Special Rept SR 1-93-013:on 931117,fire Protection LCO A1-93-F0859 Initiated on Fire Seal R1-2-077.Seal Inoperable to Facilitate Overspeed Trip Setting Testing of HPCI & RCIC Sys.Fire Seal Restored on 931204
ML20059B435
Person / Time
Site: Brunswick Duke energy icon.png
Issue date: 12/22/1993
From: Cowan J
CAROLINA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
BSEP-93-0238, BSEP-93-238, SR-1-93-013, SR-1-93-13, NUDOCS 9401040136
Download: ML20059B435 (1)


Text

1 i:

gpgg Carolina Power & Ught Company.

gazmuwmwi--ww m m Brunswick Nuclear Plant P. O. Box 10429 ,

Southport, NC 28461-0429 DEC 2 21993 FILE: B09-13510C SERIAL: BSEP-93-0238 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk '

washington, D.C. 20555 BRUNSWICK STEAM ELECTRIC PLANT UNIT 1 DOCKET NO. 50-325 -i LICENSE NO. DPR-71 i i

SPECIAL REPORT PER TECHNICAL SPECIFICATION 3.7.8 AND ,

PURSUANT TO TECHNICAL SPECIFICATION 6.9.2 (SR 1-93-013) 1 1

i Gentlemen:

I Unit'1 is . in a Refueling outage. The following summarizes - fire protection .

Limiting Condition for Operation (LCO) Al-93-F0859. .'

On November 17, 1993, fire protection LCO A1J93-F0859 was initiated on. fire seal'= 1 R1-2-077 The seal.is located on the south wall.of the mini' steam pipe tunnel 'I l

in the Unit 1 Reactor Building 20' elevation. The' fire seal was. inoperable to' facilitate the overspeed trip testing of the High ' Pressure - Coolant Injection l (HPCI) and Reactor Core Isolation Cooling (RCIC) systems. The testing required temporary piping to be run through _ the fire seal- to connect the auxiliary steam :

piping with the HPCI and RCIC systems. L Unexpected maintenance activities with the HPCI and.RCIC systems'and-the fire ,

seal caused the testing to exceed the 7 day time window. Applicable fire-detectors were verified operable and an hourly fire watch was. established for the area. The testing was completed and the fire seal'was restored on December 4,.

1993. Compensatory measures . remained in effect until the fire seals were declared operable. This report is ' required due ' to the fire ' seals being inoperable longer than the 7 days allowed by Technical Specifications.

very truly yours, d C _- J J. P.'Cowan- Plant Manager Unit 1-Brunswick Nuclear Plant ~l cc: Mr. S. D. Ebneter i- Mr.,P. D. Milano l BNP NRC Resident Office 4

9401040136 931222 R PDR S

ADOCK 05000325 PDR i  : / [4[/'

[

' $0 .