ML20086D604

From kanterella
Jump to navigation Jump to search
Industrial Pretreatment Quarterly Self-Monitoring Results for Mar 1995
ML20086D604
Person / Time
Site: Perry FirstEnergy icon.png
Issue date: 03/16/1995
From:
CENTERIOR ENERGY
To:
Shared Package
ML20085H223 List:
References
NUDOCS 9507100267
Download: ML20086D604 (1)


Text

, ,. .. -- - - _ - - - _ - - - - - .

y; ' ,g g 4..

u

\9 C <

INDUSTRIAL PRETREATMENT OUARTERLY-SELP-MONITORING RESULTS Perry Nuclear Power Plant Permit No.: 1004911

~

.10' Center Rd. Report Date -3/21/95 L Perry,. Ohio 44081 Laboratory: Quanterra Date of Sample: 3/3 to 3/4/95 Time of sample: 900 Sample Location: Sewage Pump Station Name of Sampler: Greg Newman I Laboratory Address: 1401 Shuffel Dr.

L North Canton OH 44720 L

Date of Analysis 3/3 to 3/16/95 Flev: 33,000 gpd l

Name of Analyst: M. Recznik PARAMETER SAMPLE EPA ANALYSIS ANALYSIS

' TYPE METHOD DATE RESULT COD Composite 410.4 3/13 120 mg/L BOD Composite 405.1 3/3 to 3/8 9 ag/L l TSS- Composite 160.2 3/6 to 3/7 110 mg/L Silver. Composite 200.7 3/10 to 3/16 None Detected Mercury Composite 245.1 3/9 to 3/16 None Detected pH ,. Grab 150.1 3/3 8.7 s.u.

Oil / Grease Grab 413.1 3/13 to 3/14 32 mg/L Gravimetric I certify under penalty of law that I have personally examined and I am 1 familiar with the information in this report and that, based on my inquiry l of those persons immediately responsible for obtaining the information I contained in this report, I believe that the information is true, accurate, and complete. I am aware that there are significant penalties for

-submitting false in Srmation including the possibility of fine .nd imprisonment b Vice President - Nuclear Signa".ure Date Title DR R

_________