05000293/LER-1982-004, Telecopy Message of LER 82-004/01X-0:on 820222,primary Containment Isolation Valve Flanges Discovered W/Provision for Type B Llr Testing.Flanges Previously Type a Tested. Flanges Added to Llr Test Program

From kanterella
(Redirected from 05000293/LER-1982-004)
Jump to navigation Jump to search
Telecopy Message of LER 82-004/01X-0:on 820222,primary Containment Isolation Valve Flanges Discovered W/Provision for Type B Llr Testing.Flanges Previously Type a Tested. Flanges Added to Llr Test Program
ML20071H710
Person / Time
Site: Pilgrim
Issue date: 02/24/1982
From: Whitney G
BOSTON EDISON CO.
To: Jerrica Johnson
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
References
LER-82-004-01X, LER-82-4-1X, NUDOCS 8203080505
Download: ML20071H710 (1)


LER-2082-004, Telecopy Message of LER 82-004/01X-0:on 820222,primary Containment Isolation Valve Flanges Discovered W/Provision for Type B Llr Testing.Flanges Previously Type a Tested. Flanges Added to Llr Test Program
Event date:
Report date:
2932082004R00 - NRC Website

text

__

DESIGNATED ORIGINAIJ BOSTON EDISON C0 g g ggg ~

M7,; g

~

PROMPT REPORTABLE OCCURRENCE TELECOPY :ESSAGE TO: (215) 337-5324 DATE/ TIME: 2 /24 /82 /11:45AM Telephone Number TO: 4 Director,1 Region;I$ FROM: Pilgrim Nuclear Power Sta.

Office of Inspection and Enforcement RFD#1, Rocky Hill Road U.'S. Nuclear Regulatory Commission Plymouth, MA 02360 631 Park Avenue King of Prussia, PA 19406 Docket Number 50-293 License DPR-35 Assigned LER Number 82-004/01X-0 Reported per T.S .Sectiod.'9.B.1.F.

Event

Description:

On 2/22/82, it was discovered some primary containment is'olation valve flanges hav'e provision for type "B" LLR Testing. These flanges have previ-ously been type "A" tested as part of the PCILRT Testing, and had been considered not capable of "B" LLR Testing.

Cause and Corrective Action: These flanges had not been identified as being type "B" testable in the initial PCILRT Report as a basis, therefore have not been included in the LLR Test program and procedures. These flanges were immediately added to the LLRT program and procedure. Flanges determined to require type "B" testing will be done prior to the scheduled PCILRT.

Facility Status: 0 % Ther=al MW c) Routine Startup g) Shutdown d) Routine Shutdown h) Refueling X e) . Steady' State 1) Other f) Load ' Changing j) Not Applicable A written followup report will be sent within two weeks.

NRC Person Notified J. R. Johnson Prepared by c

4 8203080505 820224 . S 6/VED PDR ADOCK 05000293 q 2 ig S PDR q

Afg Cari 0 $ jg02 L ~

Mail (2) copies to: *

  • N g ky 2**::ar 2-Director <l f

Office of Management Information and Program Control g U. S. Nuclear Regulatory Coc=ission Washington, D.C. 20555 I cc: Standard LER Distribution s gG, S