/
RECORDED DATE: 11 Jan 1986 RECORDED TIME: 16: 46:25 I
LPSI I
I PUMP A I
PUMP B RWST I
FLOW PRESSURE FLOW PRESSURE I
SUCT RECIRC SUCT DISCH SUCT RECIRC SUCT DISCH GALS 0.0 0.0 11.6 15.5 0.0 0.0 11.6 14.0 230777 DELTA P IS :
.5 TOTAL DYNAMIC HEAD (LPSI-A) :
1.0 TOTAL DYNAMIC HEAD (LPSI-B) OUT OF RANGE R.U.ORDED DATE: 11 Jan 1986 RECORDED TIME: 16: 46:32 I
HPSI I
PUMP A I
PUMP B RWST I
FLOW PRESSURE FLOW PRESSURE I
SUCT RECIRC SUCT DISCH SUCT RECIRC SUCT DISCH GALS 1337.2 31.4 14.2 1195.9 1337.2 31.4 14.8 33.7 230651 TOTAL DYNAMIC HEAD (HPSI-A) :
2729.3 TOTAL DYNAMIC HEAD (HPSI-B) :
45.8 RECORDED DATE: 11 Jan 1986 RECORDED TIME: 16:46:32 I
LPSI I
I PUMP A I
PUMP B RWST I
FLOW PRESSURE FLOW PRESSURE I
SUCT RECIRC SUCT DISCH SUCT RECIRC SUCT DISCH GALS
).0 0.0 11.6 15.5 0.0 0.0 11.6 14.1 2?0651 s
DELTA P IS :
.4
-41 J
ECCS Tcat Dat Printout TOTAL DYNAMIC HEAD (LPSI-A) :
1.0 TOTAL DYNAMIC HEAD (LPSI-B) OUT OF RANGE REtuRDED DATE:__________________Jan 1986 RECORDED TIME: 16: 46:41 11 I
________________________________________ _______________________________________I I
PUMP A I
PUMP B RWST I
FLOW PRESSURE FLOW PR
_____________________________________________________________ ESSURE I
SUCT RECIRC SUCT DISCH SUCT RECIRC SU
__________________________________________________________CT DISCH GALS 1332.9 31.5 13.8 1194.8 1332.9 31.5 13.7 33.7 23046 TOTAL DYNAMIC HEAD (HPSI-A) :
2727.7 TOTAL DYNAMIC HEAD (HPSI-B) :
48.3 RECORDED DATE: 11 Jan 1986 RECORDED TIME: 16: 46: 41 I
____________________________________________________________________________..I I
PUMP A I
PUMP B RWS1 I-FLOW PRESSURE FLOW PRESSUR
.;4 JT________________________________________________
I RECIRC SUCT DISCH SUCT RE' CIRC SU
__________________________________________________________CTDISCH GALS 0.0 0.0 11.5 15.4 0.0 0.0 11.6 14.0 230461 DELTA P IS :
.6 TOTAL DYNAMIC HEAD (LPSI-A) :
1.0 TOTAL DYNAMIC HEAD (LPSI-B) OUT OF RANGE RECORDED DATE: 11 Jan 1986 RECORDED TIME: 16: 46: 46 I
_______________________________________________.________________________________I I
PUMP A I
PUMP B RWST I
FLOW PRESSURE FLOW PRESSUR
_________________________________________________________________E I
SUCT RECIRC SUCT DISCH SUCT RECIRC SUCT
__________________.,________________________________________..__DISCH GALS 1337.2 31.5 14.8 1195.4 1337.2 31.5 14.2 33.6 230351 TOTAL DYNAMIC HEAD (HPSI-A) :
2726.8 TOTAL DYNAMIC HEAD (HPSI-B) :
47.0 r-ECCS T;ct D3tn Printout RECORDE'D DATE: 11 Jhn 1986 RECORDED TIME: 16: 46: 46
___u____________________________________________________________________________
I LPSI I
I PUMP A I
PUMP B RWST I
FLOW PRESSURE FLOW PRESSURE
'I
~~
5U5T R[d[kd"5bCT~"b[5CU 5UUT"k[U[kb'"5bdi'"'b[5C5'"55L5
~~~~~
0.0 0.0 11.5 15.4 0.0 0.0 11.6 14.0 230351 DELTA P IS :
.8 TOTAL DYNAMIC HEAD (LPSI-A) :
.9 TOTAL DYNAMIC HEAD (LPSI-B) OUT OF RANGE RECORDED DATE: 11 Jan 1986 RECORDED TIME: 16: 47:24 I
HPSI I
I PUMP A I
PUMP B RWST I
FLOW PRESSURE FLOW PRESSURE I
SUCT RECIRC SUCT DISCH SUCT RECIRC SUCT DISCH GAL.
'c8.4 30.9 14.0 1110.3 1458.4 30.9 14.4 33.9 22948c tv..
TOTAL OYNAMIC HEAD (HPSI-A) :
2532.6 TOTAL OYNAMIC HEAD (HPSI-B) :
47.9 RECORDED DATE: 11 Jan 1986 RECORDED TIME: 16: 47:24 I
LPSI I
I PUMP A I
PUMP B RWS1 I
FLOW PRESSURE FLOW PRESSURE I
SUCT RECIRC SUCT DISCH SUCT RECIRC SUCT DISCh GAL S 0.0
.1 11.5 15.4 0.0
.1 11.5 14.0 229484 DELTA P IS :
.6 TOTAL DYNAMIC HEAD (LPSI-A) :
1.0 TOTAL DYNAMIC HEAD (LPSI-B) OUT OF RANGE RECORDED DATE: 11 Jan 1986 RECORDED TIME: 16: 47:27 43
'?
m..
o,
ECCS Tcst Datn Printout I
HPSI l
__________________________________..______-.___________________________________I I
PUMP A I
PUMP B RWS' I
FLOW PRESSURE FLOW PRESSUR I
_____________-_________..________________________-__.-____E
'T RECIRC SUCT DISCH SUCT RECIRC SUCT D
GALS
____________________________--______________________ -______ ISCH 1491.8 30.7 13.8 1110.2 f491.8 30.7 14.3 33.7 229405 TOTAL DYNAMIC HEAD (HPSI-A) :
2533.1 TOTAL DYNAMIC HEAD (HPSI-B) :
47.6 RECORDED DATE: 11 Jan 1986 RECORDED TIME: 16: 47:27 I
______..___-___....__________-_____-_-_..___-_-_-_-____-____________...___-_I I
PUMP A I
PUMP B RWSt FLOW PRESSURE FLOW P
.-_-____-___-_-_-__-___________---_-_-_-_----___________-RESSURE I
SUCT RECIRC SUCT DISCH SUCT RECIRC
._______________________________...____________________SUCT DISCH GALS 0.0
.1 11.5 15.3 0.0
.1 11.5 14.0 22940F SELTA P IS :
.4 TOTAL DYNAMIC HEAD (LPSI-A) :
1.0
\\
TOTAL DYNAMIC HEAD (LPSI-B) OUT OF RANGE RECORDED DATE: 11 Jan 1986 RECORDED TIM
.___________________________-_____-______E:
16: 47:34 HPSI
. __________________________-____ ____-_-___-__________________________________.I PUMP A I
PUMP B RWST FLOW PRESSURE FL PRESSURE I
___________________________-____________OW SUCT RECIRC SUCT DISCH SUCT RECI
..________....___________________________ __. ____RC SUCT DISCH GALS 1523.4 30.7 14.1 1110.4 1523.4 30.7 14.5 34.1 229247 TOTAL DYNAMIC HEAD (HPSI-A) 2533.1 TOTAL OYNAMIC HEAD (HPSI-B) 48.3 ECORDED DATE:
11 Jan 1986 RECORDED
...___.... -_____--. ___._____________ TIME: 16: 47:34
___--____________________-______LPSI I
PUMP A I
PUMP B R"ST FLOW PRESSURE FLOW PRESSURE T
-44
ECCS Tcat D3tn Prine' cut SUCT*
RECIRC SUCT DISCH SUCT RECIRC SUCT DISCH GA S
___7__________
DE.
t P IS :
.5 TOTAL DYNAMIC HEAD (LPSI-A) :
1.0 TOTAL OYNAMIC HEAD (LPSI-B) OUT OF RANGE RECORDED DATE: 11 Jan 1986 RECORDED TIME: 16: 47:38 I
HPSI I
I PUMP A I
PUMP B RWSi I
FLOW PRESSURE FLOW PRESSURE
___________________________________________________________________________I SUCT RECIRC SUCT DISCH SUCT RECIRC SUCT DISCH GALS 1542.7 30.5 13.3 1110.3 1542.7 30.5 14.8 34.1 229137 i
TOTAL DYNAMIC HEAD (HPSI-A) :
2534.6 TOTAL DYNAMIC HEAD (HPSI-B) :
47.6 i
N.
DED DATE: 11 Jan 1986 RECORDED TIME: 16: 47:38 I
LPSI I
I PUMP A I
PUMP B RWST I
FLOW PRESSURE FLOW PRESSURE I
SUCT RECIRC SUCT DISCH SUCT RECIRC SUCT DISCH GALS 0.0
.1 11.4 15.4 0.0
.1 11.5 13.9 229137 1 ELTA P IS :
.5 TOTAL DYNAMIC HEAD (LPSI-A) :
1.1 TOTAL OYNAMIC HEAD (LPSI-B) OUT OF RANGE lECORDED DATE: 11 Jan 1986 RECORDED TIME: 16: 47:46 HPSI
._______________________________________________________________________________I PUNP A I
PUMP B RWST FLOW PRESSURE FLOW PRESSURE I
SUCT RECIRC SUCT DISCH SUCT RECIRC SUCT DISCH
._________________________________________________________________________ GALS 1548.9 30.5 12.5 1110.6 1548.9 30.5 14.2 34.1 228916 -
g ECCS T =t D3ta Printout
, TOTAL DYNAMIC HEAD (HPSI-A) :
2537.1 TOTAL DYNAMIC HEAD (HPSI-B) :
49.0
?ECORDED DATE: 11 Jan 1986 RECORDED TIME: 16: 47:46 LPSI I
PUMP A I
PUMP B RWST C
FLOW PRESSURE FLOW PRESSURE I
SUCT RECIRC SUCT DISCH SUCT RECIRC SUCT DISCH.
GALS
.________________________________________________________________________a____.._
0.0
.1 11.4 15.3 0.0
.1 11.5 14.0 2289 %
lELTA P IS :
.3 TOTAL DYNAMIC HEAD (LPSI-A) :
.9 TOTAL DYNAMIC HEAD (LPSI-B) OUT OF RANGE RECORDED DATE: 11 Jan 1986 RECORDED TIME: 16:47:53 I.
HPSI I
_s I
PUMP A I
PUMP B RWST I
FLOW PRESSURE FLOW PRESSURE I
SUCT RECIRC SUCT DISCH SUCT RECIRC SUCT DISCH GALS 1552.0 30.3 14.4 1110.6 1552.0 30.3 14.9 34.7 228743 TOTAL DYNAMIC HEAD (HPSI-A) :
2532.7 TOTAL DYNAMIC HEAD (HPSI-B) :
48.7 RECORDED DATE: 11 Jan 1986 RECORDED TIME: 16: 47:53
.I LPSI I
I PUMP A I
PUMP B RWSi I
FLOW PRESSURE FLOW PRESSURE I
SUCT RECIRC SUCT DISCH SUCT RECIRC SUCT DISCH GALS 0.0
.1 11.4 15.4 0.0
.1 11.5 13.9 229743 DELTA P IS :
.5 TOTAL OYNAMIC HEAD iLPSI-A) :
1.1
' w
f*
u Lt e (cont'c)
ECCS Tact Data Printout
' TOTAL OYNAMIC HEAD (LPSI-B) OUT.0F RANGE t
ret.JED DATE: 11 Jan 1986 RECORDED. TIME: 16: 47:56 HPSI I
s.-------------
I PUMP A I
PUMP B RWST I
FLOW PRESSURE FLOW PRESSURE I
SUCT RECIRC SUCT DISCH SUCT RECIRC SUCT DISCH GALS 1552.0 30.2 14.4 1110.7 1552.0 30.2 14.4 34.5 228600 TOTAL DYNAMIC HEAD (HPSI-A) :
2533.1 TOTAL DYNAMIC HEAD (HPSI-B) :
49.4
?ECORDED DATE: 11 Jan 1986 RECORDED TIME: 16:47:56 s
a LPSI I
PUMP A I
PUMP B RWS1 FLOW PRESSURE FLOW PRESSURE I
QT RECIRC SUCT DISCH SUCT RECIRC SUCT DISCH GALS
_--------------_----------_-______--- p 0.0
.1 11.4 15.4 0.0
.1 11.5 13.9 228680-JELTA P IS :
.6 TOTAL DYNAMIC HEAD (LPSI-A) :
1.1 TOTAL DYNAMIC HEAD (LPSI-B) OUT OF RANGE RECORDED DATE: 11 Jan 1986 RECORDED TIME: 16:48:03 I
HPSI I
I PUMP A I
PUMP B RWS!
FLOW PRESSURE FLOW PRESSURE I
SUCT RECIRC SUCT DISCH SUCT RECIRC SUCT DISCH GALS 1551.9 30.2 12.6 1110.3 1551.9 30.2 14.1 33.2 228522 l
TOTAL DYNAMIC HEAD (HPSI-A) :
2536.4 TOTAL DYNAMIC HEAD (HPSI-B) :
47.4 '
./...
AAm r o Wont c; ECCS Tcst Data Printout RECORDED DATEi 11 Jan 1986 RECORDED TIME: 16: 48:03 f
LPSI I
.1 PUMP A I
PUMP B RWST
'I FLOW PRESSURE FLOW PRESSURE I
SUCT RECIRC SUCT DISCH SUCT RECIRC SUCT DISCH GALS 0.0
.1 11.4 15.3 0.0
.1 11.5 13.9 228522 DELTA P IS :
.5 TOTAL DYNAMIC HEAD (LPSI-A) :
.9 TOTAL DYNAMIC HEAD (LPSI-B) OUT OF RANGE
.y-RECORDED DATE: 11 Jan 1986 RECORDED TIME: 16:48:32 PUMP A I
PUMP B RWST I
~
I
(
FLOW PRESSURE FLOW PRESSURE I
SOCT RECIRC SUCT DISCH SUCT RECIRC SUCT DISCH GALL
(,,
3.7 29.4 13.3 1001.2 1643.7 29.4 14.0 34.1 227718
't
, TOTAL DYNAMIC HEAD (HPSI-A) :
2283.4 TOTAL DYNAMIC HEAD (HPSI-B) :
49.8 t
>RECORCED DATE: 11 Jan 1986 RECORDED TIME: 16:48:32 m.___________________
LPSI I
I'__________________,____________________________________________________________
PUMP A I
PUMP B RWST I
I FLOW PRESSURE FLOW PRESSURE I
f__SUCT RECIRC SUCT DISCH ____'SUCT RECIRC SUCT DISCH GALS DELTA P IS :
4 TOTAL DYNAMIC HEAD (LPSI-A) :
1.0
' TOTAL DYNAMIC HEAD (LPSI-B) OUT OF RANGE l
l l R__E_CO_R_D_E_D__D_ ATE _:_ _ _ _1_1 J_ a_n_ _1_98_6_ _ _ R_ECO_R_D_E_D_ _T_IM_E_:_ _1_6 lI HPSI I f
ECCS Tect D3tc Printout I
PUMP A I
PUMP B RWST I
FLOW PRESSURE FLOW PRESSURE I
CT RECIRC SUCT.
DISCH SUCT RECIRC SUCT DISCH GALS 1706.8 29.0 13.1 1000.5 1736.8 29.0 14.1 34.0 227465 i
TOTAL DYNAMIC HEAD (HPSI-A) :
2282.4 TOTAL DYNAMIC HEAD (HPSI-B) :
49.9 RECORDED DATE: 11 Jan 1986 RECORDED TIME: 16: 48: 41 I
LPSI I
I PUMP A I
PUMP B RWST I
FLOW PRESSURE FLOW PRESSURE I
SUCT RECIRC SUCT DISCH SUCT RECIRC SUCT DISCH GALS 0.0
.1 11.4 15.2 0.0
.1 11.4 13.9 2274G5 DELTA P IS :
.5
,~
TOTAL DYNAMIC HEAD (LPSI-A > :
.8 L
TOTAL DYNAMIC HEAD (LPSI-B) OUT OF RANGE RECORDED DATE: 11 Jan 1986 RECORDED TIME: 16:48: 44 I
HPSI I
I PUMP A I
PUMP B RWST I
FLOW PRESSURE FLOW PRESSURE I
SUCT RECIRC SUCT DISCH SUCT RECIRC SUCT DISCH GALS 1758.0 28.9 12.7 1000.0 1758.0 28.9 13.7 34.1
~227355 TOTAL OYNAMIC HEAD (HPSI-A) :
2282.5 TOTAL DYHAMIC HEAD (HPSI-B) i 51.1 RECORDED DATE: 11 Jan 1986 RECORDED TIME: 16: 48: 44 LPSI I
I PUMP A I
PUMP B RWST I
FLOW PRESSURE FLOW PRESSURE I
SUCT RECIRC SUCT DISCH SUCT RECIRC SUCT DISCH GALS -
2ABLE 6 (Cont'd)
ECCS Tcat Data Printout 0.0
.1 11.4 15.3 0.0
.1 11.4 13.9 227355 Du
. P IS :
.5 1.0 TOTAL DYNAMIC HEAD (LPSI-A) :
TOTAL DYNAMIC HEAD (LPSI-B) OUT OF RANGE RECORDED DATE: 11 Jan 1986 RECORDED TIME: 16:48:51 I
HPSI I
I PUMP A I
PUMP B RWSr I
FLOW PRESSURE FLOW PRESSURE I
SUCT RECIRC SUCT DISCH SUCT RECIRC SUCT DISCH GALS 1770.2 28.9 13.9 1001.2 1770.2 28.9 13.6 33.5 227182 TOTAL DYNAMIC HEAD (HPSI-A) :
2282.6 TOTAL DYNAMIC HEAD (HPSI-B) :
50.0 Fi DED DATE: 11 Jan 1986 RECORDED TIME: 16:48:51
_t -
I LPSI I
I PUMP A I
PUMP B RWSi I
FLOW PRESSURE FLOW PRESSURE I
SUCT RECIRC SUCT DISCH SUCT RECIRC SUCT DISCH GALS 0.0
.1 11.3 15.2 0.0
.1 11.4 13.9 227182 DELTA P IS :
.8 l
TOTAL DYNAMIC HEAD (LPSI-A) :
.9 TOTAL DWAMIC HEAD (LPSI-B) OUT OF RANGE i
t RECORDED DATE: 11 Jan 1986 RECORDED TINE: 16:48:54 I
HPSI I
' I PUNP A I
. PUMP B RWST J
FLOW PRESSURE FLOW PRESSURE I
l.
SUCT RECIRC SUCT DISCH SUCT RECIRC SUCT DISCH GALS iiii:5---~~iii----Tii--i55i:5--~iisi:5-~~~ii:s---i3:5----553~~~55353i-ECCS Tcot Data Printout'
' TOTAL DYNAMIC HEAD (HPSI-A) :
2285.0 TOTAL DYNAMIC HEAD (HPSI-B) :
48.5 RECORDED DATE: 11 Jan 1986 RECORDED TIME: 16: 48:54 I
LPSI I
I PUMP A I
PUMP B RWS1 I
FLOW PRESSURE FLOW PRESSURE I
SUCT RECIRC SUCT DISCH SUCT RECIRC SUCT DISCh GALS 0.0 1
11.3 15.3 0.0
.1 11.4 13.9 227071 DELTA P IS :
.6 TOTAL DYNAMIC HEAD (LPSI-A) :
1.0 TOTAL DYNAMIC HEAD (LPSI-B) OUT OF RANGE RECORDED DATE: 11 Jan 1986 RECORDED TIME: 16: 49: 11 I
HPSI I
Al PUMP A I
PUMP B RWSi I
FLOW PRESSURE FLOW PRESSURE I
SUCT RECIRC SUCT DISCH SUCT RECIRC SUCT DISCH GALS 1809.2 28.8 13.2 1001.1 1809.2 28.8 14.5 33.9 226646 TOTAL DYNAMIC HEAD (HPSI-A) :
2284.1 TOTAL DYNAMIC HEAD (HPSI-B) :
49.0 l RECORDED DATE: 11 Jan 1986 RECORDED TIME: 16: 49: 1.
t ________________________________________________________________________________
I LPSI I
I PUMP A I
PUMP B RWST I
FLOW PRESSURE FLOW PRESSURE I
( __SUCT RECIRC SUCT DISCH SUCT RECIRC SUCT DISCH GALS l- ________________________________________________________________________________
0.0
.1 11.3 15.2 0.0
.1 11.3 13.9 226646 l
DELTA P IS :
.9 i
TOTAL DYNAMIC HEAD (LPSI-A) :
1.0 TOTAL DYNAMIC HEAD (LPSI-B) OUT OF RANGE t
~ _. _
ECCS Test Dats Printout 4
RECORDED DATE: 11 Jan 1986 RECORDED TIME: 16: 49:21 I
___________________________________________________________________________I_
I PUMP A I
PUMP B RWST I
FLOW PRESSURE FLOW PRESSURE
____________________________________________________________________________I___
SUCT RECIRC SUCT DISCH SUCT RECIRC SUCT DISCH
________________________._________________________________________________ GALS 1809.2 28.8 12.3 1001.1 1809.2 28.8 13.3 34.0 226330 TOTAL DYNAMIC HEAD (HPSI-A) :
2286.0 TOTAL DYNAMIC HEAD (HPSI-B) :
52.0 RECORDED DATE: 11 Jan 1986 RECORDED TIME: 16:49:21 I
_____________________________________________________________________________.__I I
PUMP A I
PUMP B RWST I
FLOW PRESSURE FLOW PRESSURE
___________________________________________________________________________I_.
SUCT RECIRC SUCT DISCH SUCT RECIRC SUCT DISCH
._________________________________________________________________________ GALS
'.0
.1 11.3 15.2 0.0
.1 -
11.3 13.9 226330 s
JELTA P IS :
.9 TOTAL DYNAMIC HEAD (LPSI-A) :
.9 TOTAL DYNAMIC HEAD (LPSI-B) OUT OF RANGE l
RECORDED DATE: 11 Jan 1986 RECORDED TIME: 16:49:31 HPSI
._______________________________________________________________________________I PUMP A I
PUMP B RWST i:
FLOW PRESSURE FLOW PRESS I
.______________________________________________________________URE SUCT RECIRC SUCT DISCH SUCT RECIRC SUCT
.-_----__---_-_________________________________________________DISCH GALS 1809.2 28.8 12.7 1001.3 1809.2 28.8 12.6 33.5 226046 TOTAL DYNAMIC HEAD (HPSI-A) :
2285.5 TOTAL DYNAMIC HEAD (HPSI-B) :
52.6 I
1 l!ECORDED DATE: 11 Jan 1986 RECORDED TIME: 16:49:31 1
TABLE 6 (Cont'c)
ECCS TGat D2tm Printout I
LPSI I
I PUMP A I
PUMP B RWS~
I FLOW PRESSURE FLOW PRESSURE I
SUCT RECIRC SUCT DISCH SUCT RECIRC SUCT DISCH GALS 0.0
.1 11.3 15.2 0.0
.1 11.3 13.9 225046 DELTA P IS :
.7 TOTAL DYNAMIC HEAD (LPSI-A) :
1.0 TOTAL DYNAMIC HEAD (LPSI-B) OUT OF RANGE RECORDED DATE: 11 Jan 1986 RECORDED TIME: 16:50:11 I
HPSI I
'I PUMP A I
PUNP B RNST I
FLOW PRESSURE FLOW PRESSURE I
S'CT DISCH GALS SUCT RECIRC SUCT DISCH SUCT RECIRC U
1820.0 28.8 13.1 988.6 1820.0 28.8 13.6 33.5 22488F 1
k.
TOTAL DYNAMIC HEAD (HPSI-A) :
2255.6
. TOTAL DYNAMIC HEAD (HPSI-B) :
50.5 RECORDED DATE: 11 Jan 1986 RECORDED TIME: 16:50:11 I
LPSI I
' I PUMP A I
PUMP B RWST I
FLOW PRESSURE FLOW PRESSURE I
SUCT RECIRC SUCT DISCH SUCT RECIRC SUCT DISCH GALS 0.0 0.0 11.2 15.1 0.0 0.0 11.2 13.8 224880 DELTA P IS :
.7 TOTAL DYNAMIC HEAD (LPSI-A) :
1.O TOTAL DYNAMIC HEAD.(LPSI-B) OUT OF RANGE RECORDED DATE: 11 Jan 1986 RECORDED TIME: 16:50:14
'I HPSI I
ECCS Tcat Data Printout I
PUMP A I
PUMP B RWST I
FLOW PRESSURE FLOW PRESSURE I
SUCT RECIRC SUCT DISCH SUCT RECIRC SUCT DISCH GALS
'9.9 28.7 12.8 988.7 1819.9 29.7 14.8 33.5 224769 TOTAL DYNAMIC HEAD (HPSI-A) :
2256.5 TOTAL DYNAMIC HEAD (HPSI-B) :
47.6 RECORDED DATE: 11 Jan 1986 RECORDED TIME: 16:50:14 LPSI I
I PUMR A I
PUMP B RWST I
FLOW PRESSURE FLOW PRESSURE I
.SUCT RECIRC SUCT DISCH SUCT RECIRC SUCT DISCH GALS 0.0
.1 11.2 15.1 0.0
.1 11.2 13.8 224769 DELTA P IS :
.8 TOTAL DYNAMIC HEAD (LPSI-A) :
1.0 TOTAL DYNAMIC HEAD (LPSI-B) OUT OF RANGE t
b ECCS Tcat Data Printout
<ECQRDED DATE: 11 Jan 1986 RECORDED TIME: 11: 57:12 HPSI I
PUMP A I
PUNP B RWST FLOW PRESSURE FLOW PRESSURE I
SUCT RECIRC SUCT DISCH SUCT RECIRC SUCT DISch GALS TOTAL DYNAMIC HEAD (HPSI-A) :
3229.7 TOTAL DYNAMIC HEAD (HPSI-B) :
43.3
?ECORDED DATE: 11 Jan 1986 RECORDED TIME: 11:57:12 LPSI I
PUMP A I
PUMP B RWST FLOW PRESSURE FLOW PRESSURE I
SUCT RECIRC SUCT DISCH SUCT
,RECIRC SUCT DISCH
' GALS iEI_.. P IS :
.9 TOTAL DYNAMIC HEAD (LPSI-A > -:
1.6 TOTAL DYNAMIC HEAD (LPSI-B) OUT OF RANGE
'ECORDED DATE: 11 Jan 1986 RECORDED TIME: 11: 57:30 HPSI I
PUMP A I
PUMP B RWST FLOW PRESSURE FLOW PRESSURE I
SUCT RECIRC SUCT DISCH SUCT RECIRC SUCT DISCH GALS 0.0
.1 14.6 1420.1 0.0
.1 13.7 34.1 234625 TOTAL DYNAMIC HEAD (HPSI-A) :
3243.4 TOTAL DYNAMIC HEAD (HPSI-B) :
47.2
.C
- T---..
'1 Jan 1986 RECORDED TIME: 11:57:30 LPSI I
n.
PUMP B RWST ECCS Tant Data Printout FLOW PRESSURE FLOW PRESSURE I
SUCT RECIRC SUCT DISCH SUCT RECIRC SUCT DISCH GALS 0.0 0.0 11.9 16.0 0.0 0.0 11.9 14.6 234625
) ELTA P IS :
.8 TOTAL DYNAMIC HEAD (LPSI-A) :
1.5 TOTAL DYNAMIC HEAD (LPSI-B) OUT OF RANGE RECORDED DATE: 11 Jan 1986 RECORDED TIME: 11:57:34 I
HPSI I
I PUMP A I
PUMP B RWST I
FLOW PRESSURE FLOW PRESSURE I
SUCT RECIRC SUCT DISCH SUCT RECIRC SUCT DISCH GALS 0.0
.1 17.2 1409.5 0.0
.1 14.6 33.6 234625 TOTAL DYNAMIC HEAD (HPSI-A) :
3212.9 TOTAL DYNAMIC HEAD (HPSI-B) :
43.8 s
RECORDED DATE: 11 Jan 1986 RECORDED TIME: 11: 57:34 I
LPSI I
I PUMP A I
PUMP B RWST I
FLOW PRESSURE FLOW PRESSURE I
t________________________________________________________________________________
l SUCT RECIRC SUCT DISCH SUCT RECIRC SUCT DISCH GALS 0.0 0.0 11.9 16.1 0.0 0.0 11.9 14.6 234625 t
l DELTA P IS :
.7 I
TOTAL DYNAMIC HEAD <LPSI-A) :
1.6 TOTAL DYNAMIC HEAD -(LPSI-B) OUT OF RANGE
' RECORDED DATE: 11 Jan 1986 RECORDED TIME: 11: 57:52
!7 HPSI I
lI_____ FLOW I
PUMP A I
PUMP B RWST
___________.______E_S_SURE_____________FL_O_W____________P_R_E_S_S_U_R_E_____
PR l__
l SUCT RECIRC SUCT DISCH SUCT RECIRC SUCT DISCH GALS I -
MAA &d fe %8 \\ betJ&& b L& f ECCS T.st Datn Printout
'0. 0
.1 17.2 1403.5 0.0
.1 13.1 34.0 234609 TOTAL DYNAMIC HEAD (HPSI-A) :
3199.2 TOTAL DYNAMIC HEAD (HPSI-B) :
48.3 11 Jan 1986 RECORDED TIME: 11:57:52 RECORDED DATE:
. I LPSI I
I PUMP A I
PUMP B RWS1 I
FLOW PRESSURE FLOW PRESSURE I
SUCT RECIRC SUCT DISCH SUCT RECIRC SUCT DISCH GALS 0.0 0.0 11.9 16.1 0.0 0.0 11.9 14.6 234609 DELTA P IS :
.9 TOTAL OYNAMIC HEAD (LPSI-A) :
1.7 TOTAL DYNAMIC HEAD (LPSI-B) OUT OF RANGE
,A, DED DATE: 11 Jan 1986 RECORDED TIME: 12:02:29 4 ___ ____________________________________________________________________________
I HPSI I
I
-PUMP A I
PUMP B RWST I
' I FLOW PRESSURE FLOW PRESSURE I
l SUCT RECIRC SUCT DISCH SUCT RECIRC SUCT DISCH GALS 1.3
.1 14.6 1306.5 1.3
.1 14.6 33.0 234120 i
TOTAL DYNAMIC HEAD (HPSI-A) :
2981.3 TOTAL DYNAMIC HEAD (HPSI-B) :
42.4 l
l RECORDED DATE: 11 Jan 1986 RECORDED TIME: 12:02:29 lI LPSI I
l_________________-_________-____________________________________________________
lI
~ PUMP A I
PUNP B RWST lI FLOW PRESSURE FLOW PRESSURE I
'_T RECIRC SUCT DISCH SUCT RECIRC SUCT DISCH GALS l _ s 0.0 0.0 11.9 16.1 0.0 0.0 11.9 14.6 234120
. t l
tant.r o Wont a/
ECCS Tsot Data Printout DELTA P IS :
.9
- TOTAL DYNAMIC HEAD (LPSI-A) :
1.7 TOTAL DYNAMIC HEAD (LPSI-B) OUT OF RANGE RECORDED DATE: 11 Jan 1986 RECORDED TIME: 12:02:34 I
HPSI I
I PUMP A I
PUMP B RWST I
FLOW PRESSURE FLOW PRESSURE I
SUCT RECIRC SUCT DISCH SUCT RECIRC SUCT DISCH GALS 1.4
.1 15.0 1303.8 1.4
.1 14.4 33.8 234057 TOTAL DYNAMIC HEAD (HPSI-A) :
2974.3 TOTAL DYNAMIC HEAD (HPSI-B) :
44.6 RECORDED DATE: 11 Jan 1986 RECORDED TIME: 12:02:34 I
LPSI I
I.
PUMP A I
PUMP B RWST I(,
FLOW PRESSURE FLOW PRESSURE-I
.m SUCT RECIRC SUCT DISCH SUCT RECIRC SUCT DISCH
_________-___-_________________-__________--_____________________-________ GALS 0.0 0.0 11.8 16.0 0.0 0.0 11.9 14.6 23405/
- DELTA P IS :
.9 TOTAL DYNAMIC HEAD (LPSI-A) :
1.6 l
TOTAL DYNAMIC HEAD (LPSI-B) OUT OF RANGE l
lRECORDEDDATE:11 Jan 1986 RECORDED TIME: 12:02:38 lI HPSI I
I PUMP A I
PUMP B RWST I
FLOW PRESSURE FLOW PRESSURE I
SUCT RECIRC SUCT DISCH SUCT RECIRC SUCT DISCH GALS 1.5
.1 14.0 1304.3 1.5
.1 14.6 33.6 234010 s
TOTAL DYNAMIC HEAD (HPSI-A) :
2977.8 TOTAL DYNAMIC HEAD (HPSI-B) :
43.9 - -.
TABLE 6 (Cont'd)
ECCS Tast Data Printout RECORDED DATE: 11 Jan 1986 RECORDED TIME: 12:02:38 I
LPSI I
I PUMP A I
PUMP B RWST I
FLOW PRESSURE FLOW PRESSURE I
SUCT RECIRC SUCT DISCH SUCT RECIRC SUCT DISCH GALS 0.0 0.0 11.8 16.0 0.0 0.0 11.9 14.6 234010 DELTA P IS :
.9 TOTAL DYNAMIC HEAD (LPSI-A) :
1.6 TOTAL DYNAMIC HEAD (LPSI-B) OUT OF RANGE RECORDED DATE: 11 Jan 1986 RECORDED TIME: 12:02: 44 I
HPSI I
I PUMP A I
PUMP B RWS1 I
FLOW PRESSURE FLOW PRESSURE I
^' IC T RECIRC SUCT DISCH SUCT RECIRC SUCT DISCH GALS
.6
.I 14.4 1307.0 1.6
.1 14.7 33'.7 233931 TOTAL DYNAMIC HEAD (HPSI-A > :
2982.9 TOTAL DYNAMIC HEAD (HPSI-B) :
43.8 RECORDED DATE: 11 Jan 1986 RECORDED TIME: 12:02: 44
- I LPSI I
I PUMP A I
PUMP B RWS1
- I FLOW PRESSURE FLOW PRESSURE I
SUCT RECIRC SUCT DISCH SUCT RECIRC SUCT DISCH GALS 0.0 0.0 11.8 16.0 0.0 0.0 11.9 14.6 233931 DELTA P.IS :
1.0 TOTAL DYNAMIC HEAD (LPSI-A) :
1.6 TOTAL DYNAMIC HEAD (LPSI-B) OUT OF RANGE RECORDED DATE: 11 Jan 1986 RECORDED TIME: 12:03:52.-
14mLc o (cont'c)
ECCS Test Dsts Printout I
__________SI I
I PUMP A I
PUMP B PWSi FLOW PRESSURE FLOW
______________________________________________________ PRESSURE I
SvCT RECIRC SUCT DISCH SU
_______________________________________CT RECIRC SUCT DISCH GAL.S 2.8
.1 13.9 1205.7 2.8
.1 14.4 33.8 232590 TOTAL DYNAMIC HEAD (HPSI-A > :
2750.2 TOTAL DYNAMIC HEAD (HPSI-B')
44.7 RECORDED DATE: 11 Jan 1986 RECORDED T 12:03:52
___________________________________IME:
.____________________________________LPSI_____________________
PUMP A I
PUMP B RWST FLOW PRESSURE PRESSURE I
.___________________________________________ FLOW SUCT RECIRC SUCT DISCH S
_______________________________________UCT RECIRC SUCT DISCH GALS 0.0 0.0 11.8 16.0 0.0 0.0 11.8 14.5 232590
(
P IS :
1.0 (OTAL DYNAMIC HEAD (LPSI-A) :
1.7 TOTAL DYNAMIC HEAD-(LPSI-B) OUT OF RANGE ECORDED DATE: 11 Jan 1986 RECORDED T 12:03:58
_______________________________________IME:
_______________________________________________________________________________I PUMP A I
PUMP B RWST FLOW PR l________________________ESSURE __________________________________
FLOW PRESSURE l SUCT RECIRC SUCT DISCH SU RECIRC SUCT DISCH GALS l
_______________________________________CT 2.8
.1 13.9 1204.7 2.8
.1 14.4 33.4 232480 l
l TOTAL DYNAMIC HEAD (HPSI-A) :
2748.0 TOTAL DYNAMIC HEAD (HPSI-B) :
43.7 t
}
}
ECn"ED DATE: 11 Jan 1986 RECORD l
.-----------__________________ED TIME: 12:03:58 1
LPSI I
FLOW PRESSURE FLOW PRESSURE I -
TABLE 6 (Cont'd)
ECCS TGst D3ta Printout SUCT RECIRC SUCT DISCH SUCT RECIRC SUCT DISCH GALS 0.0 0.0 11.8 16.0 0.0 0.0 11.8 14.6 232480 DELTA P IS :
.9 TOTAL DYNAMIC ' HEAD (LPSI-A) :
1.6 TOTAL DYNAMIC HEAD (LPSI-B) OUT OF RANGE RECORDED DATE: 11 Jan 1986 RECORDED TIME: 12:04:47 I
HPSI I
I PUMP A I
PUMP B RWST I
FLOW PRESSURE FLOW PRESSURE I
SUCT RECIRC SUCT DISCH SUCT RECIRC SUCT DISCH GALS 2.9
.1 13.8 1205.3 2.9
.1 13.7 33.8 231534 TOTAL DYNAMIC HEAD (HPSI-A) :
2749.6 TOTAL DYNAMIC HEAD (HPSI-B) :
46.3 a
l%
- RECORDED DATE: 11 Jan 1986 RECORDED TIME: 12:04:47 I
LPSI I
I PUMP A I
PUMP B RWST I
FLOW PRESSURE FLOW PRESSURE I
l S
RECIRC SUCT DISCH SUCT RECIRC SUCT DISCH GALS l---UCT l
0.0 0.0 11.7.
15.9 0.0 0.0 11.8 14.5 231534 l
JELTA P IS :
1.0 TOTAL DYNAMIC HEAD (LPSI-A > :
1.7 l
TOTAL DYNAMIC HEAD (LPSI-B) OUT OF RANGE I
1ECORDED DATE:
RECORDED TIME: 12:05:08 l---------------11 Jan 1986 HPSI
I lI PUMP A I
PUMP B RWST lI FLOW PR FLOW PRESSURE I
t--_---------------__--___ ESSURE l
SUCT RECIRC SUCT' DISCH SUCT RECIRC SUCT DISCH GALS ECCS Tsat Data Printout
.3:0-
.1 13.6 1103.8 3.0
.1 14.5 33.8 231029 TOTAL DYNAMIC HEAD (HPSI-A) :
2516.0
' TOTAL DYNAMIC HEAD (HPSI-B) :
44.4 RECORDED DATE: 11 Jan 1986 RECORDED TIME: 12:05:08 I
LPSI I
I PUMP A I
PUMP B RWST I
FLOW PRESSURE FLOW PRESSURE I
'hbbi "kkb[kb bbbi b5hbb
~5bbi"~~Rkb[kb 5bbi "[[Topic::B.5.b|b[5bb]]'" "~5dL5 DELTA P IS :
.7 TOTAL DYNAMIC HEAD (LPSI-A) :
1.7 TOTAL DYNAMIC HEAD (LPSI-B) OUT OF RANGE RECORDED DATE: 11 Jan 1986 RECORDED TIME: 12:05:15
' _\\
I HPSI I
I PUMP A I
PUMP B RWST
.I FLOW PRESSURE FLOW PRESSURE I
Ubbi~
'kkbikU" "5bbi'"'bi5b5"'5bbi" "kkbikU'" 5bbi"b UbH "bkL5~~
~
3.0
.1 13.6 1105.4 3.0
.1 14.8 33.1 230871 TOTAL DYNAMIC HEAD (HPSI-A) :
2519.6 TOTAL DYNAMIC HEAD (HPSI-B) :
42.4 RECORDED DATE: 11 Jan 1986 RECORDED TIME: 12:05: 15 C
LPSI I
~
PUMP A I
PUMP B RWST
'I FLOW PRESSURE FLOW PRESSURE I
SUCT RECIRC SUCT DISCH SUCT RECIRC SUCT DISCH GALS lELTA P IS :
.8. _ _ _ _ _ - -., _., _ _. - _,,,... -
sr
uw a v w win. u/
ECCS Tset Dats Printout
. TOTAL DYNAMIC HEAD (LPSI-A) :
1.7 TOTAL DYNAMIC HEAD (LPSI-B) OUT OF RANGE RECuRDED DATE: 11 Jan 1986 RECORDED TIME: 12:05:21 HPSI I
I PUMP A I
PUMP B RWST I
FLOW PRESSURE FLOW PRESSURE I
SUCT RECIRC SUCT DISCH SUCT RECIRC SUCT DISCH GALS 3.2
.1 13.7 1103.4 3.2
.1 14.1 33.1 230666 TOTAL DYNAMIC HEAD (HPSI-A) :
2514.9 TOTAL DYNAMIC HEAD (HPSI-B) :
43.8
- RECORDED DATE: 11 Jan 1986 RECORDED TIME: 12:05:21 I
LPSI I
I PUMP A I
PUMP B RWS1 I
FLOW PRESSURE FLOW PRESSURE I
\\be.T RECIRC SUCT DISCH SUCT RECIRC SUCT DISCH GALS 0.0 0.0 11.7 15.9 0.0 0.0 11,7 14.5 230666
] ELTA P IS :
.8 TOTAL DYNAMIC HEAD (LPSI-A) :
I.7 TOTAL DYNAMIC HEAD (LPSI-B) OUT OF RANGE
' RECORDED DATE: 11 Jan 1986 RECORDED TIME: 12:05: 42 I
HPSI I
I PUMP A I
PUMP B RWST I
FLOW PRESSURE FLOW PRESSURE I
SUCT RECIRC SUCT DISCH SUCT RECIRC SUCT DISCH GALS 3.7
.1 13.2 1000.6 3.7
.1 13.5 33.0 230083
.0TAL DYNAMIC HEAD (HPSI-A) :
2278.7 TOTAL DYNAMIC HEAD (HPSI-B) :
45.1. - -
TABLE 6 (Cont'd)
ECCS Tsat Data Printout RECORDED DATE: 11 Jan 1986 RECORDED TIME: 12:05: 42 I,
LPSI I
I PUMP A I
PUMP B RWST I
FLOW PRESSURE FLOW PRESSURE I
SUCT RECIRC SUCT DISCH SUCT RECIRC SUCT DISCH GALS 0.0 0.0 11.6 15.8 0.0 0.0 11.7 14.5 230083 DELTA P IS :
.9 TOTAL DYNAMIC HEAD (LPSI-A) :
1.6 TOTAL DYNAMIC HEAD (LPSI-B) OUT OF RANGE RECORDED DATE: 11 Jan 1986 RECORDED TIME: 12:05:45 I
HPSI I
I PUMP A I
PUMP B RWST I
FLOW PRESSURE FLOW PRESSURE I
SUCT RECIRC SUCT DISCH SUCT RECIRC SUCT DISCH GALS 5,
J.8
.1 13.1 999.9 3.8
.1 14.5 33.7 229973 TOTAL DYNAMIC HEAD (HPSI-A) :
2277.1 TOTAL DYNAMIC HEAD (HPSI-B) :
44.4 RECORDED DATE: 11 Jan 1986 RECORDED TIME: 12:05: 45 I
LPSI I
' I PUMP A I
PUMP B RWS1 l I FLOW PRESSURE FLOW PRESSURE I
l SUCT RECIRC SUCT DISCH SUCT RECIRC SUCT DISCH GALS 0.0 0.0 11.6 15.8 0.0 0.0 11.7 14.4 229973 DELTA P IS :
1.1 TOTAL DYNAMIC HEAD (LPSI-A) :
1.7 TOTAL DYNAMIC HEAD (LPSI-B) OUT OF RANGE s
RECORDED DATE: 11 Jan 1986 RECORDED TIME: 12:05:50 TABLE 6 (Cont'd)
ECCS Tsst Dsta Printout
-I___'_-___-_____________-_________________________
__I HPSI I
PUMP A I
PUMP B RWST I
FLOW PRESSURE FLOW I
.____--________________________________________________ PRESSURE
- T RECIRC SUCT DISCH SUCT RE
________________________________________________ CIRC SUCT DISCH GALS 3.8
.1 13.0 1001.0 3.8
.1 13.9 32.8 229846 TOTAL DYNAMIC HEAD (HPSI-A) :
2280.O TOTAL DYNAMIC HEAD (HPSI-B) :
43.6 RECORDED DATE:
11 Jan 1986 RECORDED TINE: 12:0
_________________________________-______________5:50 I
_______________________________________________________________________________I_
I PUMP A I
PUMP B RWS1 I
FLOW PRESSURE FLOW I
_______________________________________________-__________ PRESSURE SUCT RECIRC SUCT DISCH SUCT REC
________________________-________________________IRC SUCT DISCH GALS 0.0 0.0 11.6 15.8 0.0 0.0 11.7 14.5 22984f.
DP-TA P IS :
1.0
(
TOTAL DYNAMIC HEAD (LPSI-A) :
1.6 TOTAL DYNAMIC HEAD (LPSI-B) OUT OF RANGE iRECORDED DATE:
11 Jan 1986 RECORDED TIME: 12:1
____________________-____________________________6:35
- I HPSI
_____________________________________________________________________________..__I
.I PUMP A I
PUMP B RWSi
- I FLOW PRESSURE FLOW PR I
__________-_________________________________________________ ESSURE SUCT RECIRC SUCT DISCH SUCT RECIRC
.______________________________________________________SUCT DISCH GALS 0.0
.1 17.4 16.1 0.0
.1 13.3 1477.8 233552 TOTAL DYNAMIC HEAD (HPSI-A) OUT OF RANGE TOTAL DYNAMIC HEAD (HPSI-B) :
3379.7 1ECORDED DATE: 11 Jan 1986 RECORDED TIME: 12:16:35 LPSI
.______________________________________________________________________________I i
PUMP A I
PUMP B RWST FLOW PRESSURE FLOW PR I
.______-_-____--____________-_________________-_____________ ESSURE ECCS T3st Data Printout S,UCT RECIRC SUCT DISCH SUCT RECIRC SUCT DISCH GALS 0.0 0.0 11.7 16.0 0.0 0.0 11.8 14.7 233552 DEL.A P IS :
.7 TOTAL DYNAMIC HEAD (LPSI-A > :
1.8 TOTAL DYNAMIC HEAD (LPSI-B) OUT OF RANGE RECORDED DATE: 11 Jan 1986 RECORDED TIME: 12: 18: 43 I
HPSI I
PUMP A I
PUMP B RWST I
FLOW PRESSURE FLOW PRESSURE I
~~
' 5diRd'"'5UUT'"'65555 50dT
-~~~~
" 5di55"'5Udi''6i5C5 5AL5 5Udi
-~~~~~
-~
R R
1.7
.1 15.3 15.1 1.7
.1 14.0 1380.3 233000 TOTAL DYNAMIC HEAD (HPSI-A) OUT OF RANGE TOTAL DYNAMIC HEAD (HPSI-B) :
3153.2 a
f Rh..DED DATE: 11 Jan 1986 RECORDED TIME: 12:18:43 I
LPSI I
I PUMP A I
PUMP B RWS1 I
FLOW PRESSURE FLOW PRESSURE I
SUCT RECIRC SUCT DISCH SUCT RECIRC SUCT DISCH GALS 0.0 0.0 11.7 16.0 0.0 0.0 11.8 14.6 233000
'JELTA P IS :
1.0 TOTAL DYNAMIC HEAD (LPSI-A) :
1.8 TOTAL DYNAMIC HEAD (LPSI-B) OUT OF RANGE RECORDED DATE: 11 Jan 1986 RECORDED TIME: 12:18:48 I
HPSI I
!I PUMP A I
PUMP B RWS' 2,
FLOW PRESSURE FLOW PRESSURE I
SUCT RECIRC SUCT DISCH SUCT RECIRC
______________________________..________________________SUCT DISCH GALS 1.7
.1 13.7 14.9 1.7
.1 15.0 1378.4 232906
_66-
LA5LE 6 (Cont'd)
ECCS Test Data Printout TOTAL DYNAMIC HEAD (HPSI-A) 2.6 TOTAL DYNAMIC HEAD (HPSI-B) :
3146.5 RECORDED DATE:
11 Jan 1986 RECORDED TIME: 1
___-______-_____-2: 18:48 I
--_-_-_____-__-_-___--_-_-__-__. _______-____--____-_______.. ________..._______I I
PUMP A I
PUMP B RWS1 I
FLOW PRESSURE F
PRESSURE I
_-_----______---___-_______--__-_-_-________ LOW SUCT RECIRC SUCT DISCH SUCT R
_____-___-__-_-______-_-______--____---_-__-___ECIRC SUCT DISCH GALS 0.0 0.0 11.7 16.0 0.0 0.0 11.8 14.6 232906
.) ELTA P IS :
.8 TOTAL DYNAMIC HEAD (LPSI-A) :
1.8 TOTAL DYNAMIC HEAD (LPSI-B) OUT OF RANGE
- ECORDED DATE:
11 Jan 1986 RECORDED TIME: 12:1
______-__8:54 HPSI
.A
.-______--____-___________-_--_________-_______________--_-_-_-_-_____--___1 PUMP A I
PUMP B RWST FLOW PRESSURE F
--__________-______- __-_-____-_____________ LOW PRESSURE I
SUCT RECIRC SUCT DISCH SUCT
.---------_-_____-___-_______-_____--________RECIRC-SUCT DISCH GALS 1.8
.1 14.7 15.0 1.8
.1 14.3 1376.7 232858 TOTAL DYNAMIC HEAD (HPSI-A) :
,6 TOTAL DYNAMIC HEAD (HPSI-B) :
3144.0 1
(
- ECORDED DATE:
11 Jan 1986 RECORDED TIM
_-------___-_____-_.-__________________E:
12: 18:54 LPS
--_____I I
PUMP A I
PUMP B RWST FLOW PRESSURE
_-_-___ FLOW PRESSURE I
SUCT RECIRC SUCT DISCH
___--_--____-______________SUCT RECIRC SUCT DISCH GALS i
0.0 0.0 11.7 16.0 0.0 0.0 11.7 14.6 232858 ELTA P IS :
.7 TOTAL DYNAMIC HEAD (LPSI-A) 1.8 i
! l
ECCS Tcet Data Prin :out TOTAL DYNAMIC HEAD (LPSI-B) OUT OF RANGE I
7DED DATE: 11 Jan 1986 RECORDED T
.___________________________________IME:.12 : 19:50 I
_____________________________________HPSI
___________________________________________I I
PUMP A I
PUMP B RWS7 I
FLOW PRESSURE
___________________________________________ FLOW PRESSURE I
SUCT RECIRC SUCT DISCH RECIRC SUCT DISCH
______________________________________SUCT_________________
GALS 2.9
.I 13.9 14.2 2.9
.1 12.5 1263.1 231786 TOTAL DYNAMIC HEAD (HPSI-A)
.8 TOTAL DYNAMIC HEAD (HPSI-B) :
2886.0 RECORDED DATE: 11 Jan 1986 RECO 12:19:50
__________________________________RDEDTIME:
I
_____________________________________LPSI___________________
I PUMP A I
PUMP B RWSi FLOW PRESSURE F
-___________________________________________ LOW PRESSURE I
"""T RECIRC SUCT DISCH SU
.( 0.0---________________________________CT RECIRC SUCT DISCH GALS 0.0 11.7 15.9 0.0 0.0 11.7 14.6 231786
) ELTA P IS :
1.1 TOTAL DYNAMIC HEAD (LPSI-A) :
1.8 TOTAL DYNAMIC HEAD (LPSI-8) DUT OF RANGE l
ECORDED DATE:
11 Jan 1986 RE
____-____-____________________ CORDED TIME: 12: 19:58
______-_-___________________________HPSI____.._________________
PUMP A I
PUMP B RWST FLOW PRESSURE
-_-_----__________________________________ FLOW PRESSURE I
- SUCT RECIR
\\_-___-_________C____________________________________C SUCT DISCH GALS SUCT DISCH SUCT RECIR l
2.9
.1 13.3 14.4 2.9
.1 14.3 1262.3 231597
'OTAL DYNAMIC HEAD (HPSI-A) :
2.6
.)TAL DYNAMIC HEAD (HPSI-B) :
2880.0 l t
/
Aasi.r. o (cent'd)
ECCS T:st Data Printcut RECORDEi) DATE: 11 Jan 1986 RECORDED TIME:
12:19:58 I
LPSI I
I FLOW PRESSURE FLOW PRESSURE I
SUCT RECIRC SUCT DISCH SUCT RECIRC SUCT DISCH GALS 0.0 0.0 11.7 15.8 0.0 0.0 11.7 14.5 23'597 DELTA P IS :
.5 TOTAL DYNAMIC HEAD (LPSI-A) :
1.7 TOTAL DYNAMIC HEAD (LPSI-B) OUT OF RANGE RECORDED DATE: 11 Jan 1986 RECORDED TIME: 12:20:33 I
HPSI I
I PUMP A I
PUMP B RWST I
FLOW PRESSURE FLOW PRESSURE I
SUCT RECIRC SUCT' DISCH SUCT RECIRC SUCT DISCH GALS 3.0
.1 14.1 14.3 3.0
.1 14.0 1261.8 230826 A.
TOTAL DYNAMIC HEAD (HPSI-A) :
.4 TOTAL DYNAMIC HEAD (HPSI-B) :
2879.6
, RECORDED DATE: 11 Jan 1986 RECORDED TIME: 12:20:33 lI LPSI
,________________________________________________________________________________'I
'I PUMP A I
PUMP B RWST I
FLOW PR FLOW PRESSURE I
l_________________________
ESSURE SUCT RECIRC SUCT DISCH SUCT RECIRC SUCT DISCH GALS 0.0 0.0 11.6 15.8 0.0 0.0 11.6 14.5 230824 DELTA P IS :
1.0 TOTAL DYNAMIC HEAD (LPSI-A) :
1.8 TOTAL DYNAMIC HEAD (LPSI-B) OUT OF RANGE i
e l RECORDED DATE: 11 RECORDED TINE: 12:21:01
<__________________Jan 1986
.I HPSI i 1
TABLE 6 (Cont'd)
-__--________-____________PrinI ECCS Test Data out I
PUMP A I
PUMP B RWST I
FLOW PRESSURE FLOW PRESSURE I
3.0
.1 14.7 14.1 3.0
.1 12.4 1164.0 230178 TOTAL DYNAMIC HEAD (HPSI-A) DUT OF RANGE -
TOTAL DYNAMIC HEAD (HPSI-B) :
2657.6 RECORDED DATE: 11 Jan 1986 RECORDED TIME: 12:21: 01 I
LPSI I
I PUMP A I
PUMP B RWST I
FLOW PRESSURE FLOW PRESSURE I
SUCT RECIRC SUCT DISCH SUCT RECIRC SUCT DISCH GALS 0.0 0.0 11.6 15.8 0.0 0.0 11.6 14.5 230179 DELTA P IS :
- 1. 0" TOTAL DYNAMIC HEAD (LPSI-A) :
1.8 _
'g TOTAL DYNAMIC HEAD (LPSI-B) OUT OF RANGE RECORDED DATE: 11 Jan 1986 RECORDED TIME: 12:21:05 I
HPSI I
I PUMP A I
PUMP B RWSi FLOW PRESSURE FLOW PRESSURE I
SUCT RECIRC SUCT DISCH SUCT RECIRC SUCT DISCH GALS 3.2
.1 14.1 14.1 3.2
.1 13.2 1164.0 230036 TOTAL DYNAMIC HEAD (HPSI-A) :
,1 TOTAL DYNAMIC HEAD (HPSI-B) :
2655.8 RECORDED DATE: 11 Jan 1986 RECORDED TIME: 12:21:05 II LPSI I
!I PUMP A I
PUMP B RWST
- I__--- FLOW---______-________ ESSURE-____-_____________ LOW PR F --______-______R_E_S_SU_R_E_________-I P
SUCT RECIRC SUCT DISCH SUCT RECIRC SUCT DISCH GALS. _.
TABLE 6 (Cont'd)
- - _ _ _ - - _ _ _ _ _ _ _ _ - _ _ _ - - _ _ - - - - - _ _ ZC23_ Int Dar?
- i rrert_ - - - _ _ _ - _ _ _ _ _ - _ _ - _ - _ _ - -
0.0 0.0 11.6 15.8 0.0 0.0 11.6 14.4 230036 DEL a P IS :
.8 TOTAL DYNAMIC HEAD (LPSI-A) :
1.7 TOTAL DYNAMIC HEAD (LPSI-B) OUT OF RANGE RECORDED DATE: 11 Jan 1986 RECORDED TIME: 12:21:12 I
HPSI I
I PUMP A I
PUMP B RWST I
FLOW PRESSURE FLOW PRESSURE I
SUCT RECIRC SUCT DISCH SUCT RECIRC SUCT DISCH GALS 3.3
.1 13.6 14.0 3.3
.1 12.4 1164.8 229862 TOTAL DYNAMIC HEAD (HPSI-A) :
1.0 TOTAL DYNAMIC HEAD (HPSI-B) :
2659.4 v
Rt.DED DATE: 11 Jan 1986 RECORDED TIME: 12:21:12 I
LPSI I
I PUMP A I
PUMP B RWST I
FLOW PRESSURE FLOW PRESSURE I
SUCT RECIRC SUCT DISCH SUCT RECIRC SUCT DISCH GALS l
0.0 0.0 11.5 15.8 0.0 0.0 11.6 14.4 229862
' DELTA P IS :
.7 TOTAL DYNAMIC HEAD (LPSI-A) :
1.7 TOTAL DYNAMIC HEAD (LPSI-B) OUT OF RANGE
- RECORDED DATE: 11 Jan 1986 RECORDED TIME: 12:22:01 I
HPSI I
I PUMP A I
PUMP B RWST 7
FLOW PRESSURE FLOW PRESSURE I
SUCT RECIRC SUCT DISCH SUCT RECIRC SUCT DISCH GALS 4.0
.1 14.4 13.7 4.0
.1 12.6 1058.3 228490.- _ -..
E TABLE 6 (Cont'd)
ECCS Tost Data Pri nem&
TOTAL DYNAMIC HEAD (HPSI-A) OUT OF RANGE TOTAL DYNAMIC HEAD (HPSI-B) :
2413.1 RECORDED DATE: 11 Jan 1986 RECORDED TIME: 12:22:01 I
I I
PUMP A I
PUMP B RWST I
FLOW PRESSURE FLOW PRESSURE
I----
SUCT RECIRC SUCT DISCH SUCT RECIRC SUCT DISCH
GALS------
0.0 0.0 11.4 15.7 0.0 0.0 11.5 14.4 228490 DELTA P IS :
.7 TOTAL DYNAMIC HEAD < LPSI-A) :
1.8 TOTAL DYNAMIC HEAD (LPSI-B) OUT OF RANGE RECORDED DATE: 11 Jan 1986 RECORDED TIME: 12:22:06 P
HPSI I
I PUMP A I
PUMP B RWST I
FLOW PRESSURE FLOW PRESSURE
I - - - -
SUCT RECIRC SUCT DISCH SUCT RECIRC SUCT D
ISCH GALS 4.0
.1 14.7 13.7 4.0
.1 12.3 1057.0 228333 TOTAL DYNAMIC HEt.D (HPSI-A) OUT OF RANGE TOTAL DYNAMIC HEAD (HPSI-B) :
2410.8 RECORDED DATE: 11 Jan 1986 RECORDED TIME: 12:22:06 I
I I
PUMP A I
PUMP B RWSI I
FLOW PRESSURE FLOW PR
.------.--------------------------------------------------- ESSURE I
SUCT RECIRC SUCT DISCH SUCT RECIRC S
UCT DISCH GALS 9.0 0.0 11.4 15.7 0.0 0.0 11.5 14.4 228333 QELTA P IS :
.7 TOTAL DYMAMIC HEAD (LPSI-A) :
1.8 TOTAL DYNAMIC HEAD (LPSI-B) OUT OF RANGE
~
TABLE 6 (Cont'd)
ECCS Test Data Printout F
.'DED DATE: 11 Jan 1986 RECORDED TIME: 12:22: 13 I
..-------------------------------------------------------------I I
PUMP A I
PUMP B RWST I
FLOW PRESSURE FLOW PR
ESSURE I
SUCT RECIRC SUCT DISCH SUCT RECIRC SUCT
DISCH GALS 4.0
.1 14.5 13.5 4.0
.1 12.7.
1058.0 228159 TOTAL OYNAMIC HEAD (HPSI-A) OUT OF RANGE TOTAL DYNAMIC HEAD (HPSI-B) :
2412.4 7ECORDED DATE: 11 Jan 1986 RECORDED TIME: 12:22:13 I
.----------------------------------------------------------------------------.-I I
PUMP A I
PUMP B RWSi FLOW PRESSURE FLOW PR I
.----_------_-----_,-----------_-------------__------------ ESSURE
,~'T RECIRC SUCT DISCH SUCT RECIRC SUCT D
GALS
ISCH
" 0.0 0.0 11.4 15.7 0.0 0.0 11.5 14.3 228159
)ELT'A P IS :
.7 TOTAL DYNAMIC HEAD ~ (LPSI-A) :
1.8 TOTAL DYNAMIC HEAD (LPSI-B) OUT OF RANGE
- ECORDED DATE: 11 Jan 1986 RECORDED TIME: 14:12:22 HPSI
.------------------------------------------------------------------------------I PUMP A I
PUMP B RWST FLOW PRESSURE FLOW
PRESSURE I
SUCT RECIRC SUCT DISCH SUCT RECIRC S
UCT DISCH GALS 0.0 0.0 14.8 13.6 0.0 0.0 14.6 25.9 235145 TOTAL DYNAMIC HEAD (HPSI-A) OUT OF RANGE TOTAL DYNAMIC HEAD (HPSI-B) :
25.9 ECORDED DATE: 11 Jan 1986 RECORDED TIME: 14:12:22
_n_
r ECCS Test Dath Print
.______,___-______-_____________-________________-___out LPSI I
PUMP A I
PUMP B RWST l
FLOW PRESSURE FLOW PRESSURE I
~
RECIRC SUCT DISCH SUCT RECIRC SUCT DISCH GALS
.5 0.0 11.8 325.4
.5 0.0 11.9 14.4 235145 JELTA P IS :
.9 TOTAL DYNAMIC HEAD (LPSI-A) :
715.6 TOTAL DYNAMIC HEAD (LPSI-B) OUT OF RANGE lECORDED DATE: 11 Jan 1986 RECORDED TIME: 14:12:30 HPSI I
PUMP A I
PUMP B RWST FLOW PRESSURE FLOW PRESSURE I
SUCT RECIRC SUCT
. DISCH SUCT RECIRC SUCT DISCH GALS 0.0 0.0 14.8 13.7 0.0 0.0 14.6 25.4 2351a5 i
0fAL DYNAMIC HEAD (HPSI-A) OUT OF RANGE TOTAL DYNAMIC HEAD (HPSI-B) :
24.9 ECORDED DATE: 11 Jan 1986 RECORDED TIME: 14:12:30 LPSI I
FLOW PRESSURE FLOW PRESSURE I
SUCT RECIRC SUCT DISCH SUCT RECIRC SUCT DISCH GALS
.5 0.0 11.9 325.4
.5 0.0 11.9 14.4 235!45 lELTAPIS:
.9 l
TOTAL DYNAMIC HEAD (LPSI-A) :
715.5 TOTAL DYNAMIC HEAD (LPSI-B) OUT OF RANGE i
iE
. SED DATE: 11 Jan 1986 RECORDED TIME: 14:15:30 HPSI I
ECCS Test.
Data Printout I
. PUMP A I
PUMP B-RWST I
FLOW PRESSURE FLOW
_---------_--------_--------_-------_--------------PRESSURE I
SUCT RECIRC SUCT DISCH SUCT RECIRC S
-_-------_--_----------_--_--_--_------_-----_-------_UCT DISCH GALS 1.0 0.0 14.7 13.6 0.0 0.0 14.6 25.8 233978 TOTAL DYNAMIC HEAD (HPSI-A) OUT OF RANGE TOTAL DYNAMIC HEAD (HPSI-B) :
26.0 d
RECORDED DATE: 11 Jan 1986 RECORDED TIME: 14:15:30 I
--_--__------------------------------------------------------------------------I I
PUMP A I
PUMP B RNST I
FLOW PRESSURE FLOW P
_---------_-------------_------------------_-----_-----RESSURE I
SUCT RECIRC SUCT DISCH SUCT RECIRC
___---_---_---_---_--__-_-_-_-_-_----_-_--_SUCT DISCH GALS 6.9 0.0 11.6 311.5 6.9 0.0 11.6 14.1 233978 DELTA P IS :
.9 TOTAL DYNAMIC HEAD (LPSI-A) :
684.1 TOTAL DYNAMIC HEAD (LPSI-8) OUT OF RANGE
(
RECORDED DATE: 11 Jan 1986 RECORDED TIME: 14:15:34 LI HPSI
_----------___---_--_,-----------_--_-------------_---------------I
'I PUMP A I
PUMP B RWST
- I FLOW PRESSURE FLOW PRE
_--------------------------------_--_----------- SSURE I
SUCT RECIRC SUCT DISCH SUCT RECIRC SUCT
_------------------------------------------------_-------- DISCH GALS 0.0 0.0 14.7 13.6 0.0 0.0 14.5 26.1 233852 TOTAL DYNAMIC HEAD (HPSI-A> 0UT OF RANGE TOTAL DYNAMIC HEAD (HPSI-B) :
26.8 RECORDED DATE: 11 Jan 1986 RECORDED TIME: 14:15:34
[
.------------------------------------------------------------------------------I
'[
PUMP A I
PUMP B RWST FLOW PRESSURE F
PRESSURE I
.--------_---------_----------------------- LOW SUCT RECIRC SUCT-DISCH SUCT RECIRC SUCT DISCH GALS
... -----_------------_---_--__--------_------_----_-_--------------------------- l
TABLE 6 (Cont'd)
ECCS Test Data Printout
'7.1 0.0-11.6 312.4 7.1 0.0 11.6 14.3 233852 0
,.1 P IS :
1.1 TDTAL DYNAMIC HEAD (LPSI-A) :
686.2 TOTAL DYNAMIC HEAD (LPSI-B) OUT OF RANGE RECORDED DATE: 11 Jan 1986 RECORDED TIME: 14:16: 14 I
._______________________________________________________________________________I I
PUMP A I
PUMP B RNST i
FLOW PRESSURE FLOW
.__________________________________________________________ PRESSURE I
SUCT RECIRC SUCT DISCH SUCT REC SUCT DISCH GALS
._'________________________________________________IRC 0.0 0.0 14.5 13.6 0.0 0.0 14,4 25.7 231676 TDTAL DYNAMIC. HEAD (HPSI-A) OUT OF RANGE TDTAL DYNAMIC HEAD (HPSI-B) :
26.1 F 'OED DATE: 11 Jan 1986 RECORDED TIME: 14:16: 14 4
.__.___________________________________________________________________________ _1 PUMP A I
PUMP B RWST FLOW PRESSURE FLOW
__________________________________________________________ PRESSURE I
SUCT RECIRC SUCT DISCH SUCT RECIR
___________________________________________________C SUCT DISCH GALS 10.9 0.0 11.3 292.9 10.9 0.0 11.3 13.8 23167G ELTA P IS :
1.0 TOTAL DYNAMIC HEAD (LPSI-A) :
641.9 TOTAL DYNAMIC HEAD (LPSI-8) DUT OF RANGE ECORDED DATE: 11 Jan 1986 RECORDED TIME: 14:16:1
____--____________________________________________6_____________________________
____..__________________________________________________________________________I PUMP A I
PUMP B FLOW PRESSURE FLOW RWST
-_-___---___________________________________________ PRESSURE I
li RECIRC SUCT DISCH SUCT R
_-_---__--____________________________________ECIRC SUCT DISCH GALS 0.0 0.0 14.5 13.5 0.0 0.0 14.4 25.9 231455 -
TABLE 6 (Cont'd)
'ECCS Tost Data Printout
~
, TOTAL DYNAMIC HEAD (HPSI-A) DUT OF RANGE TOTAL DYNAMIC HEAD (HPSI-B) :
26.6 RECORDED DATE: 11 Jan 1986 RECORDED TIME: 14:16:16 I
LPSI I
I PUMP A I
PUMP B RWST I
FLOW PRESSURE FLOW PRESSURE I
SUCT RECIRC SUCT DISCH SUCT RECIRC SUCT DISCH GALS 10.9 0.0 11.3 292.6 10.9 0.0 11.3 13.8 231455
{
DELTA P IS :
.9 TOTAL DYNAMIC HEAD (LPSI-A) :
641.3 TOTAL DYNAMIC HEAD (LPSI-B) OUT OF RANGE RECORDED DATE: 11 Jan 1986 RECORDED TIME: 14:16:51
~
HPSI I
I%
PUMP A I
PUMP B RWST I
FLOW PRESSURE FLOW PRESSURE I
SUCT RECIRC SUCT DISCH SUCT RECIRC SUCT DISCH GALS 0.0 0.0 14.4 13.4 0.0 0.0 14.2 25.2 228859 TOTAL DYNAMIC HEAD (HPSI-A) OUT OF RANGE TOTAL DYNAMIC HEAD (HPSI-B) :
25.3 RECORDED DATE: 11 Jan 1986 RECORDED TIME: 14:16:51 I
LPSI I
I PUMP A I
PUMP B RWST I-FLOW PRESSURE FLOW PRESSURE I
SUCT RECIRC SUCT DISCH SUCT RECIRC SUCT DISCH GALS 12.7 0.0 11.0 274.8 12.7 0.0 11.0 13.4 228859 JELTA P IS :
.9 TOTAL DYNAMIC HEAD (LPSI-A) :
600.8 TOTAL DYNAMIC HEAD (LPSI-B) OUT OF RANGE
+
TABLE 6 (Cont'd)
ECCS Test Data PEintout R"'1RDED DATE: 11 Jan 1986 RECORDED TIME: 14:16:55 I
HPSI I.
I PUMP A I
PUMP B RWST I
FLOW PRESSURE FLOW PRESSURE I
SUCT RECIRC SUCT DISCH SUCT RECIRC SUCT DISCH GALS 0.0 0.0 14.4 13.3 0.0 0.0 14.2 25.5 228553 TOTAL DYNAMIC HEAD (HPSI-A) DUT OF RANGE TOTAL DYNAMIC HEAD (HPSI-B) :
25.9 RECORDED DATE:' 11 Jan 1986 RECORDED TIME: 14:16:55 I
LPSI I
I PUMP A I
PUMP B RWST I
FLOW PRES 5URE FLOW PRESSURE I
_SUCT RECIRC SUCT DISCH SUCT RECIRC SUCT DISCH GALS k
3.0 0.0 10.9 274.4 13.0 0.0 10.9 13.5 228553 DELTA P IS :
.8 TOTAL DYNAMIC HEAD (LPSI-A) :
600.2 TOTAL DYNAMIC HEAD (LPSI-B) OUT OF RANGE RECORDED DATE: 11 Jan 1986 RECORDED TIME: 14:17: 47 I
HPSI I
I PUMP A' I
PUMP B RWST I
FLOW PRESSURE FLOW PRESSURE I
SUCT RECIRC SUCT DISCH SUCT RECIRC SUCT DISCH GALS 0.0 0.0 14.1 13.1 0.0 0.0 13.9 25.5 223997 TOTAL DYNAMIC HEAD (HPSI-A) OUT OF RANGE TOTAL DYNAMIC HEAD (HPSI-B > :
26.6 RECORDED DATE: 11 Jan 1986 RECORDED TIME: 14:17: 47
meLe e tCent c; I
ECCS Tgst Data Printout LPS.
I PUMP A I
PUMP B RNST I
FLOW PRESSURE FLOW PRESSURE I
' _T RECIRC SUCT DISCH SUCT RECIRC SUCT DISCh GALS 12.3 0.0 10.5 260.5 12.3 0.0 10.5 13.0 223997 DELTA P IS :
.9 TOTAL DYNAMIC HEAD (LPSI-A) :
568.9 TOTAL DYNAMIC HEAD (LPSI-B) OUT OF RANGE RECORDED DATE: 11 Jan 1986 RECORDED TIME: 14:17:53 I
PUMP A I
PUMP B RWST I
FLOW PRESSURE FLOW PRESSURE I
SUCT RECIRC SUCT DISCH SUCT RECIRC SUCT DISCH GALS 0.0 0.0 14.1 13.0 0.0 0.0 13.8 25.3 223300 TOTAL DYNAMIC HEAD (HPSI-A) OUT OF RANGE f0TAL DYNAMIC HEAD (HPSI-B) :
26.3 9ECORDED DATE: 11 Ja.n 1986 RECORDED TIME: 14:17:53 I
,I I
PUMP A I
PUMP B RWST
.I FLOW PRESSURE FLOW PRESSURE I
SUCT RECIRC SUCT DISCH SUCT RECIRC SUCT DISCH GALS 14.4 0.0 10.5 260.2 14.4 0.0 10.5 13.3 223366 l
JELTA P IS :
.7 TOTAL DYNAMIC HEAD (LPSI-A) :
568.3 TOTAL DYNAMIC HEAD (LPSI-B) OUT OF RANGE 7
JED DATE: 11 Jan 1986 RECORDED TIME: 14:18:00
,I HPSI I
'I-PUNP A I
PUMP B RWST -
r TAl$LE 6 (Cont'd)
ECCS Tent nata Printout I
FLOW PRESSURE FLOW P
____________________________________________________________RESSURE I
SUCT RECIRC SUCT DISCH SUCT RECIRC SUCT
---_-_-___________________________________DISCH GALS 0.0 0.0 14.0 12.9 0.0 0.0 13.9 25.8 222830 TOTAL DYNAMIC HEAD (HPSI-A) OUT OF RANGE' TOTAL DYNAMIC HEAD (HPSI-B) :
27.4 RECORDED DATE: 11 Jan 1986 RECORDED TIME: 14:18:00
'I LPSI
._______________________________________________________________________________I_
I PUNP A I
PUNP B RWST I
FLOW PRESSURE FLOW PRESSUR
-________________________________________________________-_-_____E I
SUCT RECIRC SUCT DISCH SUCT RECIRC SUCT DIS
____________________________CH GALS 14.4 0.0 11.5 128.1 14.4 0.0 11.5 17.3 222830
) ELTA P IS :
.8 TOTAL DYNAMIC HEAD (LPSI-A) :
261.1 TOTAL DYNAMIC HEAD (LPSI-B) :
5.4 RECORDED DATE: 11 Jan 1986 RECORDED TIME: 14:48:13 HPSI PUMP A I
PUMP B RWST FLOW PRESSURE FLOW PRESSURE I
SUCT RECIRC SUCT DISCH SUCT RECIRC SUCT DISCH GALS TOTAL DYNAMIC HEAD (HPSI-A) OUT OF RANGE l
TOTAL DYNAMIC HEAD (HPSI-B) :
35.7 l
1 ECORDED DATE: 11 Jan 1986 RECORDED TIME:.14:48: 13 l
,_____-____________________________,____________________________________________I PUMP A I
PUMP B RWST FLOW PRESSURE FLOW P
l
_------_____________________________________________RESSURE I
SUCT RE__
_ _ _ _ - _ - _ - - _ C I R_ C_ _ _ _ _ S U_ C T_ ______ DIS _CH_ _ _ _ _ _ _ _ _ S_ U_
.3
.3 11.9 15.6
.3
.3 11.5 334.4 233820 _
9 e
g I
TABLE 6 (Cont'd)
ECCS Test Dita Printout
) ELTA P IS :
.9 TOTAL DYNAMIC HEAD (LPSI-A) :
.6 TOTAL DYNAMIC HEAD (LPSI-B> :
737.1
- ECORDED DATE: 11 Jan 1986 REC
._______________________________ORDEDTIME: 14:48:17
.______________________-_____________HPSI_____.____________
PUMP A I
PUMP B RWST FLOW PRESSURE
--________________________________________ FLOW PRESSURE I
SUCT RECIRC SUCT DISC SUCT RECIRC SUCT.
DISCH
________________________-._____H_________-________________
.1 0.0 14.7 13.7
.1 0.0 14.5 29.5 233820 TOTAL DYNAMIC HEAD (HPSI-A) OUT OF RANGE TOTAL DYNAMIC HEAD (HPSI-B) :
34.5 ECORDED DATE: 11 Jan 1986 RECOR 14:48: 17
_________-_______________________DED TIME:
__________________________________________________________________________I PUMP A I
PUNP B RWST FLOW PRESSURE
._________________________________________ FLOW PRESSURE I
SUCT RECIRC SUCT DISCH
.________--_________________-________SUCT RECIRC SUCT DISCH GALS
.3
.3 11.8 15.7
.3
.3 1-1.7 334.4 233820
- LTA P IS :
1.1 TOTAL DYNAMIC HEAD (LPSI-A) :
1.0 l
TOTAL DYNAMIC HEAD (LPSI-B) :
736.7
, CORDED DATE:
RECORDED TIME: 14:48:30 l______________11 Jan 1986 i
l______________________-________--__HPSI I
PUMP A I
PUNP B RWST FLOW PRESSURE i
_________________________________________ FLOW PRESSURE I
l SWT RECIRC SUCT DISCH SUCT SUCT DISCH GALS
__-____________________________________RECIRC
.i 0.0 14.6 13.6
.1 0.0 14.5 29.8 233663 i
i TOTAL DYNAMIC HEAD (HPSI-A) OUT OF RANGE
\\
- i
(
Anaub u t %. V A 4 L.
Uf ECCS Test D'afa P'rintout TOTAL DYNAMIC HEAD (HPSI-B) :
35.3
(
tL SED DATE: 11 Jan 1986 RECORDED TIME: 14:48:30 LPSI I
I PUMP A I
PUMP B RWST I
FLON PRESSURE FLOW PRESSURE I
SUCT RECIRC SUCT DISCH SUCT RECIRC SUCT DISCH GALS
.6
.3 11.6 16.0
.6
.3 11.5 333.0 233663 JELTA P IS :
.9 TOTAL DYNAMIC HEAD (LPSI-A) :
2.0 TOTAL DYNAMIC HEAD (LPSI-B) :
733.8 RECORDED DATE: 11 1986 RECORDED TIME: 14:49:02
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _- J a n I
HPSI I
PUMP A I
PUMP B RWST 15 FLOW PRESSURE FLOW PRESSURE I
_ h.
SUCT RECIRC SUCT.
DISCH SUCT RECIRC SUCT DISCH GALS
.1 0.0 14.5 13.5
.1 0.0 14.4 29.4
~231455 TOTAL DYNAMIC HEAD (HPSI-A) OUT OF RANGE TOTAL DYNAMIC HEAD (HPSI-B) :
34.5 RECORDED DATE: 11 Jan 1986 RECORDED TIME: 14:49:02 I
LPSI I
I PUMP A I
PUMP B RWST
- I FLOW PRESSURE FLOW PRESSURE I
SUCT RECIRC SUCT DISCH SUCT RECIRC SUCT DISCH GALS 12.7
.2 11.3 15.2 12.7
.2 11.5 311.0 231455
.E P IS :
.8 TOTAL DYNAMIC HEAD (LPSI-A) :
.9 TOTAL DYNAMIC HEAD (LPSI-B) :
683.1
! l l
TABLE 6 (Cont'd) 1 ECCS Test Data P'rintout RECORDED DATE: 11 Jan 1986 RECORDED TIME: 14:49:09 I-HPSI I
I PUMP B RWST I
PUMP A I
FLOW PRESSURE FLOW PRESSURE I
SUCT RECIRC SUCT DISCH SUCT RECIRC SUCT DISCH GALS
.1 0.0 14.5 13.5
.I 0.0 14.4 30.1 231092 TOTAL DYNAMIC HEAD (HPSI-A) OUT 0F RANGE TOTAL DYNAMIC HEAD (HPSI-B) :
36.3
. RECORDED DATE: 11 Jan 1986 RECORDED TIME: 14:49:09
$ I LPSI I
I PUMP A I
PUMP B RWST I
FLOW PRESSURE FLOW PRESSURE I
SUCT RECIRC SUCT DISCH SUCT RECIRC SUCT DISCH GALS
,r12.3
.2 11.3 15.3 12.3
.2 11.4 319.5 231092
- (
DELTA P IS :
.7 TOTAL DYNAMIC HEAD (LPSI-A) :
1.2 TOTAL DYNAMIC HEAD (LPSI-B) :
703.0
- RECORDED DATE
- 11 Jan 1986 RECORDED TIME: 14:49:20 I
HPSI I
1 FLOW PRESSURE FLOW PRESSURE I
SUCT RECIRC SUCT DISCH SUCT RECIRC SUCT DISCH GALS
.1 0.0 14.5 13.4
.1 0.0 14.3 30.0 230430 i
TOTAL DYNAMIC HEAD (HPSI-A) OUT OF RANGE i
TOTAL DYl(AMIC HEAD (HPSI-B > :
36.2 t
4 1
RECORDED DATE: 11 Jan 1986 RECORDED TIME: 14:49:20 I
LPSI I
WrA Tent Data Printout I
PUMP A I ~
PUMP B RWST I
FLOW PRESSURE FLOW
.----____________-_-_-_----_---___________________________ PRESSURE I
SUCT RECIRC SUCT DISCH
.SUCT RECIRC S
____________________________________________________UCT DISCH GALS
.6
.2 11.2' 15.1 10.6
.2 11.2 306.3 230430 JELTA P IS :
1.0 TOTAL DYNAMIC HEAD (LPSI-A) :
1.O TOTAL DYNAMIC HEAD (LPSI-B) :
673.1 RECORDED DATE: 11 Jan 1986 RECORDED TIME: 14:49:27 I
._______________________________________________________________________________I i
PUMP A I
PUMP B RWST I
FLOW PRESSURE FLOW P
I
___________________________________________________________RESSURE SUCT RECIRC SUCT DISCH SUCT RECIRC SU
.________________________________________________________CT DISCH GALS
.1 0.0 14.4 13.4
.1 0.0 14.3 29.4 22997'.
TOTAL DYNAMIC HEAD (HPSI-A) OUT OF RANGE TOTAL DYNAMIC HEAD (HPSI-B) :
34.7 L.
!ECORDED DATE: 11 Jan 1986 RECORDED TIME: 14:49:27 LPSI
_______________________________________________________________________________I PUMP A I
PUMP B RWST FLOW PRESSURE FLOW PRESSURE
___________________________________________________________________________I SUCT RECIRC SUCT DISCH SUCT RECIRC SUCT
______________________________________________________________DISCH GALS 10.1
.2 11.2 15.2 10.1
.2 11.3 306.0 229973 ELTA P IS :
.8 TOTAL DYNAMIC HEAD (LPSI-A) :
1.3 TOTAL DYNAMIC HEAD (LPSI-B) :
672.1 l
- ECORDED DATE
- 11 Jan 1986 RECORDED TIME: 14:49:44 i_.
HPSI I
l FLOW PRESSURE FLOW PRESSURE I
- T
w L t.
o tCon-*cj
~ ECCS Teht' Data Print'but SUCT RECIRC SUCT DISCH SUCT RECIRC SUCT DISCH GALS
.1 0.0 14.4 13.4
.1 0.0 14.2 29.4 228695 TOTAL DYNAMIC HEAD (HPSI-A) OUT OF RANGE TOTAL DYNAMIC HEAD (HPSI-B) :
35.0 RECORDED DATE: 11 Jan 1986 RECORDED TIME: 14:49:44 LPSI I
I PUMP A I
PUMP B RWST I
FLOW PRESSURE FLOW PRESSURE
.I SUCT RECIRC SUCT DISCH SUCT RECIRC SUCT DISCH GALS 10.3
.2 11.1 14.6 10.3
.2 10.7 281.0 228695
- ) ELTA P IS :
.9 TOTAL DYNAMIC HEAD (LPSI-A) :
.2 TOTAL DYNAMIC HEAD (LPSI-B) :
615.7 RECORDED DATE: 11 Jan 1986 RECORDED TIME: 14:49: 48 HPSI I.
PUMP A I
PUMP B RWST FLOW PRESSURE FLOW PRESSURE I
SUCT RECIRC SUCT DISCH SUCT RECIRC SUCT DISCH
.._____________________-___________________________________________________ GALS
.1 0.0 14.4 13.3
.1 0.0 14.2 29.8 228317 TOTAL DYNAMIC HEAD (HPSI-A) OUT OF RANGE TOTAL DYNAMIC HEAD (HPSI-B) :
36.O lECORDED DATE: 11 Jan 1986 RECORDED TIME: 14:49:48 LPSI
.___________________________________________-_________-_________________________I PUMP A I
PUMP B RWSi FLOW PRESSURE FLOW PRESSURE I
SUCT RECIRC SUCT DISCH SUCT RECIRC SUCT DISCH GALS 10.6
.2 10.8 14.8 10.6.
.2 11.0 280.9 228317 I
TABLE 6 (Cont'd)
ECCS Test DatE Printout DELTA P IS :
.9 TOTAL DYNAMIC HEAD (LPSI-A) :
1.3 TOTAL DYNAMIC HEAD (LPSI-B) :
614.9 RECORDED DATE: 11 Jan 1986 RECORDED TIME: 14: 50:04 HPSI I
I PUMP A I
PUMP B RWS1 I
FLOW PRESSURE FLOW PRESSURE I
1 "5UUi kkUiRU sDUi bisUH s0Ui R5UiRU 50di 65555"~~~~ GAL 5~~
~'"~
~~~
'~~~
TOTAL DYNAMIC HEAD (HPSI-A) OUT OF RANGE TOTAL DYNAMIC HEAD (HPSI-B) :
34.9 RECORDED DATE: 11 Jan 1986 RECORDED TIME: 14:50:04 I/~
LPSI I
ay I
PUMP A I
PUMP B RWST I
FLOW PRESSURE FLOW PRESSURE I
SUCT RECIRC SUCT DISCH SUCT RECIRC SUCT DISCH GALS
' DELTA P IS :
1.1 TOTAL' DYNAMIC HEAD (LPSI-A) :
1.8 TOTAL DYNAMIC HEAD (LPSI-B) :
588.5 t
RECORDED DATE: 11 Jan 1986 RECORDED TIME: 14:50:09 I
HPSI I
I PUMP A I
PUMP B RWSI I
FLOW PRESSURE FLOW PRESSURE I
SUCT RECIRC SUCT DISCH SUCT RECIRC SUCT DISCH ^
GALS v
.1 0.0 14.3 13.2 1
0.0 14.1 29.6 226441 TOTAL DYNAMIC HEAD (HPSI-A) OUT OF RANGE TOTAL DYNAMIC HEAD (HPSI-B) :
35.9.-
TABLE 6 (Cont'd) tCd5 Test Deta Printout R
9DED DATE: 11 Jan 1986 RECORDED TIME: 14: 50:09 I
L' PSI I
I PUMP A I
PUMP B RWST I
FLOW PRESSURE FLOW PRESSURE I
SUCT RECIRC SUCT DISCH SUCT RECIRC SUCT DISCH GALS 15.2
.2 10.6 14.4 15.2
.2 10.5 269.6 226441 DELTA P IS :
.9 TOTAL DYNAMIC HEAD (LPSI-A) :
.7 TOTAL DYNAMIC HEAD (LPSI-B) :
590.0 RECORDED DATE: 11 Jan 1986 RECORDED TIME: 14: 50: 19 I
HPSI I
I PUNP A I
PUMP B RWSi D
FLOW PRESSURE FLOW PRESSURE I
1 boCT RECIRC SUCT DISCH SUCT RECIRC SUCT DISCH GALS
.1 0.0 14.2 13.1
.1 0.0 14.1 29.1 225447 TOTAL DYNAM!C HEAD (HPSI-A> OUT OF RANGE TOTAL DYNAMIC HEAD (HPSI-B) :
34.8 RECORDED DATE: 11 Jan 1986 RECORDED TIME: 14: 50:19 I
LPSI I
I FLOW PRESSURE FLOW PRESSURE I
SUCT RECIRC SUCT DISCH SUCT RECIRC SUCT DISCH GALS 15.1
.2 10.6 14.3 15.1
.2 10.5 269.4 225447 C
' P IS :
.9 TOTAL DYNAMIC HEAD (LPSI-A) :
.7 TOTAL DYNAMIC HEAD (LPSI-B) :
589.4 TABLE 6 (Cont'd)
FerA Test Date Printout RECdRDEDDATE: 11 Jan 1986 R
---_------_------------_-_---_ECORDED TIME: 14:50:26 I
--_-_-_----_-----__--__-_------__--_--_-____------_-__-_____---_-_---------I I
PUMP A I
PUMP B RWST I
FLOW PRESSURE FLOW P
.-__-------_--_-____--_-_-_-_-__----_-_-_--_-_--__-__----__RESSURE I
SUCT RECIRC SUCT DISCH SUCT RECIR
.--_-_--__-_-----_-----_---_-__--__-------__--___- C SUCT DISCH GALS
.1 0.0 14.2 13.1
.1 0.0 14.0 29.3 224817 TOTAL DYNAMIC HEAD (HPSI-A) OUT OF RANGE TOTAL DYNAMIC HEAD (HPSI-B) :
-35.4 (ECORDED DATE: 11 Jan 1986 RECORDED TIME: 14:50:26 s
.---------_--__----------_-_-_-----_--_------_-_---__--_-_---------------_-----I PUMP A I
PUMP B RWST FLOW PRESSURE FLOW
.--_-_----------------_--------------------_------------- PRESSURE I
SUCT RECIRC SUCT DISCH SUCT RECIRC
.--_--------_-----_-------_---------_---------------_- SUCT DISCH GALS 15.1
.2 10.7 14.2 15.1
.2 10.4 272.4 22481?
(
- ) ELTA P IS :
1.0 TOTAL DYNAMIC HEAD (LPSI-A) :
.2 TOTAL DYNAMIC HEAD (LPSI-B) 596.6 ECORDED DATE: 11 Jan 1986 RECORDED TIME: 14: 50:34 HPSI
_---_------_-_---------------_---_-----_-----_-------------------------- I PUMP A I
PUMP B RWST FLOW PRESSURE FLOW
__----_-----------------_-_--_-----------_..--_--- PRESSURE I
SUCT RECIRC SUCT DISCH SUCT REC
_-----------------------IRC SUCT DISCH GALS
.1 0.0 14.1 13.1
.1 0.0 13.9 29.1 224044 TOTAL DYNAMIC HEAD (HPSI-A) OUT OF RANGE TOTAL DYNAMIC HEAD (HPSI-B) :
34.9 ELUNDED DATE: 11 Jan 1986 RECORDED TIME: 14:50:34 TABLE e (Lont'ai ECCS Test Data Printout I
PUMP A I
PUMP B
'RWS7 I
FLOW PRESSURE FLOW PRES $URE 7.
9UCT RECIRC SUCT DISCH SUCT RECIRC SUCT DISCH GA;S
'.1
.2 10.5 14.3 15.1
.2 10.3 270.3 224044 DELTA P IS.:
1.1
~~~
TOTAL DYNAMIC HEAD (LPSI-A) :
.8 TOTAL DYNAMIC HEAD (LPSI-B) :
591.9
(.'
9 REFERENCES 1.
NUSCO Memo NE-85-SA8-182 dated July 9, 1985, " Full Flow Test of HPSI and LPSI Systems" from J. A. Blaisdell/A. Gharakhani to J. L. Delawrence.
2.
NUSCO Safety Evaluation No. ISE/CY-85-076 dated November 5, 1985,
" Full Finw Test of HPSI and LPSI Systems" by J. A. Blaisdell.
3.
Connecticut Yankee Technical Specifications, Section 3.6, " Core Cooling Systems," April 29, 1985.
4.
Karassik, I.
J., et al., Pump Handbook, McGraw-Hill, Inc., 1976.
5.
CY Isometric Drawing No. 16103-20231, Sh. 105EB, HPSI Suction - Primary Auxiliary Building, dated July 7, 1979.
6.
CY Isometric Drawing No. 16103-20231, Sh. 105GA, HPSI Discharge -
Primary Auxiliary Building, dated August 1,1979.
i.
7.
CY Isometric Drawing No. 16103-20231, Sh. 105H, LPSI (Suction),
dated August 2, 1979.
8.
CY Isolation Drawing No. 16103-20231, Sh. 105J, LPSI Discharge, dated August 3, 1979.
9.
Higgins, P., Northeast Utilities Engineering Calculation No. 83-102-335 GM, Connecticut Yankee Determination of Minimum Head-Flow Curves for the HPSI - LPSI Pumos Based Upon the Interim Acceptance Criteria LOCA Analysis, April 13, 1984.
)
10.
Selby, Samuel M. Ph.D., Standard Mathematical Tables, The Chemical Rubber Company, 1967.
I APPENDIX I "A" HPSI RETEST CALCULATION J -
- 4. g i
l f
t t
NORTHEAST UTILITIE5 5ERVICE LUMPANY escur s.eo
. SUBJECT SY DATE CHED.8Y DATE CALC.NO.
R E Y.
SHEET No.
OF T0TAL DYAIAMle Heao C^ t.cv t. A ri on
- A' HPSI Pump Re rest FOR THE AT CONN E CTicVT YA N k E E A east i o, 19 s(,
Ca t.cui ari o n No.
Iso 2: 45 or a, as
(
Re vi s ieN o
a.
s. r.
w., a mea.s Pa s e....
By M # #A d, du R.viawe3 8y b:6,uny c-/-56 erd 06 e e A PPR OVE D bY I 2! b I-l
'33:297 m MUM a rt tab i u t iLilitS htMVICE COMP ANY
- HPsr L m e hra av D. r, R ie,, L oATE v/ir/e4 CHKO. 8Y DATE CALC. NO.13aal#C 013 #r REv.
8
$HE ET NO.
OF M BLE OF CO NTE MTS Py e.
hVRPOSE l
Summany I
C oueuvsnous 2
Rareasme.s a
E co Ars en 6
Seou Eev+Ticu 7
Fisuqes z. 3 0.-s l
A HPsI Pume Reresr 4
1 1
TABLE 5 1
A HPSI R ETesT ba rA 5
i i
1 I-2
NORTHEAST UTILITIES SERVICE COMPANY
- c:czer s.eo ffbf SUBJ E CT CY
'd N AS"I k E*f7AT b7A BY hak OATE
- /
CHKO. BY DATE C ALC. NC.(30 2f 4 ef 3, # E R E V.
O 5HE ET NQ.
Op Y
PunPose_:
Tws5 c.a t t u t A r io n w/As Pe n Fosm en To osgivE THE TOTAL D yNamic Hean ko a) von e..ee e,xA p.,ur
'A
HPEI F u t.L F Lo W Test o n.
r s a Retoabtb ; b utiarc, Tt+t E OM P, Adh To GENeCATE TR E-Nt4b V easus F L.w c.u n.v e, l
I
\\
l hv M M AR Y.*
A' note s to w Test w 4.s PeApoamed o n TH e 'A p p tr PUMP pe c CowuecnevT-Y4uvre PtavT s o < u e ittAac c I
F r.o ceb uc e S U R 5. z - I o (..
PRessvec
^^>b Fto w e4 a4meTecs I
We C E.
R e cod b e b A Alb ARE L.iS Ts.b IN YAG Le l, OgjLY ONE.
( te.v tars o # Was Pov:beb To SHOW Ho wJ TcTAL HGAb kih5
- c. A t c vC A T E D SINCG GhC H b o+TA pe sW T OTI q zg b TM y
54 E.
Equ A rgon, Fievae i
su.w3 Tae c,s arsica t gesucTs j l
E 757 W 5T H AN OVEC L* D PLo TS o F T+E Pacevi coS Fump l
i.
TEST DATA FAoM.TeMv44.y 11,19 % 6 PasoR To Mo bl F iC ATIC NS #
j l
Te AA ac u P wT u se.e #1 't 90Mb to Av e M#
t-3
NZRTHEAST UTILITIE5 5ERVICE COMPANT soias7 s.co E.7. ht:(dL DATE M f 8J 86
$U BJE CT C,Y N P S I.
kefesf DATA BY CHKO.8Y DATE O
CALC.NQ.!bOMl'dI OI3 REV-
$MEETNQ.
k QF Y
Ccoeuvs,oas :
ResucTs op ras T spsr POMP RETEST beMcW sTRATFA AN iM pro v e meuf IN -rw t POMP PERMMAMcE.
6 ( A-f t4 1 G A L.
Ref ftes en T A ria n on Tac R e. Tis T DATA WAs MAbt on A HEAs Var. sus F low C,U W.VC AND CoM P440 TO THE TAMuMy 4 Test b ATA AND M4MOFACTURrg 's D ATA.
Tats COMP A Af s cV IM6 scat 6D THAT THE Rervsr gesucTs H+s sogressGD Trtt Fevuv5 96dFo4MANCf.
1 l ee-A HPSI Fump RsvesT-d *rn saowes Au ovee Ai.i.
i lMCREASE IN PVMP F LO'W o VTPur ) AboVE THE AeCutAtar#T5
- 3. fo. I. 4, Cons Coei.suG $ vsrum PoMas, oc rws 5T47s0 iN SECTi oN b ou M Ge,TICVT YAN aceC Te cHNi c, A L $PGc,LEICAriaMG.
"I'H 6 IIE' C U LTS FRom Twss -rest C,0 4 C t. u b t T'%T THE 'A' H Ps I Pump hesems 16 Act E PTA B LE.
i i
f I
[-4
e HERTHEAST UTILITIES SERYlCE COMPANY a
sceas7 m SY
. I. t r o l OATE
'l 'I 8 C SUBJECT CY 4
Q $3I k tMS T*
hamt CHKO.8Y DATE CALC. NQ. l3 0 2t( e n ( $6 R E Y. O
$ MEET NC.
8 or 7
Reps atuces :
!)
Couu.cr c u r
% ue Svavsiu.4 ace Pa.oc ewae.
Suq 5. 7 -106, Futt F t.oW Tes t oF HPSI AMb LD sr s vsrems.
J) bo WecTsev r-V4NKEE Tecsu.cu G c,,,c.7,..,,
SGtTs a d 2. b ;
Coat Cocu u C3 $yrn m[
A pot 21,ng P. 3 -i o.
3)
Ca us C~< ~ v, p u ~
cev,ss, %,u,ese P m e e-No, 841 #; 1176; p.3-2, 4)
Museo Memo G RE -s 6-2 6G 04,se M 44e,y ig, i9 e6,' C.Y -
E vavari ou on 'A' HPSI Po m e N euc W ena duct " F Aom T. w. NG vo W. b. B A4.Te ca.
l l
1 1
I-3
I-Op ?.T. Pikal 4lirlec G\\e.Na,13ewt(en,A6 Rev.O sk=4 klo.
9
.c
'I CONNECTICUT YINKEE 1986 ECCS FLOW TEST A HPSI PUMP RETEST l
APRIL 10,1986 3400' I
I i
I l
3200-1 i
I i
i 3000--
l
+
x x xx i
l 1
T 2800-I
\\
O T
l A
L 2600-J i
I J
4 D
Y i
4 N 2400-A, 3
l I
e-----------------------xm C 2200-
-, g-r H
E i A 2000-10 i
i i
1 n 1800-r l
\\
E' l
~
r
\\
E 1600-i T
I 1400-t s
i i
I i
1200-t 1000-- r * --
i ' *
+ ~ i r
L* +
O 400 800 1200 1600 2000 2400 2800 FLOW RATE (GPM) i{
RETEST DATA xxxxxx JANUARY TEST DATA NOTE. Consult Reicb;l.ty Engineering pr or to use for subsequent DBA cnclys,s.
t FIGURE 1 l
I-6 L
Ec!*s? S.a0 NUM I f1 tab t U lit.1 li th StKVlbt LUMt' AN T M!'f!EI
. SU8J E CT CY 4
M P3T 2Eres.;r 1)ata BY
- h. "I" t b kV l DATE CHKO. 8Y DATE CALC.NO. $381IC o n 3. fi R E Y.
O I
7
$ MEET NO.
or TABLE l
P.
gu,,,,,pL,,
ge e,y,. Ftu SocT % Paess.
Discs. Pges.
'u Qd'%pm)
Qv?)(Gm)
P,(Ps 0
??'( Aic)
(9 T) r 32a0 8 I
39.0 3 6.G IHs6 1436. 2
.3 :.
. '!..a dabb s 204.f 2'
4k,o 36.7 I S. 0 14 e3. 6
--*9V*'
sic 4. z l
3 747 3 4, t I 4. 5 1379.1 3 '- 2
- 4 sj,h,
j 3c 9 7, 7 l
4 797 34 1 14.6
/3 r6, '/
? 7. 2 - J.0 s/,45
\\
sc 99, s
~
6 797 34.2 14.5
/ 357. /
n ;;,;- go s/4 3/
6
~747 3 al.1
- 14. 5 1376 3 3::o?,j
- ., m g,js e77z7 7
I423 33.2 13.?
/213 8 J-7 7;. ;,o.,-/,45 265S.5 6
1900 30.6 13, G, II1o. o 4s-l.hs 2 G S~h 5 9
I 9 Co 3c.7 13, 7 III6.&
- TTL. : e.e.sf.j,,
25s'V.o lo 19 00 30 6 IJ.3
///9.5 J 750 76 S/./n C244 3 ll l9 80 3 c. I 13 0 982.6
- ^i.& & '*l' N 2244 8 11 I980 29 4 13.0 163 8 22 y *l.5 /r d.ln, l
224/.O 13 g980
% 4. 0 12 9 981,4
- . 'll. 7 #O ("l.las e o m.., c.~14.o r w a.
e.~m (1) Data Face WP 963G C.em*vrea 84rsh O p.N Ge Af Tw at Po euT.
l I-7
e satse, m b Y 'M ' M937 kgmy byg p,7, h ol Y fif/4
$U BJ E CT gy DATE CHKO.SY DATE CALC.NO. 3 3018 t"> 0l3 di R E V-0 SHEET NO.
[
op 7
Ea v a rio n :
/
t I W (P>- P ) +
2.578 xi o '(Q - 43 (1 _ 1(T
~
=
3 t
( J,"
d, WHEnf :
TDM:
TcTAL DYMAM8C NEAD
[Fr.)
P, -
P -,
sv<.viou.n c.r p a. e.ssv< r.
(esis)
P, =
- Pym, Discu.a c cure.T Pnesso.c (esica n
1s DEalsiTY oS Bomes \\M*Ts 4 (Is2d il/FY)
$v et oa F Le w S a rs (G P m) d Q, -
Rsci e evar> c4 Ft.w an (Gpm)
J, :
Pum p ouTteT PtPE I.d. (5.ni *in.)
d=
Pu me inter piee i.J.
(7. 9s i in.)
l i
l I-8
NORTHEAST UTILITIES SERVICE COMPANY
. go.ur w 4,/,ds t CY
'A' M 9TI kg er bu h.T.
Pik o i oiTE BY
$U sJE CT CHKD.8Y DATE O
CALC.NO.UOll470th Rf g g y,
$HEET NO.
2 0P,_ 7
$A MPLG CncvuTion !
FoA DArm bo a N T 13 i f
/
I4 4 (1 s 1 9 - 12.1) +
a.57 8 rso(13 se. 23. f.
l I __
Tb4 =
b3 4 f.WI)4 (7.9 gi)1
/
23.35
+
- 4. H 6 77 i
TDN:
l a t.1 I. 5' Fgn l
l I
1 l
E-9
O b
4 a
APPENDIX II-1 ERROR ANALYSIS i
~
v.
D e-
-e-----
s.
ERROR ANALYSIS Root Mean Square (RMS) Method The RMS method was performed for the test data to measure the deviation between data points.
This deviation was referenced to the head versus flow curve for each pump.
Error analyses are listed in Tables II-1 through II-4.
The following equation (Reference 10) was used to calculate the plus/minus error for each data point:
RMS = + J12 + 22% = + /Ik RMS = + 2.236%
Example:
Test Data:
286.8 gpm
\\.c.
+ Error = +RMS (286.8) + 286.8 =(.02236)(286.8) + (286.8)
+ Error = 293.2 gpm
- Error = -RMS (268.8) + 286.8 = (.02236)(286.8) + 286.8
- Error = 280.4 gpm e
II-1
TABLE II-1 "A" HSPI PUMP DATA DISCHARGE FLOW (GPM)
TOH (FT)
- ERROR TEST DATA
.+ ERROR
- ERROR TEST DATA
+ ERROR 0
3148.7 3220.7 3292.7 0
3165.3 3237.7 3310.1 0
3126.6 3198.1 3269.6 0
3140.8 3212.6 3284.4 280.4 286.8 293.2 2904.0 2970.4 3036.8 402.9 412.1 421.3 2913.6 2980.2 3046.8 515.5 527.3 539.1 2909.0 2975.5 3042.0 574.8 587.9 601.0 2910.3 2976.9 3043.5 667.8 683.1 698.4 _
2919.7 2986.5 3053.3 4
681.2 696.8 712.4 2916.1 2982.8 3049.5 695.4 711.3 727.3 2917.6
~2984.3 3051.0 702.0 718.1 73,4.2 2919.5 2986.3 3053.1 699.8 715.8 731.8 2917.7 2984.4 3051.1 702.2 718.3 734.4 2918.8 2985.6 3052.3 1150.2 1176.5 1202.8 2669.8 2730.9 2792.0 1195.1 1222.4 1249.7 2066.9 2727.9 2790.0 1213.3 1241.0 1268.7 2667.9 2729.0 2788.5 1223.0 1251.0 1279.0 2666.5 2727.5 2788.5 1251.0 1279.7 1308.3 2666.3 2727.3 2788.3 i
1265.3 1294.2 1323.1 2668.4 2729.4 2790.4 1276.6 1305.8 1335.0 2667.3 2778.3 2790.3 1272.3
.1301.4 1330.5 2666.7 2727.7 2788.7 1276.5 1305.7 1334.9 2665.8 2726.8 2787.8
{
1395.6 1427.5 1459.4 2476.0 2532.6 2598.2 NOTE:
Consult Reliability Engineering prior to use for subsequent DBA analysis.
1 II-2
o TABLE II-1 (Cont'd)
?
DISCHARGE FLOW (GPM)
TOH (FT)
- ERROR TEST DATA
+ ERROR
- ERROR TEST DATA
+ ERROR 1428.4 1461.1 1493.8 2476.5 2533.1 2569.7 1459.3 1492.7 1526.1 1476.5 2533.1 2589.7 1478.4 1512.2 1546.0 2478.0 2534.6 2591.3 1484.4 1518.4 1552.4 2480.4 2537.1 2593.8 1487.7 1521.7 1555.7 2476.1 2532.7 2589.3 1487.8 1521.8 1555.8 2476.5 2533.1 2589.7 1487.8 1521.7 1555.8 2479.7 2536.4 2593.1 1578.2 1614.3 1650.4 2232.2 2283.4 2334.5 1669.6 1707.8 1745.0 2231.4 2282.4 2333.4 1690.4 1729.1 1767.8 2231.5 2282.5 2333.5 1702.4 1741.3 1780.2 2231.6 2282.6 2333.6 1723.0 1762.4 1801.8 2234.0 2285.0 2336.0
(,
1740.6 1780.4 1820.0
, 2233.0 2284.1 2335.2 1740.6 1780.4 1820.2 2234.9 2286.0 2337.1 1740.6 1780.4 1820.2 2234.4 2285.5 2336.6 1751.1 1791.2 1831.3 2205.2 2255.6 2306.0 1751.1 1791.2 1831.3 2206.0 2256.5 2307.0 l
NOTE:
Consult Reliability Engineering prior to use for subsequent DBA analysis, i
s l
II-3
4 TABLE II-2 "B" HPSI PUMP DATA DISCHARGE FLOW (GPM)
TDH (FT)
- ERROR TEST DATA
+ ERROR
- ERROR TEST DATA
+ ERROR 0
3304.1 3379.7 3455.3 f
709.5 725.7 741.9 3083.4 3153.9 3224.4 724.1 740.7 757.3 3077.3 3147.7 3218.1 738.1 755.0 771.9 3074.4 3144.7 3215.0 1241.8 1270.2 1298.6 2823.6 2888.2 2952.8 1251.6 1280.2 1308.8 2817.8 2882.3 2946.8 1272.9 1302.0 1331.1 2817.5 2881.9 2946.3 1294.0 1323.6 1353.2 2600.5 2660.0 2719.5 1359.4 1390.5 1421.6 2599.1 2658.5 2717.9 1431.6
_1464.3 1497.0 2602.8 2662.3 2721.8 1707.5 1746.6 1785 2363.2 2417.3 2471.4 1722.9 1762.3 1E01.7 2361.1 2415.1 2469.1 1726.3 1765.8 1805.3 2362.6 2416.6 2470.6 NOTE:
Consult Reliability Engineering prior to use for subsequent 08A analysis.
I N
II-4 l
TABLE II-4 "B"
LPSI PUMP DATA DISCHARGE FLOW (GPM)
TDH (FT)
- ERROR TEST DATA
+ ERROR
- ERROR TEST DATA
+ ERROR 0
720.6 737.1 753.6 0
720.2 736.7 753.2 0
717.4 733.8 750.2 5451.5 5576.2 5700.8 671.9 687.3 702.7 5285.2 5406.1 5527.0 691.1 706.9 722.7 4530.7 4634.3 4737.9 660.8 675.9 691.0 l
4323.8 4422.7 4521.6 659.6 674.7 689.8 4402.4 4503.1 4603.8 604.6 618.4 632.2 4523.4 4626.9 4730.4 603.9 617.7 631.5 6481.1 6629.3 6777.5 581.1 594.4 607.7
'4 5646.3 6696.0 6845.7 582.6 595.9 609.2 6532.3 6681.7 6831.1 582.0 595.3 608.6 6524.7 6673.9 6823.1 589.1 602.6 616.1 6503.4 6652.1 6800.8 584.4 597.8 611.2 NOTE:
Consult Reliability Engineering prior to use for subsequent DBA analysis.
I II-6
)
i i
TABLE II-3 "A"
LPSI PUMP OATA DISCHARGE FLOW (GPM)
TDH (FT)
- ERROR TEST DATA
+ ERROR
- ERROR TEST DATA
+ ERROR 0
699.6 715.6 731.6 0
699.6 715.6 731.6 2901.6 2968.0 3034.4 670.0 685.3 700.6 3008.2 3077.0 3145.8 672.1 685.5 702.9 4666.4 4773.1 4879.8 630.7 645.1 659.5 4688.2 4795.4 4902.6 630.2 644.6 659.0 5480.5 5605.9 5731.3 591.7 605.2 618.7 5616.4 5744.9 5873.4 591.3 604.8 618.3 5299.7 5420.9 5542.1 560.2 573.0 585.8 6222.1 6364.4 6506.7 561.1 573.9 586.7 NOTE:
Consult Reliability Engineering prior to use for subsequent 08A analysis.
4 II-5
i c
e TABLE II-4 l
l "B"
LPSI PUMP DATA l
OISCHARGE FLOW (GPM)
TOH (FT)
- ERROR TEST DATA
+ ERROR
- ERROR TEST DATA
+ ERROR 0
720.6 737.1 753.6 0
7'20.2 736.7 753.2 0
717.4 733.8 750.2 5451.5 5576.2 5700.8 671.9 687.3 702.7 5285.2 5406.1 5527.0 691.1 706.9 722.7 4530.7 4634.3 4737.9 660.8 675.9 691.0 4323.8 4422.7 4521.6 659.6 674.7 689.8 4402.4 4503.1 4603.8 604.6 618.4 632.2 4523.4 4626.9 4730.4 603.9 617.7 631.5 6481.1 6629.3 6777.5 581.1 594.4 607.7 5646.3 6696.0 6845.7 582.6 595.9 609.2 6532.3 6681.7 6831.1 582.0 595.3 608.6 6524.7 6673.9 6823.1 589.1 602.6 616.1 6503.4 6652.1 6800.8 584.4 597.8 611.2 NOTE:
Consult Reliability Engineering prior to use for subsequent DBA analysis.
I l