ML20140C793
| ML20140C793 | |
| Person / Time | |
|---|---|
| Site: | Perry |
| Issue date: | 03/31/1997 |
| From: | CENTERIOR ENERGY |
| To: | |
| Shared Package | |
| ML20140C784 | List: |
| References | |
| NUDOCS 9706100070 | |
| Download: ML20140C793 (1) | |
Text
._ ----. __
m _ _.. _. _. _ _
__,_m l-4,-
4 i
1 INDUSTRIAL PRETREATMENT
}
QUARTERLY SELF-MONITORING RESULTS l
Perry Nuclear Power Plant Permit No.: 1004911 L
10 Center Rd.
Report Date: 3/12/97 j
Perry, Ohio 44081 Laboratory: Electro-Analytical l
L Date of Sample: 3/3 to 3/4/97 Time of sample: 8:45 Sample Location: Sewage Pump Station Name of Sampler: Beckler
\\
Laboratory Address: 7118 Industrial Park Blvd.
Mentor, Ohio 44060-5314 Date of Analysis 3/4 to 3/10/97 Flow: 33,000 gpd PARAMETER SAMPLE EPA ANALYSIS ANALYSIS TYPE METHOD DATE RESULT COD Composite 410.4 3/06/97 84 mg/L BOD Composite 405.1 3/10/97 53 mg/L TSS Composite 160.2 3/10/97 98 mg/L Silver Composite 200.7 3/06/97
<.05 mg/L Mercury Composite 245.1 3/07/97
<.5 ug/L pH Grab 150.1 3/04/97 8.3 s.u.
Oil / Grease Grab 413.1 3/06/97 6.8 mg/L Gravimetric I certify under penalty of law that I have personally examined and I am familiar with the information in this report and that, based on my inquiry of those persons immediately responsible for obtaining the information contained in this report, I believe that the information is true, accurate, and complete.
I am aware that there are significant penalties for submitting false information including the possibility of fine and imprisonment.
M t' AM/T6-
lb2 Sr. Vice President - Nuclear Signatury
/
/ / Date Title t.
9706100070 970606 PDR ADOCK 05000440 R