Special Rept 1-SR-92-008:on 921007 & 09 EDG Bldg 50 Feet Elevation Fire Barrier Seals DG-3-437,472 & 473 Declared Inoperable,Respectively to Support Plant Mod 92-069.Seals Will Be Restored Prior to Startup of Either Unit
ML20116K240
Person / Time
Site: Brunswick  Duke energy icon.png
Issue date: 11/10/1992
From: Morgan R
CAROLINA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
1-SR-92-008, 1-SR-92-8, BSEP-92-0036, BSEP-92-36, NUDOCS 9211170086
Download: ML20116K240 (2)


Text

.

9

@9&L BorrestutuuramstBeastsenstasseme Cetolina Power & tight Company gangraren n w w w w a.ga Drunswick lauclear Project P. O. Box 10429 Southport, 11. C . 20461-0429

[a L '.

FILE: D09-13510C SERIAL: BSEP-92 0036 U.S. Iluclear Hugulatory Comminolon ATTil Document Control Dosh Washington, D. C. 2 0 b 5 f.

DRUt1SWICK STEAM ELECTRIC PLAllT Uti!T 1 A!4D 2 DOCKET 110. 50-325 AllD 50-324 LICE!1SE ;40. DPR-71 AllD DPR-62 SPECIAL REPORT PER TECll!4ICAL SPECIFICATI011 3.7,0A AtID Ell [mi!AllT TO TICIR{1 GAL SPECIFICATIOli 6.9.2 ( 1- S D -9 2-000),

contlemens Unita 1 and 2 are in Cold Shutdown to supnort the Unit outages that started on April 21,1992. The following summariene fire protection Limiting conditions for Operation (LCO) A2-92-F0737, A2-92-F0750, and A2-92-F0751 that were initiated to suppoet a major outage project being por ' irmod in the Emergency Diesel conorator Duilding:

, Ud2L32-92-P0732 At 114v on October 7,1992, an Emergency Diosol Gonorator Building SU' clovation fire barrior soal (DO-3-437), for the Aqueous Film Forming Foam ( AFFF) room, was declared inoperable. This was required to support the addition e f a firo/ tornado dampor by Plant Hodification 92-069. A fire watch was stationed prior to the barrior being made inoperable and will remain in place until the barrior is restored. The fire neal has remained inoperable longer than the suvon days epocitied by the Technical Spocification LCO requiring this Special Report. The barrior will be restored p" lor to the Startup of either Unit.

9211170006 921110 PDit ADOCK 0D000324 PDR

[f [

/

Ihi A

- - ~ . , . _ . . . - _ . . . .--

i e  ?

DSER-92-0036 j i

JLec) A2-92-F0750 t A2-92-F0751 l r

l

_At 1500 on October 9, 1992, Emergency Diesel Cenerator Building 50' elevation fire barrier seals (00-3-472 and D0-3-473) for the North and South stairwells were declared inoperable. This was ' required to support the addition of a  ;

fire / tornado damper by Plant Modification 92-069. . Prior to the fire barriers i being made inoperable a fire watch was stationed and will remain in place until  !

the barriers'are restored. The fire seals have remained inoporable longer than the seven days specified by the Technical specification Leo requiring this ' ,

special Report. The barriers will be restored prior to the startup of either ,

Unit.  !

i I

i

-i Very truly yours,

$k?jjd R. E. Hotgan, Plant Manager Unit 1-  !

Drunswick Nuclear Project  ;