Similar Documents at Zion |
---|
Category:INSPECTION REPORT
MONTHYEARIR 05000295/19990031999-09-0101 September 1999 Insp Repts 50-295/99-03 & 50-304/99-03 on 990608-0812.No Violations Noted.Major Areas Inspected:Licensee Facility & Control,Decommissioning Support Activities,Sf Safety & Radiological Safety IR 05000295/19990021999-06-18018 June 1999 Insp Repts 50-295/99-02 & 50-304/99-02 on 990121-0608.No Violations Noted.Major Areas Inspected:Licensee Facility Management & Control,Decommissioning Support Activities,Sf Safety & Radiological Safety IR 05000295/19980101998-11-0303 November 1998 Insp Repts 50-295/98-10 & 50-304/98-10 on 980814-1008.No Violations Noted.Major Areas Inspected:Facility Mgt & Control,Decommissioning Support Activities,Sf Safety & Radiological Safety IR 05000295/19980091998-09-0808 September 1998 Insp Repts 50-295/98-09 & 50-304/98-09 on 980626-0813.No Violations Noted.Major Areas Inspected:Facility Mgt & Control,Decommissioning Support Activities,Sf Safety & Radiological Safety IR 05000295/19980071998-06-26026 June 1998 Insp Repts 50-295/98-07 & 50-304/98-07 on 980425-0609.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000295/19980061998-04-23023 April 1998 Insp Repts 50-295/98-06 & 50-304/98-06 on 980330-0403.No Violations Noted.Major Areas Inspected:Plant Support IR 05000295/19980041998-03-31031 March 1998 Insp Repts 50-295/98-04 & 50-304/98-04 on 980203-0313.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000295/19980021998-03-0606 March 1998 Insp Repts 50-295/98-02 & 50-304/98-02 on 980112-0219.No Violations Noted.Major Areas Inspected:Plant Support ML20203H8841998-02-25025 February 1998 Insp Repts 50-295/97-32 & 50-304/97-32 on 971217-980202. Violations Noted.Major Areas Inspected:Operations, Engineering & Plant Support ML20202D7441998-02-0606 February 1998 Insp Repts 50-295/98-03 & 50-304/98-03 on 980120-23. Violations Noted.Major Areas Inspected:Plant Support Performance & Specifically,Evaluation of Effectiveness of Radiation Protection Program IR 05000295/19970271998-01-30030 January 1998 Insp Repts 50-295/97-27 & 50-304/97-27 on 971117-25.No Violations Noted.Major Areas Inspected:Licensed Reactor Operator & Senior Reactor Operator Requalification Training Programs ML20199G3461998-01-27027 January 1998 Insp Repts 50-295/97-23 & 50-304/97-23 on 970908-1216. Violations Noted.Major Areas Inspected:Engineering ML20199A2461998-01-21021 January 1998 Insp Repts 50-295/97-25 & 50-304/97-25 on 971011-1216. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000295/19970291998-01-0909 January 1998 Insp Repts 50-295/97-29 & 50-304/97-29 on 971202-05.No Violations Noted.Major Areas Inspected:Licensee Performance During Plant Biennial Exercise of Emergency Plan IR 05000295/19970211997-12-0909 December 1997 Insp Repts 50-295/97-21 & 50-304/97-21 on 970602-0919.No Violations Noted.Major Areas Inspected:Licensee Developed Phoenix Training Program as Part of Station Restart Action Plan IR 05000295/19970261997-12-0505 December 1997 Insp Repts 50-295/97-26 & 50-304/97-26 on 971027-31. Violations Noted.Major Areas Inspected:Plant Support, Performance & Evaluated Effectiveness of Radiation Protection Program IR 05000295/19970311997-12-0404 December 1997 Predecisional Enforcement Conference Repts 50-295/97-31 & 50-304/97-31 on 971201.Violations Noted.Major Areas Discussed:Violations Involving Failures to Adequately Implement fitness-for-duty Program Requirements ML20202D9401997-11-28028 November 1997 Insp Repts 50-295/97-22 & 50-304/97-22 on 970830-1010. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000295/19970171997-10-10010 October 1997 Insp Repts 50-295/97-17 & 50-304/97-17 on 970619-0922.No Violations Noted But pre-decisional Enforcement Conference Will Be Scheduled to Discuss Violations Cited.Major Areas inspected:fitness-for-duty Related Events IR 05000295/19970181997-10-0202 October 1997 Insp Repts 50-295/97-18 & 50-304/97-18 on 970409-0730. Violations Noted.Major Areas Inspected:Engineering IR 05000295/19970191997-09-30030 September 1997 Insp Repts 50-295/97-19 & 50-304/97-19 on 970719-0829. Violations Noted.Major Areas Inspected:Operations,Maint & Engineering IR 05000295/19970161997-08-28028 August 1997 Insp Repts 50-295/97-16 & 50-304/97-16 on 970530-0718. Violations Noted.Major Areas Inspected:Operations, Maintenance & Engineering IR 05000295/19970201997-08-26026 August 1997 Insp Repts 50-295/97-20 & 50-304/97-20 on 970728-0801. Violations Noted.Major Areas Inspected:Aspects of Licensee Plant Support Performance & Specifically,An Evaluation of Effectiveness of RP Program IR 05000295/19970131997-08-15015 August 1997 Insp Repts 50-295/97-13 & 50-304/97-13 on 970404-0529. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support Re Failure to Immediately Notify CR of Fire in Unit 1 Containment Resulting in Violation ML20149G6381997-07-17017 July 1997 Insp Rept 50-295/97-12 on 970311-0425.Violations Noted.Major Areas Inspected:Operations,Maint & Engineering Associated W/Unit 1 Loss of Offsite Power Event That Occurred on 970311 ML20149H9961997-07-16016 July 1997 Predecisional Enforcement Conference Rept on 970703.Areas Discussed:Violations Noted in Insp Repts 50-295/97-02, 50-304/97-02,50-295/97-07 & 50-304/97-07 on 970206-0402 & 0312-0428 & Corrective Actions IR 05000295/19970151997-06-26026 June 1997 Insp Repts 50-295/97-15 & 50-304/97-15 on 970602-06.No Violations Noted.Major Areas Inspected:Licensee Plant Support Performance & Effectiveness of RP Program ML20140G8291997-06-0404 June 1997 Insp Repts 50-295/97-02 & 50-304/97-02 on 970206-0402. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000295/19970141997-05-30030 May 1997 Partially Withheld NRC Security Insp Repts 50-295/97-14 & 50-304/97-14 on 970428-0502 (Ref 10CFR73.21(c)(2). No Violations Noted.Major Areas Inspected:Physical Security Program IR 05000295/19970071997-05-21021 May 1997 Insp Repts 50-295/97-07 & 50-304/97-07 on 970312-0428. Violations Noted.Major Areas inspected:follow-up on 970225-0307,AIT Insp of Improper Control Rod Manipulation Event ML20148B7831997-05-0606 May 1997 Insp Repts 50-295/97-09 & 50-304/97-09 on 970324-0414. Violations Noted.Major Areas Inspected:Licensee Radiation Protection Program IR 05000295/19970081997-04-30030 April 1997 Insp Repts 50-295/97-08 & 50-304/97-08 on 970317-21. Violations Noted.Major Areas Inspected:Insp Included Review of EP Program,Aspect of Plant Support IR 05000295/19960021997-04-0101 April 1997 Insp Repts 50-295/96-02 & 50-304/96-02 on 961203-970122.No Violations Noted.Major Areas Discussed:Shipment of Radioactive Matls Exceeding Limits of 49CFR173.425 & Inadequately Training Personnel IAW Procedure ML20137J6871997-03-24024 March 1997 Insp Repts 50-295/96-20 & 50-304/96-20 on 961207-970205. Violations Noted.Major Areas Inspected:Operations,Maint & Engineering IR 05000295/19970041997-03-0606 March 1997 Partially Withheld Insp Repts 50-295/97-04 & 50-304/97-04 on 970203-07.No Violations Noted.Details Withheld (Ref 10CFR73.21) ML20134P4881997-02-11011 February 1997 Insp Repts 50-295/96-21 & 50-304/96-21 on 961203-970122. Apparent Violations Being Considered for Escalated Enforcement Action.Major Areas Inspected:Radiological Protection & Chemistry Controls IR 05000295/19960171997-02-0303 February 1997 Insp Repts 50-295/96-17 & 50-304/96-17 on 961012-1206. Violations Noted.Major Areas Inspected:Licensee Operations, Maint & Engineering ML20134G0481997-01-28028 January 1997 Insp Repts 50-295/96-14 & 50-304/96-14 on 960824-1011. Violations Noted.Major Areas Inspected:Operations, Maintenance & Engineering IR 05000295/19960131996-12-23023 December 1996 Insp Repts 50-295/96-13 & 50-304/96-13 on 961001-03,28-30 & 1107.Violations Noted.Major Areas Inspected:Maint. Observed & Reviewed ISI Procedures,Personnel Certifications IR 05000295/19960181996-12-0202 December 1996 Partially Withheld Insp Repts 50-295/96-18 & 50-304/96-18 on 961028-1101 (Ref 10CFR73.21).No Violations Noted.Major Areas Inspected:Corrective Actions,Mgt Support,Effectiveness of Mgt Controls & Security Program Plans ML20135B6851996-11-27027 November 1996 Predecisonal Enforcement Conference Repts 50-295/96-11 & 50-304/96-11 on 961112.No Violations Noted.Areas Discussed: Apparent Violations Identified During 960722-0822 Insp Along W/Corrective Actions Taken or Planned by Licensee IR 05000295/19960161996-11-21021 November 1996 Insp Repts 50-295/96-16 & 50-304/96-16 on 960923-1024. Violations Noted.Major Areas Insp:Radiation Protection Program ML20129E3401996-10-22022 October 1996 Insp Repts 50-295/96-11 & 50-304/96-11 on 960722-0822. Violations Noted.Major Areas Inspected:Team Insp of Engineering & Technical Support ML20129F1121996-10-22022 October 1996 Insp Repts 50-295/96-10 & 50-304/96-10 on 960713-0829. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering,Plant Support & Security ML20129F0761996-09-16016 September 1996 Insp Repts 50-295/96-08 & 50-304/96-08 on 960608-0726. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000295/19930241994-01-27027 January 1994 Insp Repts 50-295/93-24 & 50-304/93-24 on 940110-14.No Violations Noted.Major Areas Inspected:Rp Program,Review of Organizational Changes,Audits & Appraisals & External Exposure Controls IR 05000295/19930231994-01-14014 January 1994 Insp Repts 50-295/93-23 & 50-304/93-23 on 931124-940106. Violations Noted.Major Areas Inspected:Outage Activities, Events,Operational Safety,Maintenance & Surveillance IR 05000295/19930181993-12-14014 December 1993 Insp Repts 50-295/93-18 & 50-304/93-18 on 931004-29.No Violations Noted.Major Areas Inspected:Engineering & Technical Support & Related Mgt Activities ML20058H2611993-12-0707 December 1993 Insp Repts 50-295/93-20 & 50-304/93-20 on 931112-1123. Violations Noted.Major Areas Inspected:Resident Insp of Licensee Action on Previous Insp Findings,Summary of Outage Activities & Operational Safety Verification IR 05000295/19930211993-12-0101 December 1993 Insp Repts 50-295/93-21 & 50-304/93-21 on 931115-19.No Violations Noted.Major Areas Inspected:Rp Program,Review of Surveys & Contamination Control 1999-09-01
[Table view] Category:NRC-GENERATED
MONTHYEARIR 05000295/19990031999-09-0101 September 1999 Insp Repts 50-295/99-03 & 50-304/99-03 on 990608-0812.No Violations Noted.Major Areas Inspected:Licensee Facility & Control,Decommissioning Support Activities,Sf Safety & Radiological Safety IR 05000295/19990021999-06-18018 June 1999 Insp Repts 50-295/99-02 & 50-304/99-02 on 990121-0608.No Violations Noted.Major Areas Inspected:Licensee Facility Management & Control,Decommissioning Support Activities,Sf Safety & Radiological Safety IR 05000295/19980101998-11-0303 November 1998 Insp Repts 50-295/98-10 & 50-304/98-10 on 980814-1008.No Violations Noted.Major Areas Inspected:Facility Mgt & Control,Decommissioning Support Activities,Sf Safety & Radiological Safety IR 05000295/19980091998-09-0808 September 1998 Insp Repts 50-295/98-09 & 50-304/98-09 on 980626-0813.No Violations Noted.Major Areas Inspected:Facility Mgt & Control,Decommissioning Support Activities,Sf Safety & Radiological Safety IR 05000295/19980071998-06-26026 June 1998 Insp Repts 50-295/98-07 & 50-304/98-07 on 980425-0609.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000295/19980061998-04-23023 April 1998 Insp Repts 50-295/98-06 & 50-304/98-06 on 980330-0403.No Violations Noted.Major Areas Inspected:Plant Support IR 05000295/19980041998-03-31031 March 1998 Insp Repts 50-295/98-04 & 50-304/98-04 on 980203-0313.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000295/19980021998-03-0606 March 1998 Insp Repts 50-295/98-02 & 50-304/98-02 on 980112-0219.No Violations Noted.Major Areas Inspected:Plant Support ML20203H8841998-02-25025 February 1998 Insp Repts 50-295/97-32 & 50-304/97-32 on 971217-980202. Violations Noted.Major Areas Inspected:Operations, Engineering & Plant Support ML20202D7441998-02-0606 February 1998 Insp Repts 50-295/98-03 & 50-304/98-03 on 980120-23. Violations Noted.Major Areas Inspected:Plant Support Performance & Specifically,Evaluation of Effectiveness of Radiation Protection Program IR 05000295/19970271998-01-30030 January 1998 Insp Repts 50-295/97-27 & 50-304/97-27 on 971117-25.No Violations Noted.Major Areas Inspected:Licensed Reactor Operator & Senior Reactor Operator Requalification Training Programs ML20199G3461998-01-27027 January 1998 Insp Repts 50-295/97-23 & 50-304/97-23 on 970908-1216. Violations Noted.Major Areas Inspected:Engineering ML20199A2461998-01-21021 January 1998 Insp Repts 50-295/97-25 & 50-304/97-25 on 971011-1216. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000295/19970291998-01-0909 January 1998 Insp Repts 50-295/97-29 & 50-304/97-29 on 971202-05.No Violations Noted.Major Areas Inspected:Licensee Performance During Plant Biennial Exercise of Emergency Plan IR 05000295/19970211997-12-0909 December 1997 Insp Repts 50-295/97-21 & 50-304/97-21 on 970602-0919.No Violations Noted.Major Areas Inspected:Licensee Developed Phoenix Training Program as Part of Station Restart Action Plan IR 05000295/19970261997-12-0505 December 1997 Insp Repts 50-295/97-26 & 50-304/97-26 on 971027-31. Violations Noted.Major Areas Inspected:Plant Support, Performance & Evaluated Effectiveness of Radiation Protection Program IR 05000295/19970311997-12-0404 December 1997 Predecisional Enforcement Conference Repts 50-295/97-31 & 50-304/97-31 on 971201.Violations Noted.Major Areas Discussed:Violations Involving Failures to Adequately Implement fitness-for-duty Program Requirements ML20202D9401997-11-28028 November 1997 Insp Repts 50-295/97-22 & 50-304/97-22 on 970830-1010. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000295/19970171997-10-10010 October 1997 Insp Repts 50-295/97-17 & 50-304/97-17 on 970619-0922.No Violations Noted But pre-decisional Enforcement Conference Will Be Scheduled to Discuss Violations Cited.Major Areas inspected:fitness-for-duty Related Events IR 05000295/19970181997-10-0202 October 1997 Insp Repts 50-295/97-18 & 50-304/97-18 on 970409-0730. Violations Noted.Major Areas Inspected:Engineering IR 05000295/19970191997-09-30030 September 1997 Insp Repts 50-295/97-19 & 50-304/97-19 on 970719-0829. Violations Noted.Major Areas Inspected:Operations,Maint & Engineering IR 05000295/19970161997-08-28028 August 1997 Insp Repts 50-295/97-16 & 50-304/97-16 on 970530-0718. Violations Noted.Major Areas Inspected:Operations, Maintenance & Engineering IR 05000295/19970201997-08-26026 August 1997 Insp Repts 50-295/97-20 & 50-304/97-20 on 970728-0801. Violations Noted.Major Areas Inspected:Aspects of Licensee Plant Support Performance & Specifically,An Evaluation of Effectiveness of RP Program IR 05000295/19970131997-08-15015 August 1997 Insp Repts 50-295/97-13 & 50-304/97-13 on 970404-0529. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support Re Failure to Immediately Notify CR of Fire in Unit 1 Containment Resulting in Violation ML20149G6381997-07-17017 July 1997 Insp Rept 50-295/97-12 on 970311-0425.Violations Noted.Major Areas Inspected:Operations,Maint & Engineering Associated W/Unit 1 Loss of Offsite Power Event That Occurred on 970311 ML20149H9961997-07-16016 July 1997 Predecisional Enforcement Conference Rept on 970703.Areas Discussed:Violations Noted in Insp Repts 50-295/97-02, 50-304/97-02,50-295/97-07 & 50-304/97-07 on 970206-0402 & 0312-0428 & Corrective Actions IR 05000295/19970151997-06-26026 June 1997 Insp Repts 50-295/97-15 & 50-304/97-15 on 970602-06.No Violations Noted.Major Areas Inspected:Licensee Plant Support Performance & Effectiveness of RP Program ML20140G8291997-06-0404 June 1997 Insp Repts 50-295/97-02 & 50-304/97-02 on 970206-0402. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000295/19970141997-05-30030 May 1997 Partially Withheld NRC Security Insp Repts 50-295/97-14 & 50-304/97-14 on 970428-0502 (Ref 10CFR73.21(c)(2). No Violations Noted.Major Areas Inspected:Physical Security Program IR 05000295/19970071997-05-21021 May 1997 Insp Repts 50-295/97-07 & 50-304/97-07 on 970312-0428. Violations Noted.Major Areas inspected:follow-up on 970225-0307,AIT Insp of Improper Control Rod Manipulation Event ML20148B7831997-05-0606 May 1997 Insp Repts 50-295/97-09 & 50-304/97-09 on 970324-0414. Violations Noted.Major Areas Inspected:Licensee Radiation Protection Program IR 05000295/19970081997-04-30030 April 1997 Insp Repts 50-295/97-08 & 50-304/97-08 on 970317-21. Violations Noted.Major Areas Inspected:Insp Included Review of EP Program,Aspect of Plant Support IR 05000295/19960021997-04-0101 April 1997 Insp Repts 50-295/96-02 & 50-304/96-02 on 961203-970122.No Violations Noted.Major Areas Discussed:Shipment of Radioactive Matls Exceeding Limits of 49CFR173.425 & Inadequately Training Personnel IAW Procedure ML20137J6871997-03-24024 March 1997 Insp Repts 50-295/96-20 & 50-304/96-20 on 961207-970205. Violations Noted.Major Areas Inspected:Operations,Maint & Engineering IR 05000295/19970041997-03-0606 March 1997 Partially Withheld Insp Repts 50-295/97-04 & 50-304/97-04 on 970203-07.No Violations Noted.Details Withheld (Ref 10CFR73.21) ML20134P4881997-02-11011 February 1997 Insp Repts 50-295/96-21 & 50-304/96-21 on 961203-970122. Apparent Violations Being Considered for Escalated Enforcement Action.Major Areas Inspected:Radiological Protection & Chemistry Controls IR 05000295/19960171997-02-0303 February 1997 Insp Repts 50-295/96-17 & 50-304/96-17 on 961012-1206. Violations Noted.Major Areas Inspected:Licensee Operations, Maint & Engineering ML20134G0481997-01-28028 January 1997 Insp Repts 50-295/96-14 & 50-304/96-14 on 960824-1011. Violations Noted.Major Areas Inspected:Operations, Maintenance & Engineering IR 05000295/19960131996-12-23023 December 1996 Insp Repts 50-295/96-13 & 50-304/96-13 on 961001-03,28-30 & 1107.Violations Noted.Major Areas Inspected:Maint. Observed & Reviewed ISI Procedures,Personnel Certifications IR 05000295/19960181996-12-0202 December 1996 Partially Withheld Insp Repts 50-295/96-18 & 50-304/96-18 on 961028-1101 (Ref 10CFR73.21).No Violations Noted.Major Areas Inspected:Corrective Actions,Mgt Support,Effectiveness of Mgt Controls & Security Program Plans ML20135B6851996-11-27027 November 1996 Predecisonal Enforcement Conference Repts 50-295/96-11 & 50-304/96-11 on 961112.No Violations Noted.Areas Discussed: Apparent Violations Identified During 960722-0822 Insp Along W/Corrective Actions Taken or Planned by Licensee IR 05000295/19960161996-11-21021 November 1996 Insp Repts 50-295/96-16 & 50-304/96-16 on 960923-1024. Violations Noted.Major Areas Insp:Radiation Protection Program ML20129E3401996-10-22022 October 1996 Insp Repts 50-295/96-11 & 50-304/96-11 on 960722-0822. Violations Noted.Major Areas Inspected:Team Insp of Engineering & Technical Support ML20129F1121996-10-22022 October 1996 Insp Repts 50-295/96-10 & 50-304/96-10 on 960713-0829. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering,Plant Support & Security ML20129F0761996-09-16016 September 1996 Insp Repts 50-295/96-08 & 50-304/96-08 on 960608-0726. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000295/19930241994-01-27027 January 1994 Insp Repts 50-295/93-24 & 50-304/93-24 on 940110-14.No Violations Noted.Major Areas Inspected:Rp Program,Review of Organizational Changes,Audits & Appraisals & External Exposure Controls IR 05000295/19930231994-01-14014 January 1994 Insp Repts 50-295/93-23 & 50-304/93-23 on 931124-940106. Violations Noted.Major Areas Inspected:Outage Activities, Events,Operational Safety,Maintenance & Surveillance IR 05000295/19930181993-12-14014 December 1993 Insp Repts 50-295/93-18 & 50-304/93-18 on 931004-29.No Violations Noted.Major Areas Inspected:Engineering & Technical Support & Related Mgt Activities ML20058H2611993-12-0707 December 1993 Insp Repts 50-295/93-20 & 50-304/93-20 on 931112-1123. Violations Noted.Major Areas Inspected:Resident Insp of Licensee Action on Previous Insp Findings,Summary of Outage Activities & Operational Safety Verification IR 05000295/19930211993-12-0101 December 1993 Insp Repts 50-295/93-21 & 50-304/93-21 on 931115-19.No Violations Noted.Major Areas Inspected:Rp Program,Review of Surveys & Contamination Control 1999-09-01
[Table view] Category:INSPECTION REPORT
MONTHYEARIR 05000295/19990031999-09-0101 September 1999 Insp Repts 50-295/99-03 & 50-304/99-03 on 990608-0812.No Violations Noted.Major Areas Inspected:Licensee Facility & Control,Decommissioning Support Activities,Sf Safety & Radiological Safety IR 05000295/19990021999-06-18018 June 1999 Insp Repts 50-295/99-02 & 50-304/99-02 on 990121-0608.No Violations Noted.Major Areas Inspected:Licensee Facility Management & Control,Decommissioning Support Activities,Sf Safety & Radiological Safety IR 05000295/19980101998-11-0303 November 1998 Insp Repts 50-295/98-10 & 50-304/98-10 on 980814-1008.No Violations Noted.Major Areas Inspected:Facility Mgt & Control,Decommissioning Support Activities,Sf Safety & Radiological Safety IR 05000295/19980091998-09-0808 September 1998 Insp Repts 50-295/98-09 & 50-304/98-09 on 980626-0813.No Violations Noted.Major Areas Inspected:Facility Mgt & Control,Decommissioning Support Activities,Sf Safety & Radiological Safety IR 05000295/19980071998-06-26026 June 1998 Insp Repts 50-295/98-07 & 50-304/98-07 on 980425-0609.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000295/19980061998-04-23023 April 1998 Insp Repts 50-295/98-06 & 50-304/98-06 on 980330-0403.No Violations Noted.Major Areas Inspected:Plant Support IR 05000295/19980041998-03-31031 March 1998 Insp Repts 50-295/98-04 & 50-304/98-04 on 980203-0313.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000295/19980021998-03-0606 March 1998 Insp Repts 50-295/98-02 & 50-304/98-02 on 980112-0219.No Violations Noted.Major Areas Inspected:Plant Support ML20203H8841998-02-25025 February 1998 Insp Repts 50-295/97-32 & 50-304/97-32 on 971217-980202. Violations Noted.Major Areas Inspected:Operations, Engineering & Plant Support ML20202D7441998-02-0606 February 1998 Insp Repts 50-295/98-03 & 50-304/98-03 on 980120-23. Violations Noted.Major Areas Inspected:Plant Support Performance & Specifically,Evaluation of Effectiveness of Radiation Protection Program IR 05000295/19970271998-01-30030 January 1998 Insp Repts 50-295/97-27 & 50-304/97-27 on 971117-25.No Violations Noted.Major Areas Inspected:Licensed Reactor Operator & Senior Reactor Operator Requalification Training Programs ML20199G3461998-01-27027 January 1998 Insp Repts 50-295/97-23 & 50-304/97-23 on 970908-1216. Violations Noted.Major Areas Inspected:Engineering ML20199A2461998-01-21021 January 1998 Insp Repts 50-295/97-25 & 50-304/97-25 on 971011-1216. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000295/19970291998-01-0909 January 1998 Insp Repts 50-295/97-29 & 50-304/97-29 on 971202-05.No Violations Noted.Major Areas Inspected:Licensee Performance During Plant Biennial Exercise of Emergency Plan IR 05000295/19970211997-12-0909 December 1997 Insp Repts 50-295/97-21 & 50-304/97-21 on 970602-0919.No Violations Noted.Major Areas Inspected:Licensee Developed Phoenix Training Program as Part of Station Restart Action Plan IR 05000295/19970261997-12-0505 December 1997 Insp Repts 50-295/97-26 & 50-304/97-26 on 971027-31. Violations Noted.Major Areas Inspected:Plant Support, Performance & Evaluated Effectiveness of Radiation Protection Program IR 05000295/19970311997-12-0404 December 1997 Predecisional Enforcement Conference Repts 50-295/97-31 & 50-304/97-31 on 971201.Violations Noted.Major Areas Discussed:Violations Involving Failures to Adequately Implement fitness-for-duty Program Requirements ML20202D9401997-11-28028 November 1997 Insp Repts 50-295/97-22 & 50-304/97-22 on 970830-1010. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000295/19970171997-10-10010 October 1997 Insp Repts 50-295/97-17 & 50-304/97-17 on 970619-0922.No Violations Noted But pre-decisional Enforcement Conference Will Be Scheduled to Discuss Violations Cited.Major Areas inspected:fitness-for-duty Related Events IR 05000295/19970181997-10-0202 October 1997 Insp Repts 50-295/97-18 & 50-304/97-18 on 970409-0730. Violations Noted.Major Areas Inspected:Engineering IR 05000295/19970191997-09-30030 September 1997 Insp Repts 50-295/97-19 & 50-304/97-19 on 970719-0829. Violations Noted.Major Areas Inspected:Operations,Maint & Engineering IR 05000295/19970161997-08-28028 August 1997 Insp Repts 50-295/97-16 & 50-304/97-16 on 970530-0718. Violations Noted.Major Areas Inspected:Operations, Maintenance & Engineering IR 05000295/19970201997-08-26026 August 1997 Insp Repts 50-295/97-20 & 50-304/97-20 on 970728-0801. Violations Noted.Major Areas Inspected:Aspects of Licensee Plant Support Performance & Specifically,An Evaluation of Effectiveness of RP Program IR 05000295/19970131997-08-15015 August 1997 Insp Repts 50-295/97-13 & 50-304/97-13 on 970404-0529. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support Re Failure to Immediately Notify CR of Fire in Unit 1 Containment Resulting in Violation ML20149G6381997-07-17017 July 1997 Insp Rept 50-295/97-12 on 970311-0425.Violations Noted.Major Areas Inspected:Operations,Maint & Engineering Associated W/Unit 1 Loss of Offsite Power Event That Occurred on 970311 ML20149H9961997-07-16016 July 1997 Predecisional Enforcement Conference Rept on 970703.Areas Discussed:Violations Noted in Insp Repts 50-295/97-02, 50-304/97-02,50-295/97-07 & 50-304/97-07 on 970206-0402 & 0312-0428 & Corrective Actions IR 05000295/19970151997-06-26026 June 1997 Insp Repts 50-295/97-15 & 50-304/97-15 on 970602-06.No Violations Noted.Major Areas Inspected:Licensee Plant Support Performance & Effectiveness of RP Program ML20140G8291997-06-0404 June 1997 Insp Repts 50-295/97-02 & 50-304/97-02 on 970206-0402. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000295/19970141997-05-30030 May 1997 Partially Withheld NRC Security Insp Repts 50-295/97-14 & 50-304/97-14 on 970428-0502 (Ref 10CFR73.21(c)(2). No Violations Noted.Major Areas Inspected:Physical Security Program IR 05000295/19970071997-05-21021 May 1997 Insp Repts 50-295/97-07 & 50-304/97-07 on 970312-0428. Violations Noted.Major Areas inspected:follow-up on 970225-0307,AIT Insp of Improper Control Rod Manipulation Event ML20148B7831997-05-0606 May 1997 Insp Repts 50-295/97-09 & 50-304/97-09 on 970324-0414. Violations Noted.Major Areas Inspected:Licensee Radiation Protection Program IR 05000295/19970081997-04-30030 April 1997 Insp Repts 50-295/97-08 & 50-304/97-08 on 970317-21. Violations Noted.Major Areas Inspected:Insp Included Review of EP Program,Aspect of Plant Support IR 05000295/19960021997-04-0101 April 1997 Insp Repts 50-295/96-02 & 50-304/96-02 on 961203-970122.No Violations Noted.Major Areas Discussed:Shipment of Radioactive Matls Exceeding Limits of 49CFR173.425 & Inadequately Training Personnel IAW Procedure ML20137J6871997-03-24024 March 1997 Insp Repts 50-295/96-20 & 50-304/96-20 on 961207-970205. Violations Noted.Major Areas Inspected:Operations,Maint & Engineering IR 05000295/19970041997-03-0606 March 1997 Partially Withheld Insp Repts 50-295/97-04 & 50-304/97-04 on 970203-07.No Violations Noted.Details Withheld (Ref 10CFR73.21) ML20134P4881997-02-11011 February 1997 Insp Repts 50-295/96-21 & 50-304/96-21 on 961203-970122. Apparent Violations Being Considered for Escalated Enforcement Action.Major Areas Inspected:Radiological Protection & Chemistry Controls IR 05000295/19960171997-02-0303 February 1997 Insp Repts 50-295/96-17 & 50-304/96-17 on 961012-1206. Violations Noted.Major Areas Inspected:Licensee Operations, Maint & Engineering ML20134G0481997-01-28028 January 1997 Insp Repts 50-295/96-14 & 50-304/96-14 on 960824-1011. Violations Noted.Major Areas Inspected:Operations, Maintenance & Engineering IR 05000295/19960131996-12-23023 December 1996 Insp Repts 50-295/96-13 & 50-304/96-13 on 961001-03,28-30 & 1107.Violations Noted.Major Areas Inspected:Maint. Observed & Reviewed ISI Procedures,Personnel Certifications IR 05000295/19960181996-12-0202 December 1996 Partially Withheld Insp Repts 50-295/96-18 & 50-304/96-18 on 961028-1101 (Ref 10CFR73.21).No Violations Noted.Major Areas Inspected:Corrective Actions,Mgt Support,Effectiveness of Mgt Controls & Security Program Plans ML20135B6851996-11-27027 November 1996 Predecisonal Enforcement Conference Repts 50-295/96-11 & 50-304/96-11 on 961112.No Violations Noted.Areas Discussed: Apparent Violations Identified During 960722-0822 Insp Along W/Corrective Actions Taken or Planned by Licensee IR 05000295/19960161996-11-21021 November 1996 Insp Repts 50-295/96-16 & 50-304/96-16 on 960923-1024. Violations Noted.Major Areas Insp:Radiation Protection Program ML20129E3401996-10-22022 October 1996 Insp Repts 50-295/96-11 & 50-304/96-11 on 960722-0822. Violations Noted.Major Areas Inspected:Team Insp of Engineering & Technical Support ML20129F1121996-10-22022 October 1996 Insp Repts 50-295/96-10 & 50-304/96-10 on 960713-0829. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering,Plant Support & Security ML20129F0761996-09-16016 September 1996 Insp Repts 50-295/96-08 & 50-304/96-08 on 960608-0726. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000295/19930241994-01-27027 January 1994 Insp Repts 50-295/93-24 & 50-304/93-24 on 940110-14.No Violations Noted.Major Areas Inspected:Rp Program,Review of Organizational Changes,Audits & Appraisals & External Exposure Controls IR 05000295/19930231994-01-14014 January 1994 Insp Repts 50-295/93-23 & 50-304/93-23 on 931124-940106. Violations Noted.Major Areas Inspected:Outage Activities, Events,Operational Safety,Maintenance & Surveillance IR 05000295/19930181993-12-14014 December 1993 Insp Repts 50-295/93-18 & 50-304/93-18 on 931004-29.No Violations Noted.Major Areas Inspected:Engineering & Technical Support & Related Mgt Activities ML20058H2611993-12-0707 December 1993 Insp Repts 50-295/93-20 & 50-304/93-20 on 931112-1123. Violations Noted.Major Areas Inspected:Resident Insp of Licensee Action on Previous Insp Findings,Summary of Outage Activities & Operational Safety Verification IR 05000295/19930211993-12-0101 December 1993 Insp Repts 50-295/93-21 & 50-304/93-21 on 931115-19.No Violations Noted.Major Areas Inspected:Rp Program,Review of Surveys & Contamination Control 1999-09-01
[Table view] Category:UTILITY
MONTHYEARIR 05000295/19900261990-11-16016 November 1990 Insp Repts 50-295/90-26 & 50-304/90-28 on 901022-26.No Violations or Deviations Noted.Major Areas Inspected: Training Concerns & Quality Verification Effectiveness IR 05000295/19900201990-11-0808 November 1990 Insp Repts 50-295/90-20 & 50-304/90-22 on 900910,24-28 & 1018.Violations Noted.Major Areas Inspected:Followup of Licensee Actions on Previously Identified Items IR 05000295/19900211990-11-0202 November 1990 Insp Repts 50-295/90-21 & 50-304/90-23 on 900902-1013.No Violations Noted.Major Areas Inspected:Previous Insp Findings,Summary of Operations,Operational Safety, Surveillance Observation,Maint Observation & LERs IR 05000295/19900221990-10-30030 October 1990 Insp Repts 50-295/90-22 & 50-304/90-24 on 900924-1012. Violations Noted.Major Areas Inspected:Radiation Protection Program IR 05000295/19900191990-10-22022 October 1990 Insp Repts 50-295/90-19 & 50-304/90-21 on 900813-1003.No Violations Noted.Major Areas Inspected:Physical Security Insp Involving Mgt Support,Security Program Plans,Audits, Protected & Vital Area Access Control IR 05000295/19900181990-09-24024 September 1990 Insp Repts 50-295/90-18 & 50-304/90-20 on 900730-0803.No Violations Noted.Major Areas Inspected:Operability of Svc Water Sys IR 05000295/19900151990-09-0505 September 1990 Insp Repts 50-295/90-15 & 50-304/90-17 on 900716-0808. Violations Noted.Major Areas Inspected:Liquid & Solid Radwaste Mgt & Transportation Programs,Including Organizational,Mgt Controls & Training IR 05000295/19900111990-09-0404 September 1990 Insp Repts 50-295/90-11 & 50-304/90-13 on 900424-0508 & 29. Violation Noted.Major Areas Inspected:Work Assignments of Licensee Employee Involved in Unmonitored Discharge of Radwaste IR 05000295/19900121990-08-0202 August 1990 Insp Repts 50-295/90-12 & 50-304/90-14 on 900717-19.No Violations,Deficiencies or Deviations Noted.One Exercise Weakness Identified.Major Areas Inspected:Annual Emergency Preparedness Exercise IR 05000295/19900161990-07-30030 July 1990 Insp Repts 50-295/90-16 & 50-304/90-18 on 900702-06,16 & 20. No Violations or Deviations Noted.Major Areas Inspected: Chemistry Program,Procedures,Organization & Training IR 05000304/19900121990-06-29029 June 1990 Insp Rept 50-304/90-12 on 900430-0510.Major Areas Inspected: Inservice Insp Related Activities,Steam Generator Indications,Mods,Erosion/Corrosion & Pipe Supports IR 05000295/19900071990-06-22022 June 1990 Insp Repts 50-295/90-07 & 50-304/90-07 on 900414-0602.No Violations Noted.Major Areas Inspected:Summary of Operations,Operational Safety Verification & ESF Sys Walkdown,Surveillance/Maint Observation & Technical Support IR 05000295/19890231989-09-14014 September 1989 Insp Repts 50-295/89-23 & 50-304/89-21 on 890717-21 & 0811. Violations Noted.Major Areas Inspected:Implementation of Licensee Fire Protection Program,Including Actions on Previous Insp Findings IR 05000295/19890251989-09-14014 September 1989 Insp Repts 50-295/89-25 & 50-304/89-23 on 890209-0807.No Violations Noted.Major Areas Inspected:Applicable Portions of Plant Security Program Re Alleged Inadequate Performance & Mgt Practices within Licensee Security Organization IR 05000295/19890241989-09-0808 September 1989 Insp Repts 50-295/89-24 & 50-304/89-22 on 890731-0829.No Violations Noted.Major Areas Inspected:Confirmatory Measurements & Radiological Environ Monitoring Including Review of Open Items Audits & Appraisals IR 05000295/19890181989-08-30030 August 1989 Insp Repts 50-295/89-18 & 50-304/89-17 on 890619-23 & 0717-21 & 24.Violations Noted.Major Areas Inspected:Maint, Support of Maint & Related Mgt Activities ML20246K9781989-08-25025 August 1989 Enforcement Conference Repts 50-295/89-26 & 50-304/89-24. Major Areas Discussed:Enforcement Options,Circumstances Surrounding & Corrective Actions in Response to Potential Violations of Security Plan IR 05000295/19890201989-07-28028 July 1989 Insp Repts 50-295/89-20 & 50-304/89-18 on 890619-0714.No Violations Noted.Major Areas Inspected:Liquid & Solid Radwaste Mgt & Transportation Programs,Including Organization & Mgt Controls & Compliance w/10CFR61 IR 05000295/19890151989-07-24024 July 1989 Safety Insp Repts 50-295/89-15 & 50-304/89-15 on 890509-0629.Violations Noted.Major Areas Inspected:Action on Previous Insp Findings,Summary of Operations & 890508 Unplanned Gas Release Due to Personnel Error IR 05000295/19890191989-06-16016 June 1989 Insp Rept 50-295/89-19 on 890331.No Violations Noted. Major Areas Discussed:Containment Spray Valve 1 MOV CS-0049 Being Inoperable & Rendering One Train of Containment Spray Sys Unable to Function in Recirculation Mode IR 05000295/19890161989-06-16016 June 1989 Insp Repts 50-295/89-16 & 50-304/89-16 on 890515-31.No Violations or Deviations Noted.Major Areas Inspected: Previously Identified Findings Re Environ Qualification of Electrical Equipment IR 05000295/19890121989-05-17017 May 1989 Insp Repts 50-295/89-12 & 50-304/89-12 on 890420 & 0502-05. No Violations,Deviations or Deficiencies Noted.Major Areas Inspected:Annual Emergency Preparedness Exercise IR 05000295/19890081989-04-10010 April 1989 Insp Repts 50-295/89-08 & 50-304/89-08 on 890210-0323. Violations Noted.Major Areas Inspected:Licensee Action on Previous Insp Findings,Summary Operations & 890219 Shutdown of Unit 2 to Repair Failed Control Rod IR 05000295/19890021989-03-0808 March 1989 Insp Repts 50-295/89-02 & 50-304/89-02 on 890104-0217. Violations Noted.Major Areas Inspected:Insp of Licensee Action on Previous Insp Findings,Summary of Operations & 890115 Unit 1 Shutdown for Steam Generator Tube Leakage IR 05000295/19890061989-03-0303 March 1989 Insp Repts 50-295/89-06 & 50-304/89-06 on 890214-17.Major Areas Inspected:Emergency Preparedness Program,Licensee Action on Previously Identified Items,Emergency Plan Activations & Operational Status of Program IR 05000295/19890071989-02-24024 February 1989 Enforcement Conference Repts 50-295/89-07 & 50-304/89-07 on 890216.Major Areas Discussed:Radioactive Matl Transport & Safeguards Events,Apparent Violations Associated W/Events & Licensee Perspective & Corrective Actions IR 05000295/19880251989-02-23023 February 1989 Insp Repts 50-295/88-25 & 50-304/88-25 on 881215-890104.No Violations Noted.Major Areas Inspected:Radiation Protection Program,Including Organization & Mgt Controls,Changes in Organization,Personnel,Facilities,Equipment & Procedures IR 05000295/19880041988-11-28028 November 1988 Addendum to Insp Repts 50-295/88-04 & 50-304/88-05, Consisting of Comparisons of Results of Liquid Spike Sent to Plant & Criteria for Comparing Analytical Measurements IR 05000295/19880191988-11-25025 November 1988 Insp Repts 50-295/88-19 & 50-304/88-19 on 880824-1110. Violations Noted.Major Areas Inspected:Licensee Action on Previous Insp Findings,Summary of Operations,Unit 2 Trip on 881008 & 12 & 881019 Unit 2 Valve Block Slippage IR 05000295/19880241988-11-22022 November 1988 Insp Repts 50-295/88-24 & 50-304/88-24 on 881024-28.No Violations Noted.Major Areas Inspected:Chemistry Program, Including Procedures,Organization & Training & Primary & Secondary Sys Water QC Programs IR 05000295/19880181988-10-20020 October 1988 Insp Repts 50-295/88-18 & 50-304/88-18 on 880927-29 & 1014. No Violations Noted.Major Areas Inspected:Annual Emergency Preparedness Exercise.Four Exercise Weaknesses Identified Which Will Require Corrective Action IR 05000295/19880201988-09-27027 September 1988 Insp Repts 50-295/88-20 & 50-304/88-20 on 880831-0902. Violations Noted.Major Areas Inspected:Liquid & Solid Radwaste Program,Including Organization & Mgt Controls, Effluent Releases & Records/Repts of Releases IR 05000295/19880161988-09-0909 September 1988 Insp Repts 50-295/88-16 & 50-304/88-16 on 880720-0823.No Violations Noted.Major Areas Inspected:Operational Safety Verification & Engineered Safety Feature Sys Walkdown, Surveillance Observation & Maint Observation IR 05000295/19880031988-08-12012 August 1988 Safety Sys Outage Mod Insp Rept 50-295/88-03 on 880329-0602. Violations Noted.Major Areas Inspected:Design,Installation & Testing of Several Mods to Be Performed During Outage & Util Corrective Action Program IR 05000295/19880151988-08-11011 August 1988 Insp Rept 50-295/88-15 on 880628-30 & 0803.Open Item Re Bench Testing of Crosby Valves Noted.Major Areas Inspected: LER 88-012 Re Test Methods of Main Steam Safety Valves Exceeding High Setpoint Tolerance When Tested by Steam IR 05000295/19880131988-08-0808 August 1988 Insp Repts 50-295/88-13 & 50-304/88-14 on 880526-0719.No Violations or Deviations Noted.Major Areas Inspected: Licensee Action on Previous Findings,Summary of Operations & Main Steam Safety Valves Set Nonconservatively IR 05000295/19880121988-06-22022 June 1988 Insp Repts 50-295/88-12 & 50-304/88-13 on 880414-0603. Violations Noted.Major Areas Inspected:Licensee Action on Previous Findings,Summary of Operations,Unit 1 Startup from Refueling & Testing of Accumulator Backup Check Valves IR 05000295/19880021988-06-0202 June 1988 Insp Repts 50-295/88-02 & 50-304/88-03 on 871124-880407.No Violations Noted.Major Areas Inspected:Review of Allegations Received by Region Iii,Including Drug Use by Personnel Employed at Plant & Harassment Re Safety Concerns IR 05000295/19880111988-05-26026 May 1988 Insp Repts 50-295/88-11 & 50-304/88-12 on 880418-29.No Violations or Deviations Noted.Major Areas Inspected: Radiation Protection Program During Refueling/Maint Outage, Including,Organization & Mgt Controls IR 05000295/19880101988-05-24024 May 1988 Insp Repts 50-295/88-10 & 50-304/88-11 on 880405-21. Violations Noted.Major Areas Inspected:Previous Insp Findings,Lers & Snubber Surveillance & Functional Testing IR 05000295/19880091988-04-27027 April 1988 Insp Repts 50-295/88-09 & 50-304/88-10 on 880225-0413. Violation Noted.Major Areas Inspected:Licensee Action on Previous Insp Findings,Summary of Operations & Erroneous Setting of Main Steam Safety Valve Lift Setpoints on 880329 ML20148R7111988-04-0707 April 1988 Insp Repts 50-295/87-34 & 50-304/87-35 on 871116-880314. Violations Noted.Major Areas Inspected:Assessment of Compliance w/10CFR50,App R & Review of Fire Protection Program Requirements IR 05000295/19880051988-03-25025 March 1988 Insp Repts 50-295/88-05 & 50-304/88-06 on 880115-0224.No Violations or Deviations Noted.Major Areas Inspected:Action on Previous Insp Findings,Summary of Operations,Operational Safety Verification,Lers & IE Bulletins IR 05000295/19880071988-03-15015 March 1988 Safety Insp Repts 50-295/88-07 & 50-304/88-08 on 880302-04. No Violations or Deviations Noted.Major Areas Inspected: Containment Leak Rate Test (Cilrt) Procedure & Performance Witnessing & Review of Cilrt Results IR 05000295/19880081988-03-0202 March 1988 Partially Withheld Insp Repts 50-295/88-08 & 50-304/88-09 on 880201-19.Violation Noted.Major Areas Inspected: Circumstances Surrounding Inadequate Search of Package Matl Observed on 880201 IR 05000295/19880061988-02-23023 February 1988 Insp Repts 50-295/88-06 & 50-304/88-07 on 880208-11.No Violations Noted.Major Areas Inspected:Emergency Preparedness Program,Including Licensee Action on Previously Identified Areas & Emergency Plan Activations ML20149F8991988-02-10010 February 1988 Insp Repts 50-295/88-04 & 50-304/88-05 on 880112-15 & 19.No Violations Noted.Major Areas Inspected:Qa & Confirmatory Measures for in-plant Radiochemical Analyses & Action on Open Items Previously Identified ML20150C3281988-02-0909 February 1988 Insp Repts 50-295/87-24 & 50-304/87-25 on 870914-18.One Open Item Noted.Major Areas Inspected:Check Valve Testing Program,Check Valve Location,Check Valve Maint & Failure History & Response to INPO Event Rept 86-3 IR 05000295/19870361988-01-27027 January 1988 Insp Repts 50-295/87-36 & 50-304/87-37 on 871120-880114. Violation Noted.Major Areas Inspected:Operational Safety Verification & ESF Sys Walkdown & Inspector Followup of IE Bulletin 87-002 IR 05000295/19870381988-01-0707 January 1988 Insp Repts 50-295/87-38 & 50-304/87-39 on 871207-17. Violation Noted.Major Areas Inspected:Licensee Actions Re IE Bulletin 84-02 & Licensee Implementation of Generic Ltr 83-28 in Areas Including Equipment Classification 1990-09-05
[Table view] Category:TEXT-INSPECTION & AUDIT & I&E CIRCULARS
MONTHYEARIR 05000295/19990031999-09-0101 September 1999 Insp Repts 50-295/99-03 & 50-304/99-03 on 990608-0812.No Violations Noted.Major Areas Inspected:Licensee Facility & Control,Decommissioning Support Activities,Sf Safety & Radiological Safety ML20210C3781999-07-20020 July 1999 Notice of Violation from Insp on 990318.Violations Noted: on 980224,individual Attempted to Enter Protected Area of Plant with Firearm.Search Equipment Operator Failed to Failed to Secure Item & Prevent Access ML20210C4301999-07-20020 July 1999 Notice of Violation from Investigation on 990318.Violation Noted:On 980224,recipient Caused Util to Be in Violation of Section 2.C.6 of Licenses DPR-39 & DPR-48.Recipient Attempted to Enter Protected Area of Station with Handgun IR 05000295/19990021999-06-18018 June 1999 Insp Repts 50-295/99-02 & 50-304/99-02 on 990121-0608.No Violations Noted.Major Areas Inspected:Licensee Facility Management & Control,Decommissioning Support Activities,Sf Safety & Radiological Safety ML20205P2211999-04-0909 April 1999 Notice of Violation from Insp & Investigation Completed on 981112.Violation Noted:From Approx July,1997 to 980122,SGI Was Not Stored in Locked Storage Container While Unattended IR 05000295/19980101998-11-0303 November 1998 Insp Repts 50-295/98-10 & 50-304/98-10 on 980814-1008.No Violations Noted.Major Areas Inspected:Facility Mgt & Control,Decommissioning Support Activities,Sf Safety & Radiological Safety IR 05000295/19980091998-09-0808 September 1998 Insp Repts 50-295/98-09 & 50-304/98-09 on 980626-0813.No Violations Noted.Major Areas Inspected:Facility Mgt & Control,Decommissioning Support Activities,Sf Safety & Radiological Safety IR 05000295/19980071998-06-26026 June 1998 Insp Repts 50-295/98-07 & 50-304/98-07 on 980425-0609.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support PNO-III-98-030, on 980517,armed Security Guard on Patrol in Owner Controlled Area Reported to Security Person Lying Near Road.Guard Subsequently Reported Being Shot.No Intruder Found.Guard Admitted Shooting Himself in Foot1998-05-18018 May 1998 PNO-III-98-030:on 980517,armed Security Guard on Patrol in Owner Controlled Area Reported to Security Person Lying Near Road.Guard Subsequently Reported Being Shot.No Intruder Found.Guard Admitted Shooting Himself in Foot IR 05000295/19980061998-04-23023 April 1998 Insp Repts 50-295/98-06 & 50-304/98-06 on 980330-0403.No Violations Noted.Major Areas Inspected:Plant Support IR 05000295/19980041998-03-31031 March 1998 Insp Repts 50-295/98-04 & 50-304/98-04 on 980203-0313.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000295/19980021998-03-0606 March 1998 Insp Repts 50-295/98-02 & 50-304/98-02 on 980112-0219.No Violations Noted.Major Areas Inspected:Plant Support ML20203H8841998-02-25025 February 1998 Insp Repts 50-295/97-32 & 50-304/97-32 on 971217-980202. Violations Noted.Major Areas Inspected:Operations, Engineering & Plant Support ML20203H8601998-02-25025 February 1998 Notice of Violation from Insp on 971217-980202.Violation Noted:Licensee Returned to Svc Valves 2FW0038 & 2FW0042 in Locked Position Instead of Locked Closed Position ML20202D7291998-02-0606 February 1998 Notice of Violation from Insp on 970120-23.Violation Noted: on 980115,radiation Protection Technician Performed Calibration of Auxiliary Bldg Exit Personnel Contamination Monitor & Failed to Reset Monitor to Initial Setting ML20202D7441998-02-0606 February 1998 Insp Repts 50-295/98-03 & 50-304/98-03 on 980120-23. Violations Noted.Major Areas Inspected:Plant Support Performance & Specifically,Evaluation of Effectiveness of Radiation Protection Program IR 05000295/19970271998-01-30030 January 1998 Insp Repts 50-295/97-27 & 50-304/97-27 on 971117-25.No Violations Noted.Major Areas Inspected:Licensed Reactor Operator & Senior Reactor Operator Requalification Training Programs ML20199G3461998-01-27027 January 1998 Insp Repts 50-295/97-23 & 50-304/97-23 on 970908-1216. Violations Noted.Major Areas Inspected:Engineering ML20199G3271998-01-27027 January 1998 Notice of Violation from Insp on 970908-1216.Violation Noted:As of 970724,licensee Failed to Ensure That Training Provided to Selected Contractor Craft & Quality Control Insp Personnel Performing Raychem Splice Applications ML20199A2461998-01-21021 January 1998 Insp Repts 50-295/97-25 & 50-304/97-25 on 971011-1216. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 07100011/20120161998-01-21021 January 1998 Notice of Violation from Insp on 971011-1216.Violations Noted:Procedures Were Not Appropriate to Circumstances in Listed Instances PNO-III-98-006, on 980115,licensee Announced Permanent Shut Down of Station.Util Plans to Maintain Plant in Safstor Decommissioning Mode Until Approx 20141998-01-15015 January 1998 PNO-III-98-006:on 980115,licensee Announced Permanent Shut Down of Station.Util Plans to Maintain Plant in Safstor Decommissioning Mode Until Approx 2014 ML20198P5561998-01-15015 January 1998 Notice of Violation & Proposed Imposition of Civil Penalty in Amount of $110,000.Violations Noted:Three FFD Trained Supervisors Failed to Require for-cause Test for Employee W/Smell of Alcohol in Protected Area ML20216D7411998-01-12012 January 1998 EN-98-002:on 980115,notice of Proposed Imposition of Civil Penalty in Amount of $110,000 Issued to Licensee.Action Based on Severity Level III Problem Involving Implementation of fitness-for-duty Program at Zion Station IR 05000295/19970291998-01-0909 January 1998 Insp Repts 50-295/97-29 & 50-304/97-29 on 971202-05.No Violations Noted.Major Areas Inspected:Licensee Performance During Plant Biennial Exercise of Emergency Plan IR 05000295/19970211997-12-0909 December 1997 Insp Repts 50-295/97-21 & 50-304/97-21 on 970602-0919.No Violations Noted.Major Areas Inspected:Licensee Developed Phoenix Training Program as Part of Station Restart Action Plan ML20203E5111997-12-0505 December 1997 Notice of Violation from Insp on 971027-31.Violation Noted:On 971017-18,entrance to Truck Bay of Radioactive High Level Waste Area Was Not Locked & Personnel Did Not Have Direct Oversight IR 05000295/19970261997-12-0505 December 1997 Insp Repts 50-295/97-26 & 50-304/97-26 on 971027-31. Violations Noted.Major Areas Inspected:Plant Support, Performance & Evaluated Effectiveness of Radiation Protection Program IR 05000295/19970311997-12-0404 December 1997 Predecisional Enforcement Conference Repts 50-295/97-31 & 50-304/97-31 on 971201.Violations Noted.Major Areas Discussed:Violations Involving Failures to Adequately Implement fitness-for-duty Program Requirements ML20202D9291997-11-28028 November 1997 Notice of Violation from Insp on 970830-1010.Violation Noted:On 970910,while Returning QA Fire Pump Breaker to Svc IAW out-of-svc Number 970009297,non-licensed Operator Did Not Close Control Power Knife Switch as Required ML20202D9401997-11-28028 November 1997 Insp Repts 50-295/97-22 & 50-304/97-22 on 970830-1010. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000295/19970171997-10-10010 October 1997 Insp Repts 50-295/97-17 & 50-304/97-17 on 970619-0922.No Violations Noted But pre-decisional Enforcement Conference Will Be Scheduled to Discuss Violations Cited.Major Areas inspected:fitness-for-duty Related Events IR 05000295/19970181997-10-0202 October 1997 Insp Repts 50-295/97-18 & 50-304/97-18 on 970409-0730. Violations Noted.Major Areas Inspected:Engineering ML20211J7991997-10-0202 October 1997 Notice of Violation from Insp on 970409-0730.Violation Noted:Zion Station Measures to Control Matls Were Inadequate & Did Not Prevent Installation of Following,From 1992 to 1997,high Efficiency Particulate Air Filters ML20217F0861997-09-30030 September 1997 Notice of Violation from Insp on 970719-0829.Violation Noted:On 970827,engineering Contractor Operated 2C Svc Water Pump Lower Bearing Suppl Isolation valve,2SW0624,w/o Authorization from Operations Dept IR 05000295/19970191997-09-30030 September 1997 Insp Repts 50-295/97-19 & 50-304/97-19 on 970719-0829. Violations Noted.Major Areas Inspected:Operations,Maint & Engineering ML20217A3371997-09-12012 September 1997 Notice of Violation from Insp on 961207-970527.Violation Noted:During 1996 Unit 2 Refueling Outage,Irradiated Fuel Was Moved & Fuel Was Stored in Pool W/Less than 60 Days Decay Time & Fuel Bldg Exhaust Sys Was Operating PNO-III-97-071, on 970903,Comm Ed Announced Series of Mgt Changes & Restructuring of Nuclear Div Organization.New Site Vice Presidents at Braidwood & Quad Cities Former Plant Managers.State of Il Will Be Notified of Mgt Changes1997-09-0303 September 1997 PNO-III-97-071:on 970903,Comm Ed Announced Series of Mgt Changes & Restructuring of Nuclear Div Organization.New Site Vice Presidents at Braidwood & Quad Cities Former Plant Managers.State of Il Will Be Notified of Mgt Changes ML20217R2441997-09-0202 September 1997 Notice of Violation & Proposed Imposition of Civil Penalty in Amount of $330,000.Violation Noted:Primary Nso Did Not Establish Power at or Less than Point of Adding Heat IAW GOP-4,step 5.21.f IR 05000295/19970161997-08-28028 August 1997 Insp Repts 50-295/97-16 & 50-304/97-16 on 970530-0718. Violations Noted.Major Areas Inspected:Operations, Maintenance & Engineering ML20216C4801997-08-28028 August 1997 Notice of Violation from Insp on 970530-0718.Violation Noted:On 970510,during Performance of OSP 97-012,section 5.58,licensee Failed to Close 3L Kiene Valve ML20211C9071997-08-27027 August 1997 EN-97-080:on 970902,notice of Proposed Imposition of Civil Penalty in Amount of $330,000 Issued to Licensee.Action Based on Three Severity Level III Violations Pertaining to Reactivity Mgt Problems & Command/Control Problems IR 05000295/19970201997-08-26026 August 1997 Insp Repts 50-295/97-20 & 50-304/97-20 on 970728-0801. Violations Noted.Major Areas Inspected:Aspects of Licensee Plant Support Performance & Specifically,An Evaluation of Effectiveness of RP Program ML20217R3411997-08-26026 August 1997 Notice of Violation from Insp on 970728-0801.Violation Noted:High Radiation Area W/Radiation Levels Greater than 1000 Mrem/Hr Was Not Locked & Personnel Did Not Have Direct Oversight of & Positive Control Over Each Entry Into Area IR 05000295/19970131997-08-15015 August 1997 Insp Repts 50-295/97-13 & 50-304/97-13 on 970404-0529. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support Re Failure to Immediately Notify CR of Fire in Unit 1 Containment Resulting in Violation ML20217P9661997-08-15015 August 1997 Notice of Violation from Insp on 970404-0529.Violations Noted:Fire Resulted When Mechanical Maint Personnel Did Not Ensure That Adequate Natural or Mechanical Ventilation Was Established While Applying Flammable Lubricant to Rv Holes ML20149G6381997-07-17017 July 1997 Insp Rept 50-295/97-12 on 970311-0425.Violations Noted.Major Areas Inspected:Operations,Maint & Engineering Associated W/Unit 1 Loss of Offsite Power Event That Occurred on 970311 ML20149G6341997-07-17017 July 1997 Notice of Violation from Insp on 970311-0425.Violation Noted:On 970311,licensee Identified That Procedure Did Not Exist for Responding to Loss of Offsite Power That Resulted When Unit 1 Sys Auxiliary Transformer Tripped ML20149H9961997-07-16016 July 1997 Predecisional Enforcement Conference Rept on 970703.Areas Discussed:Violations Noted in Insp Repts 50-295/97-02, 50-304/97-02,50-295/97-07 & 50-304/97-07 on 970206-0402 & 0312-0428 & Corrective Actions IR 05000295/19970151997-06-26026 June 1997 Insp Repts 50-295/97-15 & 50-304/97-15 on 970602-06.No Violations Noted.Major Areas Inspected:Licensee Plant Support Performance & Effectiveness of RP Program 1999-09-01
[Table view] |
See also: IR 05000722/2008030
Text
.
-U.S. NUCLEAR REGULATORY COMMISSION
REGION III
Report Nos. 50-295/85027(CRS); 50-304/85028(DRS)
Docket Nos. 50-295; 50-304 License Nos. DPR-39; DPR-48
Licensee: Commonwealth Edison Company
.P. O. Box 767
Chicago, Illinois 60690
Facility Name: Zion Nuclear Power Station, Units 1 and 2
Inspection At: Zion, Illinois
Inspection Conducted: July 22 through Auge t 30. 1985
IfM.}l.d Y Dtd d' M
Inspector: bcCormick-Barger b28- h5
Date
3 _
0 S 9 ()V
Approved By: M. A. Ring, Chief
Test Programs Section Date
Inspection Summary
Inspection on July 22 through August 30, 1985 (Report No. 50-295/85027(DRS);
50-304/85028(DRS))
Areas Inspected: Routine, announced inspection of licensee actions on
previous inspection findings, general program requirements for Unit 1
Cycle 9 Startup Testing, reactor thermocouple /RTD cross calibration,
isothermal temperature coefficient measurement, doppler coefficient
measurement, control rod drive and rod position indication checks, and
incore/excore calibration. The inspection involved 94 inspector-hours
onsite.
Results: No violations or deviations were identified.
0
8509270095
ADOCK
850 295
PDR PDR
G
_ _ _ _ _ _ _ _ _ _
.
.
DETAILS
1. Persons Contacted
- K. Graesser, Station Manager
- T. Rieck, Station Superintendent, Services
- W. Kurth, Assistant Superintendent, Services
- C. Schultz, Assistant Technical Staff Supervisor
- R. Chin, Nuclear Group Leader
- W. Stone, Quality Assurance Supervisor
- J. Ballard, Quality Control Supervisor
Additional station technical and administrative personnel were
contacted by the inspector during the course of the inspection.
- Denotes those personnel present at the exit interview.
2. Licensee Action on Previous Inspection Findings
(Closed) Open Item (295/82-21-01): This item involved two concerns -
the lack of acceptance criteria for the wide range Resistance Temperature
Detectors (RTD) in surveillance procedure TSS 15.6.72, "RTD Cross
Calibration," dated November 10, 1981 and that 15 of the 65 incore
thermocouples for Unit 1 Cycle 7 were inoperable.
The inspector reviewed TSS 15.6.72, "RTD Cross Calibration," dated
September 20, 1984, and noted that it contained the following acceptance
criterion for the wide range RTDs: " Step 6.13. Evaluate the wide range
RTDs using the following acceptance criterion: -6 F 1 (predicted wide
range RTD temperature - average temperature of all the good narrow range
RTDs) 5 0.5 F." A review of the incore thermocouples for operability
based on the results of TSS 15.6.72, dated September 20, 1984, and
performed for Unit 1 Cycle 9 on September 7-13, 1985, indicated that
only 5 of 65 incore thermocouples were inoperable which the inspector
cormiders acceptable.
3. General Program Requirements for Unit 1 Cycle 9 Startup Testing
The inspector utilized the following documents during a review of
general program requirements for Unit 1 Cycle 9 Startup Testing:
- Reload Safety Evaluation Zion Nuclear Plant, Unit 1
Cycle 9, July 1984.
- NRC letter J. Norris to D. L. Farrar, NRC transmittal
of Technical Specification Amendments No. 89 to DPR-39
and No. 79 to DPR-48 and the associated safety evaluation 1
'
report, dated May 24, 1985.
2
. _ _ _ _ _ - _ - _ _
.
.
- Commonwealth Edison (CECO) Internal Memorandum,
H. E. Bliss, Nuclear Fuel Services Manager, to
K. L. Graesser, Zion Station Manger, " Zion 1 Cycle 9
CAOC Analysis Based on Actual E0C8 Burnup," Z1C9/043,
dated June 7, 1985.
- Safety Parameter Interaction List for Zion, Unit 1
Cycle 9, approved January 4,1984.
- Zion 1, Cycle 9, Nuclear Design Report, NFSR-0035,
Revision 0.
l
- CECO memo, H. E. Bliss to K. L. Graesser, " Revision
to Table 7.2 of Zion, Unit 1 Cycle 9 Nuclear Design
Report," dated August 2, 1985.
'
- CECO memo, H. E. Bliss to K. L. Graesser, " Zion 1
Cycle 9 Rod Exchange Data," Z1C9/040, dated May 9, 1985.
- Technical Staff Surveillance (TSS) Procedure 15.6.51,
"Zero Power Physics Measurements Following Refueling,"
dated June 3, 1985 and performed for Unit 1 Cycle 9
on June 14-16, 1985.
- TSS Procedure 15.6.61, "At Power Physics Measurements
Following Refueling," dated January 10, 1984, and
performed for Unit 1 Cycle 9 on June 21, 1985
to July 27, 1985.
With regard to TSS 15.6.51, "Zero Power Physics Measurements Following '
Refueling," the results evaluation discussed inconsistencies in boron
sample measurements taken during startup physics testing. Boron sample
measurement inconsistencies were also identified in the results
evaluation for TSS 15.6.51, dated July 2, 1984, and performed for Unit 2,
Cycle 8 on July 4-7, 1984. For Unit 1 Cycle 9, differences between two
measurements of the same boron sample were as much as 67 ppm and,
for Unit 2 Cycle 8, were as much as 45 ppm. The corrective actions
discussed in the Unit 2 Cycle 8 test evaluation recommended that a
meeting be held between the Nuclear Group and the station chemists to
discuss the importance of boron sampling measurements. Although no
meeting minutes were kept, the Station Nuclear Engineer stated that
this meeting had taken place prior to the Unit 1 Cycle 9 startup. To
calibrate the boron measurement instrumentation, a standard with known
boron concentration is used. In an attempt to improve boron sample
measurements, the Unit 1 Cycle 9 test evaluation indicated that the
licensee intends to investigate the possibility of using a standard
with a boron concentration nearer to the boron concentration of the
samples being measured. Review of the licensee's corrective actions
in a subsequent NRC inspection will be tracked as an open item
I
L
(295/85027-01).
I
.s
3
i
k . .
.
.
. . . . _ _ - _ _ _ _ _ - _ - _ _ _ -
TSS 15.6.51 and TSS 15.6.61 both contained steps requiring that the
manufacturer, model and serial number of all instruments used in the
reactivity computer system be recorded. In both cases, the inspector was
unable to locate this information in the completed test packages. In
discussions of this matter with the licensee, the licensee explained
that, since Zion has only one reactivity computer system, a standard
type written sheet had been developed which provided all of this
information. This sheet was inadvertently omitted from the completed
test packages. The licensee stated their intent to take the necessary
actions to ensure that future test packages include reactivity computer
system data as required.
Paragraph 5.a of this report contains comments regarding the Zion 1
Cycle 9 Nuclear Design Report and CECO memo, " Revision to Table 7.2 of
Zion, Unit 1 Cycle 9 Nuclear Design Report," dated August 2, 1985.
No violations or deviations were identified. However, a portion of this
area requires further review and evaluation and is considered to be an
open item.
4. Reactor Thermocouple /RTD Cross Calibration
The inspector reviewed surveillance procedure TSS 15.6.72, "RTD Cross
Calibration," dated September 20, 1984, and performed for Unit 1 Cycle 9
on June 7-13, 1985, to determine that results obtained were within
prescribed limits and that any discrepancies were properly evaluated.
During this review the inspector noted that the results for one of the
wide range RTDs did not meet the acceptance criterion for wide range RTDs
of: "-6 F <_ (predicted wide range RTD temperature minus the average
temperature of all the good narrow range RTDs) < 0.5 F." The licensee
stated that an evaluation of this condition tooE place prior to proceeding
with the Unit 1 Cycle 9 initial startup. The inspector had no evidence
that would contradict that statement. However, the documented evaluation
was not signed until June 27, 1985. (The test which was required to be
performed prior to initial criticality was performed on June 12-13, 1985, ,
initial criticality occurred on June 14, 1985, and Unit 1 was at 88% power
'
on June 25, 1985.) In discussions with the licensee concerning this
matter, the licensee agreed that, in the future, the evaluation of a
startup test acceptance criterion that was not satisfied would be
documented prior to proceeding with the startup testing. This is an
open item pending NRC review during the next core physics startup
testing inspection (295/85027-02).
No violations or deviations were identified. However, a portion of this
area requires further review and evaluation and is considered to be an ,
open item. )
5. Isothermal Temperature Coefficient and Doppler Coefficient
The inspector reviewed licensee procedures and results to verify that
prerequisites, precautions and plant conditions were met, that results
4
were within acceptance criteria and consistent with Technical
Specifications and that any discrepancies were properly evaluated.
The inspector utilized the following procedures during the review:
- TSS 15.6.54, " Isothermal Moderator Temperature Coefficient
Measurements," dated May 27, 1982, and performed for Unit 1
Cycle 9 on June 15, 1985.
- TSS 15.6.62, " Moderator Temperature Coefficient Measurement,"
dated July 9, 1980, (with Station Procedure Change Request
A85-613 approved June 27, 1985, attached) and performed for
Unit 1 Cycle 9 on July 9, 1985.
- TSS 15.6.62, " Moderator Temperature Coefficient Measurement,"
dated July 9,1980, (with Station Procedure Change Request
A85-613 approved June 27, 1985, attached) and performed for
Unit 1 Cycle 9 on July 27, 1985.
- TSS 15.6.63, " Doppler Coefficient Measurement," dated
February 8, 1985, (with Station Procedure Change Request
A85-612 approved June 27, 1985, attached) and performed for
Unit 1 Cycle 9 on July 9, 1985.
- TSS 15.6.63, " Doppler Coefficient Measurement," dated
February 8, 1985, (with Station Procedure Change Request
A85-612 approved June 27, 1985, attached) and performed for
Unit 1 Cycle 9 on July 22, 1985.
The inspector also utilized the following document during the review:
- " Nuclear Design Report for Zion, Unit 1 Cycle 9," NFSR 0035,
Revision 0, Nuclear Fuel Services - Commonwealth Edison Company,
dated April 1985.
a. During the test evaluation for TSS 15.6.54, " Isothermal Moderator
Temperature Coefficient Measurements," performed on June 15, 1985, a
member of the Technical Staff discovered an apparent error in
Table 7.2 of the Nuclear Design Report. In discussions between the
Technical Staff and the Nuclear Fuel Services Section, it was
confirmed that an error existed in the method used to generate the
moderator temperature coefficient component of the isothermal
temperature coefficient reported in Table 7.2. Table 7.2 was
subsequently corrected via a memo from H. E. Bliss, Nuclear
Fuel Services Manager, to K. L. Graesser, Zion Station Manager,
" Revision to Table 7.2 of Zion, Unit 1 Cycle 9 Nuclear Design
Report," Z1C9/045, dated August 2, 1985. Other than this memo,
members of the Technical Staff were not cognizant of corrective i
actions taken by the Nuclear Fuel Services section. Therefore, l
pending an NRC inspection of the CECO Nuclear Fuel Services section l
to review the licensee's corrective actions to prevent recurrence l
of errors in nuclear design reports, this is considered an unresolved
item (295/85027-03).
5
.-- -_--
1
--
- _ _ _ - . - - - - - - - - - - - - - _ _ _ _ ,
.
b. The test evaluation for TSS 15.6.63, " Doppler Coefficient
Measurement," performed on July 9, 1985, stated that all design
and safety criteria were met. However, the measured doppler
coefficient was -7.59 pcm/% power which was outside of the design
acceptance criterion band of -8.95 1.34 pcm/% power (i.e.,
-7.61 to -10.29 pcm/% power). At the time that the inspector
reviewed the test evaluation, the Technical Staff Supervisor had
not signed the procedure yet. Additionally, a subsequent doppler
coefficient measurement had been performed on July 22, 1985, which
resulted in a doppler coefficient value that did meet the design l
acceptance criterion. Following discussion of this matter with the '
licensee, the licensee rewrote the test evaluation to reflect the
fact that the design acceptance criterion for the doppler coefficient
had not been met in the July 9 instance.
No violations or deviations were identified. However, a portion of this
area requires further review and evaluation and is considered to be an
l unresolved item.
6. Control Rod Drive and Rod Position Indication Checks
i
f The inspector reviewed licensee procedures and results to verify that
} prerequisites, precautions and plant conditions were met, that results i
l' were within acceptance criteria and consistent with Technical l
Specifications and that any discrepancies were properly evaluated.
The inspector utilized the following procedures during the review:
January 1, 1985, and performed for Unit 1 Cycle 9
on June 10-12, 1985.
- TSS 15.6.57, "Checkcut of the Bank Overlap Unit,"
dated March 12, 1984, and performed for %it 1
Cycle 9 on June 11, 1985.
a. With regard to TSS 15.6.26, " Control Rod System Checkout,"
the inspector noted the following:
(1) All rod drop times satisfied the acceptance criterion
of 2.4 seconds or less required by the Technical
Specifications.
(2) The inspector reviewed the slave cycler strip chart traces
for power cabinets 180 and 1AC and the rod drop timing traces
for rods in Shutdown Banks A, C, and D, and Control Bank A.
The inspector had no cor,cerns as a result of the review of
these strip charts.
(3) Surveillance test TSS 15.6.26 was required to be completed
prior to initial criticality per Technical Specification 3/4.2.3.C.
However, the signatures in the last section of the procedure
(the test results evaluation section) were as follows:
6
.
.
!
Initial Criticality, June 14, 1985
Test Engineer's Signature, June 21, 1935
(Reactor at approximately 49% power)
l Station Nuclear Engineer's Signature, July 10, 1985
!
(Reactor at approximately 100% power)
Technical Staff Supervisor's Signature, July 19, 1985
l The licensee stated that the startup test surveillances are
considered to be complete when the last step is complete which
, is prior to the test evaluation section writeup, but these
surveillances were not signed and dated until after the test
evaluation was complete.
During discussions with the licensee, the licensee stated their
intent to review the startup test procedures and revise them as
i
necessary to provide for signatures and dates that would signify
completion of the tests to the extent necessary to satisfy
L surveillance requirements prior to proceeding with a reactor
startup. This is an open item (295/85027-04) pending procedure
revisions and subsequent NRC review.
b. With regard to TSS 15.6.57, " Checkout of the Bank Overlap Unit," the
inspector noted the following:
l (1) Step 7.5.2 stated, "All rod positioning indicators are reading
zero steps." When this step was signed, however, some of the
Rod Positioning Indicators (RPI) were not reading zero as
documented in the Data Sheet Section. For example, for
Shutdown Bank A the following values were recorded:
Rod Designation (Group) RPI Recorded Steps
M2(2) l 5
l D2(1) l -5
j P4(1) l 5
t B4(2) l 0
P12(2) l 0
l
B12(1) l 0
M14(1) l 5
D14(2) l 7
During discussions between the inspector and the licensee,
the licensee indicated that:
(a) This test was performed prior to the RPIs being
calibrated (that is, prior to TSS 15.6.26 being
performed) anJ, therefore, a precaution statement
should have been included in the procedure to state
that the RPI signals are not valid prior to
7
.
.
TSS 15.6.26 being completed. (The procedure
contained precaution 5.6 which stated, "If this
test is performed in cold shutdown, the RPI signals
are not valid since they are calibrated for hot
shutdown conditions." This precaution did not
apply to TSS 15.6.57 as performed on June 11,1985,
because it was performed at hot shutdown conditions.)
(b) The intent of Step 7.5.2 was for the RPIs to read
within a tolerance band of zero steps.
The licensee initiated a procedure change request on
August 15, 1985, to include the precaution and tolerance
band discussed above.
(2) The test evaluation section stated, "Several of the rod
bottom lights did not clear at 20 steps which is acceptable
since the RPI calibration had not yet been performed." The
Precautions, Limitations and Setpoint document establishes
20 steps as the setpoint for the rod bottom bistables. Upon
the inspector's request to review the documentation that showed
that the rod bottom lights had cleared at 20 steps (following
the RPI calibration), the licensee responded that the check
was made but was not documented. In discussions with the
licensee, the Station Nuclear Engineer stated that the station
procedures would be modified to include a check that the rod
bottom lights go out at 20 steps during the initial startup
following a refueling. This is an open item (295/85027-05)
pending the procedure revision and subsequent NRC review.
No violations or deviations were identified. However, portions of
this area require further review and evaluation and are considered
to be open items.
7. Incore/Excore Detector Calibration
For Unit 1 Cycle 9, the inspector reviewed licensee procedures to verify
that prerequisites, precautions and plant conditions were met, that
results were within acceptance criteria and consistent with Technical
Specifications and that any discrepancies were properly evaluated. The
inspector utilized the following procedures during the review:
- TSS 15.6.2, "NIS Calibration," dated March 1, 1985,
and performed for Unit 1 Cycle 9 on July 3, 1985.
- TSS 15.6,0, " Flux Map Data Acquisition, Power
Distribution and Incore/Excore Axial Imbalance Checks,"
dated January 12, 1984, and performed for Unit 1
Cycle 9 on:
July 2, 1985 (associated with Flux Map 1-9-06)
July 3, 1985 (associated with Flux Map 1-9-07)
8
- - .
.
= - -
.
.
July 3, 1985 (associated with Flux Map 1-9-08)
During the review, the inspector noted that surveillance test TSS 15.6.2,
"NIS Calibration," was required to be completed prior to exceeding 90%
power per Technical Specification 3.2.2.C.1. However, tne signatures in
the last section of the procedure (the test results evaluation section)
were as follows:
Unit 1 exceeded 90% power, July 5,1985
Test Engineer's Signature, July 8, 1985
Station Nuclear Engineer's Signature, July 10, 1985
Technical Staff Supervisor's Signature, July 19, 1985
This is another example of the situation discussed in Paragraph 6.a.(3)
of this inspection report. Refer to Paragraph 6.a(3) for additional
discussion.
The inspector reviewed the following procedures performed during
Unit 1 Cycle 8 to verify that Technical Specification 3.2.2.C.1,
concerning periodic checks and recalibrations of the excore nuclear
detectors, was being met.
- TSS 15.6.2, "NIS Calibration," performed for Unit 1
Cycle 8 on the following dates:
February 18, 1984
May 15, 1984
September 10, 1984
December 15, 1984
- TSS 15.6.0, " Flux Map Data Acquisition Power Distribution
and Incore/Excore Imbalance Checks," performed 29 times for
Unit 1 Cycle 8 between February 11, 1984 and December 28,
1984, inclusive.
No violations or deviations were identified.
8. Open Items
Open items are matters which have been dis:ussed with the licensee, which
will be reviewed further by the inspector, oi1 which involve some action
on the part of the NRC or licensee or both. Lpen items disclosed during
the inspection are discussed in Paragraphs 3, 4, 6.a.(3), and 6.b.(2).
9. Unresolved Items
Unresolved items are matters about which more information is required
in order to ascertain whether they are acceptable items, items of
noncompliance, or deviations. An unresolved item disclosed during
the inspection is discussed in Paragraph 5.
9
.-
..
10. Exit Interview
- The inspector met with licensee representatives denoted in Paragraph 1 at
the conclusion of.the inspection on August 30, 1985. The inspector
summarized the scope of the inspection and the findings. The inspector
-
.al so discussed the likely informational content of the inspection report
with regard to documents or processes reviewed by the inspector during
the inspection. The licensee did not identify any such
documents / processes as proprietary.
?,
10