ML20248E452

From kanterella
Jump to navigation Jump to search
Forwards Proposed Tech Spec Pages Omitted from 890728 Application for Amend to License DPR-61 Re Cycle 16 Reload
ML20248E452
Person / Time
Site: Haddam Neck File:Connecticut Yankee Atomic Power Co icon.png
Issue date: 09/29/1989
From: Mroczka E
CONNECTICUT YANKEE ATOMIC POWER CO., NORTHEAST UTILITIES
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20248E455 List:
References
B13380, NUDOCS 8910050239
Download: ML20248E452 (2)


Text

t. ,

,(

g, UTILITIES o.n , i Omc.. . s ioon sir.1. B.,iin. Conn.ciicui l r is.I es c cI"" [ P.O. BOX 270

,In$^u nEN$., HARTFORD, CONNECTICUT 06141-0270 k ' J wa ar mmm em co,., (203) 665-5000 l

September 29, 1989 Docket No. 50-213 B13380 Re: 10CFR50.90 U.S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, DC 20555 ,

1 Gentlemen:

Haddam Neck Plant Cycle 16 Reload Proposed Chanaes to Technical Specifications In a letter to the Staff dated July 28, 1989,(I) Connecticut Yankee Atomic Power Company (CYAPC0) proposed to amend Operating License DPR-61 by incorpo-rating the Cycle 16 reload changes into the Technical Specifications for the Haddam Neck Plant. These proposed changes were provided in Standard Technical Specification (STS) format to support the conversion of the Haddam Neck Plant Technical Specifications.to STS format.

Unfortunately, due to an inadvertent administrative error, several pages of the proposed changes were not included in the original submittal to the Staff.

In Attachment 1 to this letter, we have included the pages that were omitted from the original submittal. We regret any inconvenience this apparent oversigh.t may have caused the Staff in the review of the Cycle 16 reload for the Haddam Neck Plant.

(1) E. J. Mroczka letter to the U.S. Nuclear Regulatory Commission, Haddam Neck Pl ant, Proposed Revision to Technical Specifications, Cycle 16 Reload," dated July 28, 1989.

8910050239 890929 FDR ADOCK 05000213 ,1 F PDC g\)

os3422 ncv. 4-es (

q e.

9.

I U.S. Nuclear Regulatory Commission B13380/Page 2 i September.29, 1989 In accordance with 10CFR50.91(b), CYAPC0 is providing the State of Connecticut ,

with a copy of this submittal. j Very truly yours, CONNECTICUT YANKEE ATOMIC POWER COMPANY E. J M fr czka (/

Senior vice President cc: W. T. Russell, Region I Administrator A. B. Wang, NRC Project Manager, Haddam Neck Plant J. T. Shedlosky, Senior Resident Inspector, Haddam Neck Plant Mr. Kevin McCarthy, Director Radiation Control Unit Department of Environmental Protection Hartford, CT 06116

_ _ - _ _ _ _ - _ _ _ _ _ - -