Forwards LER 97-022-00,documenting Conditions That Occurred at Millstone Nuclear Power Station,Unit 3 on 970218.Util Commitments Made within Ltr,Listed
ML20137E886
Person / Time
Site: Millstone Dominion icon.png
Issue date: 03/20/1997
From: Hicks G
NORTHEAST NUCLEAR ENERGY CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20137E889 List:
References
B16274, NUDOCS 9703280288
Download: ML20137E886 (5)


LER-2097-022, Forwards LER 97-022-00,documenting Conditions That Occurred at Millstone Nuclear Power Station,Unit 3 on 970218.Util Commitments Made within Ltr,Listed
Event date:
Report date:
4232097022R00 - NRC Website

text

-

Northeast ""P' ferry fid- (""" 156) **'er'"ra, cr 0o383 Nuclear Energy sunnon, Noa,a, p.,,,, stasoo Nonheast Nuclear Energy Company p.O.162128 i Waterford, Cr 06385-0128 (860) 447 1791 Fax (800) 444-4277 ne Northrant I!tilities Syncm March 20,1997 Docket No. 50-423  :

B16274 Re:10CFR 50.73(a)(2)(i) 1 U. S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 Millstone Nuclear Power Station Unit 3 Licensee Event Report 97-022-00 Submitted Pursuant to 10CFR 50.73(a)(2)(i)

This letter forwards Licensee Event Report 97-022-00, documenting a condition  ;

l that was determined at Millstone Unit No. 3 on February 18,1997. This LER is l submitted pursuant to 10CFR 50.73(a)(2)(i). NNECO's commitments in )

response to this event are contained within Attachment 1 to this letter.

Should you have any questions regarding this submittal, please contact Mr.

James M. Peschel at (860) 437-5840.

1 Very truly yours, NORTHEAST NUCLEAR ENERGY COMPANY

, 1 f$ q

~

5. DTHick's n

" b b b 4 Unit Director, Millstone Unit No. 3 D A K O Oo 5.44@,N.5,4

i U.S. Nuclear Regulatory Commission  !

l B16274/Page 2

Attachment:

1) NNECO's commitments in response to LER 97-022-00 l
2) LER 97-022-00 l

[

cc: H. J. Miller, Region i Administrator A. C. Cerne, Senior Resident inspector, Millstone Unit No. 3 J. W. Andersen, NRC Project Manager, Millstone Unit No. 3 W. D. Travers, Dr., Director, Special Projects l

I i

i t

i l

t i

f l t f

1 i  ;

1 I

l

J

. l

! Docket No. 50-423 i i

l B16274 l i

i l

i l

i Attachment 1 Millstone Nuclear Power Station, Unit No. 3

! NNECO's Commitments In Response To ,

(LER 97-022-00) l l

l i

l l

I i

l

)

l i March 20,1997 1 l

i i

i l

j l .

Enclosure .

List of Regulatory Commitments The following tc'. ale identifies those actions committed to by NNECO in this i

document. Ar:y other actions discussed in the submittal represent intended or ,

planned actions by NNECO. They are described to the NRC for'the NRC's -

information and are not regulatory commitments. Please notify the Manager - .;

Nuclear Licensirig at the Millstone Nuclear Power Station Unit No. 3 of any questions regarding this document or any associated regulatory commitments.

Number Commitment Due l B16274-01 Preventative Maintenance work orders for the April 15,1997 Control Room Emergency Air Filtration System

will be revised to incorporate the requirement l to perform the Technical Specifications Conditional Surveillance after partial or complete HEPA filter replacement.

B16274-02 The Maintenance procedure for the Control August 1,1997  ;

Room Emergency Air Filtration system will be revised to incorporate the requirement for performance of Technical Specification i l

Surveillance Requirement 4.7.7(f) following i specified maintenance.

l

)

)

l l

4 l

l

l

l 1 .

l-  :

1 i

i

-Docket No. 50-423

! B16274  :

1  ;

l r

i P

i

?

I i

l i

t l

l Attachment 2  !

Millstone Nuclear Power Station, Unit No. 3  :

NNECO's Submittal of  !

(97-022-00)  !

1 March 20,1997 )

i l

y --- ,p.mm,-, ,,- ---- - ,--., m -