ML20212A210

From kanterella
Jump to navigation Jump to search
Forwards Rev 3 of Gpu Nuclear Post-Defueling Monitored Storage QAP for Three Mile Island Unit 2, Including Changes Made During 1998.Description of Changes Provided on Page 2
ML20212A210
Person / Time
Site: Three Mile Island Constellation icon.png
Issue date: 09/13/1999
From: Langenbach J
GENERAL PUBLIC UTILITIES CORP.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20212A214 List:
References
1920-99-20503, NUDOCS 9909160115
Download: ML20212A210 (1)


Text

y

^

l: 's 's I-n l  : GPU Nuclear,inc.

( , Route 441 South NUCLEAR P**'**c' * ****

Middletown, PA 17057 0480 .

Tel717 944 7621 1920-99-20503 l

September 13, 1999 l U.S. Nuclear Regulatory Commission l Attn: Document Control Desk l Washington, DC 20555 l

6

Subject:

Three Mile Island Nuclear Station, Unit 2 (TMI-2)

. DPR-73/ Docket No. 50-320 Revision 3 of the Post-Defueleg Monitored Storage (PDMS) Quality Assurance (QA)

Plan for TMI-2 4

t

Dear Sirs:

I. In accordance with 10CFR 50.54(a)(3), GPU Nuclear is submitting the PDMS QA Plan to which changes were made during 1998. GPU Nuclear conducted a formal review of the changes reflected in the plan. That l review concluded that the changes do not constitute a reduction in commitment.

l l Revision 3 is a general revision. The " Document History" on page 2 of the enclosed document provides a l l description of all the changes made with revision 3.

I I ' Should you have any questions or require additional information, please contact Adam Miller of TMI Licensing at (717) 948 8128.

Sincerely, b ',

l James W. Langenb Vice President and Director, TMI i AWM I

Enclosure cc: Region 1 Administrator TMI Senior Resident inspector TMI-2 Project Manager N 9909160115 990913 \

PDR P

ADOCK 0 g0 s 1