ML20105B246

From kanterella
Jump to navigation Jump to search
Special Rept:On 920810,fire Barrier Between Control Bldg Stairwell & 23-ft Elevation Cable Spread Room Declared Inoperable to Support Planned Mod.Hourly Fire Watch Will Remain in Place Pending Restoration of Fire Barrier
ML20105B246
Person / Time
Site: Brunswick Duke energy icon.png
Issue date: 09/14/1992
From: Spencer J
CAROLINA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9209180261
Download: ML20105B246 (1)


Text

-. - . . - ~ . .

~

C N LL

.; s . . .;: -

s l

Carolina Power & Lignt Company INDUMMM53N!RIMB8BBWEH5EMutEMB Brunswick Nuclear ' Proj ect P. O. Box 10429 Southport, N.C. 28461-0429 SEP 14 RECB FILE: B09-13510C SERIAL: BSEP-92-0010 U.S. Nuclear Regulatory Commission ATTN: Document Control. Desk Washington, D. C.'20555 i B4UNSWICK STEAM ELECTRIC PLANT UNIT 1

DOCKET NO. 50 325 LICENSE NO. DPR-71 i SPECIAL REPORT PER TECHNICAL SPECIFICATION 3.7.8A AND i PURSUANT TO TECHNICAL SPECIFICATION 6.9.2 (1-SR-92-00 3 l Centlemen:

1-i

The following is a sum
mary of fire protection Limiting Condition for Operation
(LCO) Al-92-F0542. The LCO is the result of a major outage modification being performed on the common Control Building.

1

! At 0730 on August 10. 1992, the fire barrier i>etween the Unit 1 Control Building-

! stairwell and the 23' elevation cable spread room was declared inoperable. _ This

j. was done in support of Plant Modificacion (PM)91-011, which would require
drilling bolt holes in the stairwell's South wall as part of adding new wall i supports. With the . fire detectors operable on at least-one side of the fire i barrier, an hourly fire watch was - stationed and remains in . place pending j_ res coration of the fire barrier. As of August 17, 1992, the PM had taken longer r than the 7 days specified by the Technical Specification LC0_and required this j Special Report. The PM will allow th restoration of the fire barrier prior to i the Startup of either Unit.

Ve'ry truly yours,

w~~4
p. W . Spencer Ge eral Manager Scun alck Nucl a Proj ec t -
l I

cc: Mr. S. D. Ebnetec i

. Mr. R. H. Lo

[ BSEP NRO Resident Office l

l

-~

I

$Db f D v 1

. me.