05000440/LER-1988-027, Forwards LERs 88-026 & 88-028.LER 88-027 Will Be Forthcoming

From kanterella
Jump to navigation Jump to search
Forwards LERs88-026 & 88-028.LER 88-027 Will Be Forthcoming
ML20151M543
Person / Time
Site: Perry FirstEnergy icon.png
Issue date: 07/22/1988
From: Kaplan A
CLEVELAND ELECTRIC ILLUMINATING CO.
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
Shared Package
ML20151M546 List:
References
PY-CEI-NRR-0891, PY-CEI-NRR-891, NUDOCS 8808050228
Download: ML20151M543 (1)


LER-2088-027, Forwards LERs 88-026 & 88-028.LER 88-027 Will Be Forthcoming
Event date:
Report date:
4402088027R00 - NRC Website

text

.

  • < THE CLEVELAND ELECTRIC ILLUMIN ATING COMPANY PO DOX 97 m PERRY, OHIO 44081 m TELEPHONE (216) 259-3737 m A DDR E SS .10 CENTER ROAD Serving The Best Location in the Nation PERRY NUCLEAR POWER PLANT Al Kaplan VICE PFtESIDENT QCLEAR GROUP July 22, 1988 PY-CEI/NRR-0891 L U.S. Nuclear Regulatory Commission Document Control Desk Washington, .D.C. 20555 Perry Nuclear Power Plant Docket No. 50-440 LERs 88026, 88028

Dear Sir:

Enclosed are Licensee Event Reports 88026 and 88028 for the Perry Nuclear Power Plant. Licensee Event Report 88027 will be forthcoming.

Very truly yo s, Al Kaplan Vice President Nuclear Group AK:njc

Enclosure:

LERs 88026, 38028 cc: T. Colburn K. Connaughton U.S. Nuclear Regulatory Commission 799 Roosevelt Road Glen Ellyn, Illinois 60137 ff,N seososo228 eso722 PDR ADOCK 05000440